Powered By Kitlog Pro v2.0
Air Camper Construction Log
NX762R
Metal Fabrication
Work Logs Found:
76
Category Work Time:
176 Hours
Date
Hours
Work Log Summary
Details
05-01-2015
2.00
Brake Pedal Assembly
Details
04-27-2015
2.00
Brake Pedal Assembly
Details
04-22-2015
1.00
Brake Pedal Assembly
Details
04-21-2015
2.00
Brake Pedal Assembly
Details
12-20-2014
1.00
Forming Fuel Tank Components
Details
11-18-2014
0.50
Hydroforming Fuel Tank Components
Details
11-08-2014
3.00
Cutting Fuel Tank Components
Details
11-05-2014
0.50
Fuel Tank Drawings
Details
10-27-2014
1.00
Aileron Pulley Brackets
Details
10-12-2014
1.00
Fuel Tank Sketch
Details
10-11-2014
0.50
Jury Strut Attach fittings
Details
10-01-2014
2.50
Fuel Tank Straps
Details
09-23-2014
2.00
Elevator Cable Pulleys
Details
05-12-2014
1.50
Engine Mount Bushings
Details
05-09-2014
1.50
Diagonal Wing Braces
Details
05-08-2014
1.00
Diagonal Wing Braces
Details
05-07-2014
1.00
Diagonal Wing Braces
Details
08-24-2013
1.00
Lift Strut Attach Fittings
Details
08-13-2013
1.00
Polished Lower Lift Strut Fittings
Details
08-11-2013
2.00
Welded Lower Lift Strut Fittings
Details
08-11-2013
1.50
Forming Lift Strut Fittings
Details
07-19-2013
1.00
Motor Mount Fittings
Details
06-25-2013
1.00
Lift Strut Lugs
Details
06-24-2013
2.00
Lift Strut Lugs
Details
06-23-2013
2.00
Lift Srut Lugs
Details
06-22-2013
5.00
Lift Strut Lugs
Details
06-09-2013
1.00
Lift Strut Fittings
Details
06-08-2013
5.00
Lift Strut Fittings
Details
04-30-2013
1.00
Fuselage Fittings
Details
04-28-2013
2.00
Fuselage Fittings
Details
04-27-2013
2.50
Fuselage Fittings
Details
04-26-2013
2.00
Landing Gear Components
Details
04-12-2013
1.00
Brake Disc Spacer Fitting
Details
04-10-2013
2.50
Fabricating Metal Components
Details
04-10-2013
2.00
Brake Disc Spacers
Details
04-09-2013
1.50
Brake Disc Spacers
Details
04-07-2013
4.00
Fabricated Fuselage Fittings
Details
03-31-2013
3.00
Landing Gear/Lift Strut Attach Fittings
Details
03-29-2013
2.00
Landing Gear/Lift Strut Attach Fittings
Details
11-02-2012
1.00
Paint Metal Parts
Details
11-01-2012
6.00
Blasted and Primed Metal Parts
Details
10-29-2012
1.00
Rudder Pedals
Details
10-28-2012
2.50
Rudder Pedals
Details
10-28-2012
1.00
Painted Metal Parts
Details
10-24-2012
0.50
Landing Gear Strap template
Details
10-20-2012
3.50
Bead Blast and Primer Metal
Details
10-19-2012
2.00
Prepare Metal for Paint
Details
10-16-2012
1.00
Tail Wheel Bushing
Details
10-13-2012
2.00
Rudder Bar Support
Details
10-12-2012
2.00
Tubing Notching
Details
10-09-2012
2.00
Landing Gear Tubes
Details
09-29-2012
2.50
Tail Wheel Mount Fittings
Details
09-23-2012
3.00
Elevator Bellcrank
Details
09-23-2012
1.00
Adjustable so-and-so
Details
09-22-2012
2.00
Rudder Bar
Details
09-16-2012
2.00
Rudder Post
Details
09-12-2012
2.00
Elevator Bellcrank
Details
08-27-2012
2.00
Control System
Details
08-26-2012
3.50
Control System
Details
08-25-2012
3.00
Aileron Control Horn
Details
08-24-2012
3.00
Control System
Details
05-29-2012
2.00
Control System
Details
08-11-2011
2.00
Center Section / Cabane Fittings
Details
06-11-2011
10.00
Center Section / Cabane Fittings
Details
05-30-2011
7.00
Aileron Control Pulleys
Details
05-14-2011
10.00
Control Horns
Details
05-07-2011
5.00
Empennage Fittings
Details
04-02-2011
4.00
Control Horns
Details
01-13-2010
6.00
Drill and Polish Control Horns
Details
01-12-2010
1.50
Control Horn Shaping
Details
01-11-2010
2.00
Cut Control Horns
Details
01-08-2010
1.00
Control Horn Layout
Details
01-07-2010
2.00
Control Horn Templates
Details
09-06-2009
0.50
Fastener Prep
Details
08-23-2009
1.00
Metal Parts Delivered
Details
03-13-2009
4.00
Drawings
Details
SITE NAVIGATION
Contact Builder
NX762R Home
Category
# Logs
# Hours
All
661
1506
Cables and Control
13
23
Covering
64
122
Electric/Instruments
23
37
Empennage
7
48
Engine
61
198
Firewall Forward
13
19
Fuel System
16
20
Fuselage
58
153
Landing Gear
52
113
Metal Fabrication
76
176
Miscellaneous
40
94
Shop Prep
6
30
Tools
20
38
Wings
212
435
Copyright © 2001-2024 Matronics. All Rights Reserved.