KitLog pro

Powered By Kitlog Pro v2.0

Conrads X-10 Build Log
Work Logs Found: 20
Category Work Time: 83 Hours
 Date
Hours
Work Log Summary

Details

 08-03-2008
2.00
Completed Steps 1 to 6 Section 10-2
Details
     

 08-02-2008
6.00
Horizontal Elevator Section 9-1 to 9-21
Details
       

 08-01-2008
4.00
HE Section 9-17, Step 5 to 10, I cut out PVC foam
Details
       

 07-30-2008
4.00
HE Section 9-17, Completed steps 1 to 4. Created
Details
     

 07-29-2008
4.00
HE Section 9-16, bending all four end tabs on E-91
Details

 07-27-2008
2.00
six clamping blocks
Details
     

 07-26-2008
3.00
Section HE 9-15, Steps 8 and 9. Trimmed the lead
Details
       

 07-25-2008
4.00
HE Section 9-15 riveted the sheer clip E-1022 to
Details
     

 07-24-2008
4.00
Completed step 11 by using the hex de-burred
Details

 07-18-2008
4.00
Horizontal Elevator Section 9-12
Details
     

 07-17-2008
3.00
Horizontal Elevator Section 9-12
Details
     

 07-16-2008
2.00
Horizontal Elevator Section 9-11
Details
     

 07-15-2008
2.00
Horizontal Elevator Section 9-11
Details
       

 07-13-2008
6.00
Horizontal Elevator Section 9-11
Details
     

 07-12-2008
3.00
Horizontal Elevator Section 9-10
Details
       

 07-11-2008
5.00
Horizontal Elevator Section 9-9
Details
     

 07-10-2008
6.00
Horizontal Elevator Section 9-7
Details
       

 07-08-2008
6.00
Section 9 Horizontal Elevator Sections 9-7
Details
       

 07-06-2008
6.00
Horizontal Elevator Sections 9 Pages 9-5 to 9-6
Details

 07-05-2008
7.00
Section 9 Horizontal Elevator 9-1 to 9-4
Details
       










Copyright © 2001-2024 Matronics. All Rights Reserved.