Keiths Web Site
RV-12
09. Finishing Kit
Work Logs Found:
101
Category Work Time:
362 Hours
Date
Hours
Work Log Summary
Details
07-20-2010
4.00
Fitting the rudder cables
Details
07-12-2010
3.00
More cowling work
Details
07-12-2010
1.00
Finishing the cowl work
Details
07-09-2010
5.50
Oil access door
Details
07-09-2010
4.00
Cowl bottom bracket
Details
07-08-2010
4.50
Sanding
Details
06-17-2010
4.00
Canopy titivation
Details
06-16-2010
7.50
Odds and Sods
Details
06-08-2010
4.00
More sanding
Details
05-31-2010
3.00
More fairing work
Details
05-26-2010
3.00
Yes more sanding
Details
05-25-2010
7.00
Guess what - more sanding
Details
05-23-2010
1.00
More sanding
Details
05-21-2010
3.50
More sanding...
Details
05-18-2010
4.00
More sanding
Details
05-18-2010
1.00
Check the tank again
Details
05-17-2010
3.00
Sanding...
Details
05-13-2010
3.00
More fibreglass work
Details
05-12-2010
4.00
More fibreglass work
Details
05-11-2010
7.00
More fibreglass preparation
Details
05-10-2010
8.00
Preparing for fibreglass fairing
Details
05-07-2010
4.00
Prepare cowling parts
Details
05-07-2010
3.00
Canopy and cowling
Details
04-30-2010
3.00
Finish resealing the tank
Details
04-29-2010
6.00
Investigate tank leaks
Details
04-28-2010
6.00
Canopy sanding
Details
03-19-2010
6.00
Fitting the canopy
Details
03-18-2010
5.00
More canopy work
Details
03-18-2010
1.00
Canopy work
Details
03-16-2010
5.00
More canopy stuff, and some self-indulgence
Details
03-15-2010
8.00
Canopy handle, and other stuff
Details
03-12-2010
3.50
Drilling the canopy front and rear
Details
03-12-2010
4.00
Canopy skirts
Details
03-11-2010
4.00
Second fit of canopy
Details
03-10-2010
4.00
First fit of canopy
Details
03-09-2010
7.00
Starting on canopy frame
Details
03-08-2010
6.00
Complete flaperon controls
Details
03-07-2010
1.00
Second attempt to fit wings
Details
03-05-2010
4.00
Complete the wheel work
Details
03-05-2010
4.00
Brake tube work
Details
03-04-2010
6.00
Investigating the wing fit problem
Details
03-03-2010
0.50
The fuselage sees the light of day
Details
03-03-2010
1.00
Fitting the wheels
Details
03-03-2010
2.50
Disaster strikes!
Details
03-01-2010
8.50
Fitting the gear legs
Details
02-24-2010
5.00
Prepare the main wheels
Details
02-24-2010
4.00
Prep parts for securing undercarriage
Details
02-22-2010
6.00
Installing the magnetometer
Details
02-22-2010
2.00
Clecoing the turtle deck
Details
02-22-2010
1.00
Autopilot wires
Details
02-20-2010
2.00
Fit the flaperons to the wings
Details
02-19-2010
0.00
Flying...
Details
02-18-2010
6.00
Connect forward and aft stabilitor cables
Details
02-17-2010
3.00
Wiring the stabilitor
Details
02-17-2010
5.50
Finished tank, started stabilitor cables
Details
02-16-2010
3.50
Still tanking
Details
02-16-2010
5.00
More work on the fuel tank
Details
02-15-2010
3.00
Prime and fit autopilot brackets
Details
02-15-2010
6.00
More gooping
Details
02-12-2010
2.00
Prep autopilot brackets
Details
02-11-2010
3.00
Install rudder cables
Details
02-11-2010
2.00
Inspection!
Details
02-11-2010
3.00
Complete the flap handle mechanism
Details
02-10-2010
8.00
Further work on the fuel tank
Details
02-09-2010
6.50
Start tank assembly
Details
02-09-2010
1.00
Rivet nutplates to the Res Sender Plate
Details
02-05-2010
2.00
More painting of tank bits
Details
02-04-2010
7.50
Prep and prime fuel tank parts
Details
02-03-2010
7.50
Painting the inspection covers
Details
02-02-2010
8.50
Prep and paint all inspection covers
Details
01-28-2010
2.00
Start assembly of flap mechanism
Details
01-28-2010
3.00
Attaching Flaperon Pushrod Assembly
Details
01-21-2010
1.00
Prepare control assemblies
Details
01-21-2010
3.50
Attaching the Flaperon Mixer Bellcrank
Details
01-21-2010
2.00
Attaching the Flap Handle Pushrod Assembly
Details
01-20-2010
3.00
More wiring stuff
Details
01-19-2010
6.00
More wire tidying
Details
01-19-2010
2.00
Fit Stick Grips
Details
01-15-2010
7.00
More prep work on Flight Controls
Details
01-14-2010
4.00
Prep parts for flight controls
Details
01-12-2010
2.00
Wiring the control sticks
Details
01-12-2010
1.00
Wire tidying
Details
01-12-2010
5.00
P 31-06 Steps 2-4
Details
01-11-2010
3.00
Wiring the Auxiliary Services
Details
01-11-2010
2.00
Headset Jacks
Details
01-11-2010
2.00
Complete Fuselage Side Covers
Details
01-09-2010
3.00
Further work on Optional Harness
Details
01-08-2010
3.00
Wiring Tunnel and Optional Harnesses
Details
01-06-2010
2.00
CPU Cooling Fans
Details
01-06-2010
2.00
Assemble Spar Pins
Details
01-03-2010
3.00
Started on the wiring
Details
12-22-2009
1.00
Preparing the Wing Pins
Details
12-22-2009
1.00
Preparing the Terminal Blocks
Details
12-22-2009
1.00
Modify a Grommet
Details
12-22-2009
1.00
Installing the Wire Run Conduit
Details
12-22-2009
1.00
Installing an Adel Clamp above the Fuel Flow Unit
Details
12-22-2009
2.00
Fabricating a Wireway
Details
09-09-2009
0.50
Rivet Skin Stiffeners
Details
06-16-2009
2.00
Started inventory of Finish Kit
Details
03-02-2009
0.00
Ordered Finish Kit
Details
03-10-2008
0.00
The Finishing Sub-Kit
Details
SITE NAVIGATION
Contact Builder
RV-12 Home
Category
# Logs
# Hours
All
573
1849
00. Construction Log
1
01. Personal
1
02. G-BLWY
3
03. Research
1
04. Workshop
20
40
05. Tools
1
06. Empennage
99
226
07. Wings
74
221
08. Fuselage
116
333
09. Finishing Kit
101
362
10. Avionics
15
37
11. Firewall Fwd
35
142
12. Lighting Kit
8
39
12. Panel
8
39
13. Autopilot
5
9
14. Interior Trim
1
15. Spats
1
16. Painting
47
177
17. Production Accep
23
212
18. Operation
2
19. Maintenance
1
20. Trips
1
Miscellaneous
9
12