KitLog pro

Powered By Kitlog Pro v2.0

Conrads X-10 Build Log
Work Logs Found: 12
Category Work Time: 58 Hours
 Date
Hours
Work Log Summary

Details

 03-14-2009
3.00
Attached the Leading Edge and Fuel Tank to the Lef
Details
       

 02-22-2009
4.00
Section 18-8 Fuel Tank Leak Testing
Details
       

 02-15-2009
4.00
Tank Fuel Skin
Details
       

 02-12-2009
3.00
Section Fuel Tank 18-8
Details
       

 02-01-2009
1.00
Section 18 Page 18-7 Steps 1 to 3.
Details
       

 01-31-2009
2.50
Section 18 Fuel Tank, Page 18-6 Steps 1 to 6
Details

 01-28-2009
12.00
Section 18 Fuel Tank, Page 18-5 Steps 5 to 9
Details

 01-26-2009
3.00
Section Fuel Tank, Page 18-5 Step 4
Details

 01-25-2009
2.00
Section 18 Fuel Tank, Page 18-5 steps 1 to 8
Details

 01-24-2009
8.00
Section 18 Fuel Tank, Page 18-4
Details

 01-17-2009
12.00
Section 18, Page 18-2, Steps 5 to 6
Details

 01-16-2009
4.00
Section 18 Fuel Tank, Page 18-2 , Steps 1 to 4
Details










Copyright © 2001-2024 Matronics. All Rights Reserved.