05-19-2012
3.00
Radio and electrical checkout
Details
10-29-2011
3.00
Wired compass and cabin lights
Details
10-02-2011
2.00
Completed ignition system wiring
Details
09-25-2011
6.00
Wired up control sticks
Details
09-11-2011
4.00
Wired ignition modules
Details
09-05-2011
4.00
Mounted antenna diplexer
Details
09-04-2011
8.00
Rewired stick controls
Details
09-03-2011
6.00
Ran antennal wires
Details
09-02-2011
3.00
Plumbed manifold pressure lines
Details
08-28-2011
5.00
Mounted ELT antenna bracket
Details
08-27-2011
5.00
Finsh mounted GPS antenna shelf
Details
08-26-2011
4.00
Mounted avionics fan
Details
08-22-2011
4.00
Wired rudder strobe
Details
08-21-2011
6.00
Painted parts
Details
08-19-2011
6.00
Fabricated mounting for avionics fan
Details
08-18-2011
7.00
Fabricated backing plates for shelf
Details
08-17-2011
4.00
Fabricated ELT antenna mount
Details
08-13-2011
8.00
Added GPS Antenna shelf on the firewall
Details
08-07-2011
4.00
Powered up lights and Skyview system
Details
08-06-2011
6.00
Wired headsets
Details
08-03-2011
5.00
Mounted COM antennas
Details
08-02-2011
3.00
Mounted GNS 430 GPS antenna
Details
07-02-2011
4.00
Complete fuse block wiring
Details
05-31-2011
6.00
Finish wirng fuse blocks
Details
05-29-2011
0.50
My favorite birds visit me
Details
05-28-2011
6.00
Laced front panel wiring
Details
05-21-2011
6.00
Initial finish wiring fuse blocks
Details
05-14-2011
6.00
Finish wired heat sinks
Details
05-07-2011
8.00
Finish wired dimmer modules
Details
04-23-2011
7.00
Finish wired EMS module
Details
04-16-2011
8.00
Prepare for finish wiring
Details
04-10-2011
6.00
Assembled Fuseholder shelf
Details
04-09-2011
6.00
Routing wires and lacing
Details
04-05-2011
4.00
Laced wiring
Details
04-04-2011
4.00
Mounted heat sinks and lighting controllers
Details
04-03-2011
6.00
Completed Secondary Regulator wiring
Details
04-02-2011
8.00
Completed Ignition Wiring
Details
03-29-2011
5.00
Completed firewall wiring
Details
03-28-2011
6.00
Mounted Skyview Modules and Ignition
Details
03-27-2011
6.00
Final assembly firewall penetrations
Details
03-26-2011
7.00
Final assembly for mountings
Details
03-25-2011
5.00
Parts final assembly
Details
03-22-2011
4.00
Painted parts
Details
03-06-2011
8.00
Fabricated ignition battery box
Details
03-05-2011
8.00
Mounted Fuel Flow Sensor
Details
02-26-2011
6.00
Finished firewall wiring
Details
02-12-2011
3.00
Finished up power cable runs
Details
02-06-2011
6.00
Power Cable runs
Details
02-05-2011
8.00
Terminated Power Cables
Details
01-15-2011
8.00
Mounting Firewall Components
Details
06-14-2010
3.00
Installed right EFIS backup battery
Details
06-13-2010
7.00
Attached ignition system rails
Details
06-12-2010
3.00
Mounted ignition systems to rails
Details
06-05-2010
5.00
Finished ignition system install and test
Details
06-04-2010
1.00
Received Dynon gear
Details
03-07-2009
3.00
Fabricated ELT antenna backing plate
Details
03-05-2009
2.00
Mounted wing root connectors
Details
03-01-2009
2.00
Finished wiring barriers
Details
02-28-2009
5.00
Canted grips 15 degrees
Details
02-14-2009
3.00
Finished wiring grips into barrier strip
Details
02-13-2009
3.00
Ran grip wires to barrier strips
Details
02-12-2009
3.00
Wired pilot grip
Details
02-11-2009
1.00
Routed copilot grip wires to barrier strip
Details
02-10-2009
3.00
Mounted base assembly
Details
02-08-2009
4.00
Prepare base wiring
Details
02-07-2009
3.00
Assembled base connector
Details
02-06-2009
3.00
Prepared copilot stick base
Details
02-05-2009
3.00
Brazed pins into copilot stick
Details
02-04-2009
2.00
Prepared copilot stick mounting
Details
01-31-2009
4.00
Wired and mounted copilot grip
Details
01-30-2009
3.00
Laced wires for copilot grip connector
Details
01-29-2009
3.00
Continued connector assembly
Details
01-28-2009
2.00
Started copilot grip connector wiring
Details
01-27-2009
1.00
Prepared joystick grips
Details
01-26-2009
3.00
Added braces to ELT panel, ran wires
Details
01-25-2009
7.00
Ran wires, mounted barrier strip panel
Details
01-24-2009
5.00
Mounted ELT in fuselage
Details
01-23-2009
3.00
Mounted and wired ELT.
Details
01-19-2009
3.00
Laced wires running to fuselage tail
Details
01-18-2009
5.00
Finished elevator autopilot servo install
Details
01-17-2009
7.00
Final assembly of flap position sensor
Details
01-12-2009
5.00
Primed aluminum parts
Details
01-11-2009
3.00
Assembled barrier strip panel
Details
01-10-2009
9.00
Wired flap controls and relays
Details
01-09-2009
3.00
Wired elevator autopilot servo
Details
01-08-2009
3.00
Mounted trim lockout relays
Details
01-06-2009
4.00
Wired trim lockout relays
Details
01-05-2009
2.00
Spliced cable to elevator trim servo
Details
01-04-2009
2.00
Routed static pressure line
Details
01-03-2009
3.00
Mounted barrier strip for flap control
Details
12-31-2008
4.00
Installed trim servo relay decks
Details
12-30-2008
3.00
Started servo relay deck wiring
Details
12-27-2008
3.00
Finished installing flap position transducer
Details
12-21-2008
4.00
Mounted Flap Position Transducer
Details
12-20-2008
8.00
Build magnetometer mount
Details
12-19-2008
2.00
Mounted Elevator Servo
Details
12-18-2008
1.00
Mounted Strobe Power Supply
Details
SITE NAVIGATION
Contact Builder
RV-7A Home
Category
# Logs
# Hours
All
728
2689
Canopy
26
127
Electrical
97
436
Empennage
30
110
Firewall forward
103
332
Fuselage
161
696
Gear fairings
5
17
Instrument Panel
78
419
Shop Setup
15
Wings
213
552