KitLog pro

Powered By Kitlog Pro v2.0

Conrads X-10 Build Log
Work Logs Found: 16
Category Work Time: 56 Hours
 Date
Hours
Work Log Summary

Details

 04-10-2009
8.00
Section 20 Bottom Wing Skins ....Page 20-5 step 11
Details

 04-10-2009
4.00
Section 20 Bottom Wing Skins ....Page 20-5 step 10
Details
     

 04-09-2009
6.00
Section 20 Bottom Wing Skins ....Page 20-5 Steps 8
Details
     

 04-08-2009
3.00
Section 20 Bottom Wing Skins page 20-5 steps 1 to
Details
       

 04-07-2009
1.00
Completed step 1 on page 20-4. For the Right Wing
Details

 04-06-2009
6.00
Section 20 Bottom Wing Skins completed steps 2 to
Details
       

 04-05-2009
2.00
Section 20 Bottom Skins page 20-6 Step 1
Details

 04-04-2009
6.00
Riveting the Bottom Wing Skin W-1005-L
Details
       

 04-03-2009
1.00
Adding the Pitot Mast to the Bottom Skin W-1005 -L
Details
       

 03-31-2009
6.00
Riveting the W-1004-L Bottom Skin
Details
       

 03-25-2009
3.00
Bottom Skins Dimpled and Primmed
Details
       

 03-22-2009
2.00
Bottom Wing Skins adn J-Channel Stiffners #40 Fina
Details
       

 03-21-2009
4.00
Aileron Gap Fairng and Flap Gap Fairing Fillet
Details
       

 03-20-2009
1.00
Running the White Wire in the Wing
Details
       

 03-17-2009
0.50
Stall Waring Wire Wrap
Details

 03-15-2009
2.00
Pitot and AOA Lines Installed
Details
     










Copyright © 2001-2024 Matronics. All Rights Reserved.