Powered By Kitlog Pro v2.0
N144GP Lancair Super ES
Lancair Super ES
Wiring
Work Logs Found:
53
Category Work Time:
121 Hours
Date
Hours
Work Log Summary
Details
01-28-2012
3.25
bond preheat to oil pan; safety cylinder bands
Details
12-05-2011
1.25
pull ELT door; work on adding 2nd map light circui
Details
12-05-2011
2.25
more map light work
Details
10-25-2010
6.50
crimp connectors on P-1 power plug
Details
09-06-2010
1.50
work on wiring fwd of panel
09-06-2010
1.50
manifold pressure wiring/plumbing
09-06-2010
1.50
finish crimps; wire ground block
08-30-2010
5.25
work on battery area connections prior to VS close
08-30-2010
0.00
add'l wiring pics
08-15-2010
1.50
starter grid wiring; crimp terminals
Details
08-15-2010
1.00
start hanging wires on firewall behind panel
08-15-2010
1.75
mini molex for fuel flow & rpm; wire pressure sens
08-15-2010
2.00
did all the #2,#8 terminals I had rings for
Details
08-09-2010
7.50
wiring; adels; install TPM cables
Details
08-08-2010
7.75
engine sensor wiring
Details
08-08-2010
0.00
add'l pics- rpm sensor
Details
08-02-2010
2.50
rought run CHT-EGT wires; install probes
Details
08-02-2010
0.75
redo about half of click bonds from yesterday
Details
08-02-2010
1.00
figure big wire rings needed; add grommets to batt
Details
08-02-2010
0.50
cut & grind add'l clearance for batt cover with gr
08-01-2010
4.00
run wires
Details
08-01-2010
2.50
run power wires and plan clamp locations
Details
08-01-2010
1.00
flip starter power grid over; better wire access
08-01-2010
2.50
ad click bonds for tie wraps and adel clamps
08-01-2010
1.50
2 BID ELT shelf; grommet in baffle for alt wire
Details
07-19-2010
5.00
plan and run conduits and grommets
Details
07-19-2010
2.25
micro in couplings and elbows and conduits
Details
07-18-2010
1.75
run COM2, transponder and ELT cables; bond in COM2
Details
07-18-2010
0.25
install OAT probe to lower right wing tip
07-06-2010
1.00
run RG400 for nav in RW; COM1 to vertical stab; Na
07-06-2010
1.00
drill panel for headset jacks; drill rear seat bac
07-06-2010
1.00
click bond studs on wing for fuel probe signal con
Details
07-05-2010
1.10
reverse headset cable pin assignments; drill rear
Details
07-05-2010
1.10
plan and mark out new jack locations on panel
Details
07-05-2010
1.10
install roll servo and rough run cable
Details
07-05-2010
1.10
install pitch servo and cable; back to orig. longe
07-05-2010
1.10
install and level magnetometer
Details
06-28-2010
2.75
wire in capacitance to voltage adapter from Dynon
Details
06-28-2010
4.00
continue wiring; fab landing light attachment; chn
Details
06-27-2010
4.50
run fat wires; install LS-1A voltage regulator
Details
06-27-2010
0.10
flip VR so terminals are facing down; per B&C and
Details
06-14-2010
1.25
redesign power grid; modify; install to R battery
06-14-2010
1.25
install power grid to battery box
06-14-2010
1.00
install ground lug to click bond studs
Details
05-19-2010
4.00
do consolidated wiring diagram
05-17-2010
6.75
continue to run wires
05-17-2010
0.10
add'l wiring pics
05-16-2010
5.25
begin wiring
Details
04-19-2010
3.25
prep and flox servo mounting pads in AN3-5A
Details
04-19-2010
3.00
modify pitch servo arm; fabricate mounting pads
04-18-2010
1.00
work on placing AP servos
Details
04-18-2010
4.00
inventory panel; work on rough wiring diagram
Details
03-29-2009
0.50
adjust Palladin 3 layer stripping tool
Details
SITE NAVIGATION
Contact Builder
Lightning (EAB-LSA) Home
Lancair Super ES Home
Category
# Logs
# Hours
All
1827
4433
Avionics
113
163
Bodywork - misc.
10
25
Electrical
23
36
Elevators
15
60
Empennage
27
28
Engine
33
86
Firewall forward
77
163
Flying - test flying
29
94
Fuselage
633
1070
Garmin 3X Touch pane
139
256
Garmin GMC 507 Autop
18
35
Gear and wheels
102
196
Horizontal Stab
75
148
Interior
7
18
Miscellaneous
128
298
Move
15
60
Paint
1
973
Prop
7
13
Research, prep shop,
1
1
Speed Brakes
22
25
Vert Stab - Rudder
136
166
Wings
163
393
Wiring
53
126
Copyright © 2001-2025 Matronics. All Rights Reserved.