Date
|
Hours
|
Work Log Summary
|
Details
|
07-21-2020
|
0.00
|
Aileron and elevator rigging.
|
Details
|
|
|
07-17-2020
|
0.00
|
Ailerons
|
Details
|
|
|
07-16-2020
|
0.00
|
Rough adjusted ailerons.
|
Details
|
|
|
07-02-2020
|
0.00
|
Installed jury struts
|
Details
|
|
|
07-01-2020
|
0.00
|
Checked jury struts, connected aileron cables.
|
Details
|
|
|
06-30-2020
|
0.00
|
Adjusted dihedral.
|
Details
|
|
|
06-29-2020
|
0.00
|
Swapped lift struts.
|
Details
|
|
|
06-25-2020
|
0.00
|
Set wing dihedral, removed windshield.
|
Details
|
|
|
06-24-2020
|
0.00
|
Wings on!
|
Details
|
|
|
06-23-2020
|
0.00
|
Fianl prep for wing installs.
|
Details
|
|
|
06-22-2020
|
0.00
|
Prep for wing install.
|
Details
|
|
|
06-20-2020
|
0.00
|
Installed airscoop.
|
Details
|
|
|
05-09-2018
|
0.00
|
Moved wings.
|
Details
|
|
|
04-29-2018
|
0.00
|
Second sprayed coat Poly-Tone, tops.
|
Details
|
|
|
04-28-2018
|
0.00
|
Second sprayed coat Poly-Tone, bottoms.
|
|
|
|
04-27-2018
|
0.00
|
Sanded bottoms.
|
Details
|
|
|
04-25-2018
|
0.00
|
Sanded tops.
|
Details
|
|
|
04-24-2018
|
0.00
|
First sprayed coat Poly-Tone, tops.
|
|
|
|
04-21-2018
|
0.00
|
First sprayed coat Poly-Tone, bottoms.
|
Details
|
|
|
04-17-2018
|
0.00
|
Melted drain holes, fixed bump.
|
Details
|
|
|
04-11-2018
|
0.00
|
Light test, inspection, started drain holes.
|
Details
|
|
|
04-07-2018
|
0.00
|
Third sprayed coat Poly-Spray, bottoms.
|
Details
|
|
|
04-06-2018
|
0.00
|
Third sprayed coat Poly-Spray, tops.
|
Details
|
|
|
04-04-2018
|
0.00
|
Second sprayed coat Poly-Spray, tops.
|
Details
|
|
|
04-03-2018
|
0.00
|
Repairs, ironing, full sanding, bottoms.
|
|
|
|
03-30-2018
|
0.00
|
Second sprayed coat Poly-Spray, bottoms.
|
Details
|
|
|
03-29-2018
|
0.00
|
First sprayed coat Poly-Spray, bottoms.
|
Details
|
|
|
03-28-2018
|
0.00
|
Worked wing tops.
|
Details
|
|
|
03-27-2018
|
0.00
|
First sprayed coat Poly-Spray, tops.
|
Details
|
|
|
03-26-2018
|
0.00
|
Third sprayed coat Poly-Brush, tops.
|
Details
|
|
|
03-25-2018
|
0.00
|
Third sprayed coat Poly-Brush, bottoms.
|
Details
|
|
|
03-24-2018
|
0.00
|
Second sprayed coat PolyBrush, bottoms.
|
Details
|
|
|
03-23-2018
|
0.00
|
Second sprayed coat Poly-Brush, tops.
|
Details
|
|
|
03-17-2018
|
0.00
|
First sprayed coat Poly-Brush, tops.
|
Details
|
|
|
03-16-2018
|
0.00
|
First sprayed coat Poly-Brush, bottoms.
|
Details
|
|
|
03-15-2018
|
0.00
|
50:50 Poly-Brush coat due to long storage.
|
Details
|
|
|
03-14-2018
|
0.00
|
Prep for wing coatings.
|
Details
|
|
|
03-12-2018
|
0.00
|
Replaced filters, modified stands, laid out wings.
|
|
|
|
03-10-2018
|
0.00
|
Cleaned out painting area.
|
|
|
|
03-06-2018
|
0.00
|
Worked towards paint booth.
|
Details
|
|
|
03-04-2018
|
0.00
|
Began cleaning out paint booth
|
Details
|
|
|
11-05-2016
|
0.00
|
Moved wings from T hangar to Milton's
|
|
|
|
12-28-2014
|
0.00
|
Finished wings to point of spray coats.
|
Details
|
|
|
12-12-2014
|
0.00
|
Continued covering the left wing.
|
Details
|
|
|
12-06-2014
|
0.00
|
Continued covering the left wing.
|
Details
|
|
|
12-01-2014
|
0.00
|
Continued covering the left wing.
|
Details
|
|
|
11-20-2014
|
0.00
|
Started gluing butt rib.
|
|
|
|
11-19-2014
|
0.00
|
Inspected left wing, installed envelope.
|
Details
|
|
|
06-26-2014
|
0.00
|
Fabricated backing ring, dry fit Grimes assembly.
|
|
|
|
06-25-2014
|
0.00
|
Installed braces left wing.
|
|
|
|
06-19-2014
|
0.00
|
Finished patching, installed tinnermans, trial fit
|
|
|
|
06-12-2014
|
0.00
|
Bolted braces and started fabric patching.
|
|
|
|
06-03-2014
|
0.00
|
Fabricated braces.
|
Details
|
|
|
05-29-2014
|
0.00
|
Dealing with butt rib bowing.
|
Details
|
|
|
05-03-2014
|
0.00
|
Ironed wing.
|
Details
|
|
|
04-30-2014
|
0.00
|
Right wing ready for ironing and spraying.
|
|
|
|
04-24-2014
|
0.00
|
Taped top of right wing.
|
Details
|
|
|
04-19-2014
|
0.00
|
Riveted top side right wing.
|
Details
|
|
|
04-18-2014
|
0.00
|
Applied bottom span-wise tapes.
|
Details
|
|
|
04-16-2014
|
0.00
|
Installed chord-wise tapes.
|
|
|
|
04-15-2014
|
0.00
|
Set rivets, prepped for finishing tapes.
|
|
|
|
04-14-2014
|
0.00
|
Reinforcing tapes and rivets, right bottom.
|
|
|
|
04-12-2014
|
0.00
|
Worked on right wing.
|
Details
|
|
|
04-11-2014
|
0.00
|
Continued prepping left wing.
|
Details
|
|
|
04-10-2014
|
0.00
|
Continued work on left wing.
|
Details
|
|
|
04-08-2014
|
0.00
|
First coat Poly-Brush right wing top.
|
Details
|
|
|
04-05-2014
|
0.00
|
Worked on right wing with Jeanne.
|
Details
|
|
|
04-02-2014
|
0.00
|
250 degree iron right wing.
|
Details
|
|
|
03-30-2014
|
0.00
|
Glued right wing fabric.
|
Details
|
|
|
03-29-2014
|
0.00
|
Readied right wing for cover.
|
Details
|
|
|
03-28-2014
|
0.00
|
More tasks on left wing, swapped.
|
Details
|
|
|
03-27-2014
|
0.00
|
Continued work on left wing.
|
Details
|
|
|
03-25-2014
|
0.00
|
Built new Pitot tube.
|
Details
|
|
|
03-21-2014
|
0.00
|
Research at home, pitot/static.
|
Details
|
|
|
03-20-2014
|
0.00
|
Continued left wing prep.
|
Details
|
|
|
03-19-2014
|
0.00
|
Catch-up entry.
|
Details
|
|
|
01-24-2014
|
0.00
|
Primed wings.
|
Details
|
|
|
01-18-2014
|
0.00
|
Week's summary.
|
Details
|
|
|
01-10-2014
|
0.00
|
Completed leading edge install.
|
Details
|
|
|
01-09-2014
|
0.00
|
Began riveting leading edge.
|
Details
|
|
|
01-08-2014
|
0.00
|
Clecoed on leading edge.
|
Details
|
|
|
01-06-2014
|
0.00
|
Continued on right wing.
|
Details
|
|
|
01-04-2014
|
0.00
|
Continued work on leading edge.
|
Details
|
|
|
12-31-2013
|
0.00
|
Continued work on right wing.
|
Details
|
|
|
12-27-2013
|
0.00
|
Transferred fuel to right tank. Left tested good.
|
|
|
|
12-23-2013
|
0.00
|
Worked on right wing.
|
Details
|
|
|
12-21-2013
|
0.00
|
Installed new leading edge, right wing.
|
Details
|
|
|
12-13-2013
|
0.00
|
Worked on right wing.
|
Details
|
|
|
12-05-2013
|
0.00
|
Completed removal of left wing leading edge.
|
Details
|
|
|
12-01-2013
|
0.00
|
Competed repairs to wing structure.
|
Details
|
|
|
11-29-2013
|
0.00
|
Built new leading edges.
|
Details
|
|
|
11-02-2013
|
0.00
|
Leading edge experiments
|
Details
|
|
|
05-17-2013
|
0.00
|
PolyFiber shipment arrived.
|
|
|
|
04-27-2013
|
2.00
|
Stripped leading edge, set some rivets.
|
Details
|
|
|
03-07-2013
|
4.00
|
More structure repairs, top of left wing.
|
Details
|
|
|
03-03-2013
|
4.00
|
Worked on left wing repairs and cleaning.
|
Details
|
|
|
03-02-2013
|
3.50
|
Began left wing structure repairs.
|
Details
|
|
|
02-09-2013
|
7.00
|
Stripped left wing.
|
Details
|
|
|
02-03-2013
|
4.00
|
Worked on wings.
|
Details
|
|
|
01-27-2013
|
6.00
|
Fabric Class Day 2
|
|
|
|
01-26-2013
|
8.00
|
SportAir Fabric Class at OSH Day 1
|
|
|
|
01-14-2013
|
6.00
|
Stripped aluminum from right wing.
|
Details
|
|
|
01-01-2013
|
1.00
|
Removed one wing skin.
|
Details
|
|
|
06-25-2012
|
5.00
|
Worked on skin, got #4 cylinder piston out.
|
Details
|
|
|
02-25-2012
|
2.00
|
Worked on corrosion on right wing.
|
Details
|
|