Powered By Kitlog Pro v2.0
Jeff Mitchell's RV8 project
RV-8
Fuselage
Work Logs Found:
457
Category Work Time:
1889 Hours
Date
Hours
Work Log Summary
Details
08-20-2014
3.50
Still more work on the Empenage fairing.
Details
08-19-2014
5.50
Fire Extinguisher Installation.
Details
08-18-2014
4.90
Even more work on the empennage fairing.
Details
08-17-2014
5.00
More work on empennage fairing.
Details
08-16-2014
6.00
Empenage Fairing.
Details
08-15-2014
4.50
Yet even more various small tasks.
Details
08-14-2014
6.00
More Various Taks.
Details
08-13-2014
5.00
Various Tasks.
Details
08-09-2014
6.00
Various bits.
Details
08-05-2014
9.00
Cowl insulation.
Details
07-31-2014
12.90
Engine Cowl Paint Preparation.
Details
07-29-2014
7.90
Empenage fairing and cowl pinholes.
Details
07-27-2014
5.00
Cowl Bump Out.
Details
07-25-2014
8.10
Various.
Details
07-24-2014
6.50
Cowl pin retainer clips.
Details
07-21-2014
7.90
Various.
Details
05-25-2014
5.50
Riveted floor in place.
Details
05-25-2014
1.00
Front seat belt installation.
Details
05-24-2014
5.50
Heat seat wiring and floor install preparation.
Details
05-23-2014
5.00
ADSB Antenna Cables.
Details
05-12-2014
3.50
Finished ELT Antenna installation.
Details
05-11-2014
6.50
Rear seat air vent, cockpit armrests.
Details
05-10-2014
6.00
Aileron pushrod boots and various.
Details
05-09-2014
7.50
Wire bundle secured below pushrods.
Details
05-07-2014
4.20
Power to iPad and battery tray bracket.
Details
05-06-2014
6.10
Fuel system check and iPad mount.
Details
05-02-2014
7.10
Final wing installation.
Details
04-29-2014
10.50
Sanded and primed front windshileld fairing.
Details
02-28-2014
3.50
Rudder and tailwheel steering link.
Details
02-25-2014
9.00
SB 14-01-31 Horizontal Stabilizer cracks - Part 3.
Details
02-23-2014
7.00
SB 14-01-31 Horizontal Stabilizer cracks - Part 2.
Details
02-22-2014
8.30
SB 14-01-31 Horizontal Stabilizer cracks - Part 1.
Details
02-19-2014
5.00
Tailwheel lock mod and bled brakes.
Details
02-18-2014
6.40
Fuselage to wing Pitot / AofA connections.
02-17-2014
6.10
Fuselage to wing connections.
Details
02-11-2014
5.00
Controls installed for good.
02-10-2014
3.00
Aileron trim and map lights.
Details
02-09-2014
4.00
Pitch Servo Bellcrank.
Details
02-01-2014
31.00
Various entries.
Details
12-04-2013
2.00
Windscreen fairing - Part 9.
Details
12-03-2013
1.50
Windscreen fairing - Part 8.
Details
12-02-2013
1.00
Windscreen support brackets riveted.
Details
11-30-2013
9.00
Windscreen fairing - Part 7.
Details
11-29-2013
9.00
Windscreen fairing - Part 6.
Details
11-27-2013
5.50
Windscreen fairing - Part 5.
Details
11-22-2013
8.20
Windscreen fairing - Part 4.
Details
11-18-2013
6.00
Windscreen fairing - Part 3.
Details
11-14-2013
7.50
Windscreen fairing - Part 2.
Details
11-09-2013
6.50
Windscreen fairing - Part 1.
Details
08-29-2013
7.00
ADS-B Antennas installed.
Details
06-10-2013
5.50
ELT Installation - Part 4.
Details
05-25-2013
4.00
ELT Installation - Part 3.
05-21-2013
5.50
ELT Installation - Part 2.
Details
05-20-2013
4.00
ELT Installation - Part 1.
Details
03-30-2013
5.40
Windshield Installation - Part 2.
Details
03-28-2013
5.20
Windshield Installation - Part 1.
Details
03-17-2013
3.90
Cowl Installation continued - Part 8.
Details
03-16-2013
3.20
Front Windscreen Install - Part 1.
Details
03-15-2013
7.00
Pro Sealed Cowl Hinges.
Details
03-13-2013
5.50
Roll Bar Grab Handles.
Details
03-12-2013
5.20
Cowl Installation continued - Part 7.
Details
03-10-2013
7.90
Cowl Installation continued - Part 6.
Details
03-08-2013
3.00
Cowl Installation continued - Part 5.
Details
03-08-2013
3.10
Cowl Installation continued - Part 4.
Details
03-06-2013
4.50
Cowl Installation continued - Part 3.
Details
03-05-2013
3.10
Fwd Baggage Door - Part 3.
Details
03-05-2013
3.00
Cowl Installation continued - Part 2.
Details
03-01-2013
8.00
Fwd Baggage Door - Part 2.
Details
02-28-2013
3.40
Fwd Baggage Door - Part 1.
Details
01-20-2013
4.50
Re-Installed instrument Panel.
Details
01-20-2013
9.00
Forward Top Skin riveted on - Part 1.
Details
01-17-2012
4.50
Throttle / Mixture / Prop Cables.
Details
01-15-2012
3.00
Installed WD-814 Roll Bar.
Details
01-14-2012
7.00
Landing gear and wheels installation - Part 2.
Details
01-06-2012
5.70
Wheel brakes - Part 2.
Details
12-26-2011
2.50
Wheel brakes - Part 1.
Details
12-24-2011
9.30
Landing gear and wheels installation - Part 1.
Details
11-30-2011
3.50
Canopy skirt - Part 27.
Details
11-29-2011
3.00
Canopy skirt - Part 26.
Details
11-28-2011
3.50
Canopy skirt - Part 25.
Details
11-27-2011
1.50
Canopy skirt - Part 24.
Details
11-26-2011
3.50
Flap fairing improvement - Part 3.
Details
11-24-2011
1.30
Flap fairing improvement - Part 2.
Details
11-24-2011
3.70
Canopy skirt - Part 23.
Details
11-23-2011
5.00
Canopy skirt - Part 22.
Details
11-22-2011
3.00
Canopy skirt - Part 21.
Details
10-21-2011
3.00
Canopy skirt - Part 20.
Details
10-20-2011
3.50
Canopy skirt - Part 19.
Details
10-19-2011
3.50
Canopy skirt - Part 18.
Details
10-18-2011
2.50
Canopy skirt - Part 17.
Details
10-04-2011
2.00
Flap fairing improvement - Part 1.
Details
10-04-2011
4.00
Canopy skirt - Part 16.
Details
10-03-2011
2.30
Canopy skirt - Part 15.
Details
10-02-2011
5.00
Canopy skirt - Part 14.
Details
09-30-2011
5.00
Canopy skirt - Part 13.
Details
09-29-2011
7.00
Canopy skirt - Part 12.
Details
09-28-2011
3.50
Canopy skirt - Part 11.
Details
09-27-2011
2.00
Canopy skirt - Part 9.
Details
09-27-2011
2.00
Canopy skirt - Part 10.
Details
09-26-2011
5.00
Canopy skirt - Part 8.
Details
09-25-2011
4.00
Canopy skirt - Part 7.
Details
09-25-2011
1.00
Canopy skirt - Part 6.
Details
09-24-2011
5.00
Canopy skirt - Part 5.
Details
09-23-2011
5.00
Canopy skirt - Part 4.
Details
09-18-2011
2.00
Canopy skirt - Part 3.
Details
09-17-2011
4.00
Canopy skirt - Part 2.
Details
09-16-2011
2.00
Canopy to frame bonding - Part 6.
Details
09-15-2011
3.00
Canopy to frame bonding - Part 5.
Details
09-14-2011
2.00
Canopy to frame bonding - Part 4.
Details
09-14-2011
2.00
Canopy skirt - Part 1.
Details
09-13-2011
4.70
Canopy to frame bonding - Part 3.
Details
09-11-2011
3.00
Canopy trimming - Part 12.
Details
09-10-2011
5.00
Canopy trimming - Part 11.
Details
09-09-2011
4.50
Canopy to frame bonding - Part 2.
Details
09-08-2011
4.70
Canopy to frame bonding - Part 1.
Details
09-07-2011
4.50
Canopy trimming - Part 10.
Details
08-28-2011
3.00
Mike Zellers canopy latch.
Details
08-27-2011
2.50
Misc Canopy work - Part 1.
Details
08-23-2011
3.00
Canopy trimming - Part 9.
Details
08-22-2011
2.50
Canopy trimming - Part 8.
Details
08-20-2011
2.00
Canopy trimming - Part 7.
Details
08-19-2011
3.80
Canopy trimming - Part 6.
Details
08-18-2011
2.50
Canopy trimming - Part 5.
Details
08-17-2011
4.50
Canopy trimming - Part 4.
Details
08-15-2011
2.50
Canopy trimming - Part 3.
Details
08-12-2011
2.00
Firewall battery tray installation - Part 6.
Details
07-20-2011
7.00
Canopy trimming - Part 2.
Details
07-17-2011
8.50
Canopy trimming - Part 1.
Details
07-16-2011
5.00
Canopy frame spacers.
Details
07-15-2011
4.00
Canopy trim preparations.
Details
06-28-2011
7.00
Moved airplane parts around.
Details
06-22-2011
2.00
Prepared fuselage for moving into garage.
Details
06-21-2011
0.10
Grove gear polished!
Details
06-10-2011
1.00
Remade C-661 Canopy slide block.
Details
06-05-2011
7.80
Seat heater wiring - Part 4.
Details
06-04-2011
1.00
Manual elevator trim cable installation.
Details
04-24-2011
5.00
R/H switch console antirotation plate take two.
Details
03-31-2011
0.50
Fuselage rotating stand counter weights.
Details
03-30-2011
5.00
Map light wiring.
Details
03-26-2011
5.00
Instrument panel cutouts - Part 2.
Details
03-24-2011
3.30
Temporary battery tray relocation.
Details
03-22-2011
5.30
Instrument panel cutouts - Part 1.
Details
03-20-2011
6.00
Fuel boost pump back up circuit.
Details
03-19-2011
7.20
Flap extension protection.
Details
03-17-2011
6.50
Wired flap relay board - Part 3.
Details
03-16-2011
4.50
Wired flap relay board - Part 2.
Details
03-15-2011
6.00
Stick grip wiring - Part 2.
Details
03-13-2011
3.10
Stick grip wiring - Part 1.
Details
03-04-2011
7.00
Large gauge wires - Part 2.
Details
03-02-2011
4.50
Large gauge wires - Part 1.
Details
03-01-2011
6.30
Firewall battery tray installation - Part 5.
Details
02-28-2011
4.00
Firewall battery tray installation - Part 4.
Details
02-27-2011
3.00
Grounding options.
Details
02-26-2011
5.00
Firewall battery tray installation - Part 3.
Details
02-24-2011
2.70
Firewall battery tray installation - Part 2.
Details
02-23-2011
2.50
Firewall battery tray installation - Part 1.
Details
02-19-2011
4.00
Installed fuel boost pump and filter.
Details
02-17-2011
7.30
Intercom System - Part 4.
Details
02-16-2011
5.00
Intercom System - Part 3.
Details
02-12-2011
6.00
Interior final painting - Part 3.
Details
01-30-2011
6.30
Interior final painting - Part 2.
Details
01-29-2011
3.50
Interior final painting - Part 1.
Details
01-15-2011
5.00
Seat heater wiring - Part 3.
Details
01-13-2011
1.00
Installed 14 Volt power outlets.
Details
01-09-2011
4.00
General wiring planning.
Details
01-08-2011
2.00
Seat heater wiring - Part 2.
Details
01-07-2011
2.00
Seat heater wiring - Part 1.
Details
01-06-2011
3.00
Cockpit side panels - Part 4.
Details
01-04-2011
3.50
R/H switch console antirotation plate.
Details
01-03-2011
6.00
Aux bus panel - completed.
Details
01-02-2011
4.30
Cockpit side panels - Part 3.
Details
01-01-2011
4.70
Cockpit side panels - Part 2.
Details
12-27-2010
4.50
Cockpit side panels - Part 1.
Details
12-23-2010
3.50
Wired flap relay board - Part 1.
Details
12-18-2010
1.00
VP-50 tray completed.
Details
12-16-2010
5.00
Aux bus panel - second attempt.
Details
12-15-2010
4.80
Infinity grip on new bent stick - Part 2.
Details
12-14-2010
2.30
Infinity grip on new bent stick - Part 1.
Details
12-13-2010
2.80
Right hand console switches.
Details
12-01-2010
3.70
Aileron pushrod boots - Part 2.
Details
11-22-2010
0.50
Rudder pedals.
Details
11-09-2010
6.00
Aileron pushrod boots - Part 1.
Details
11-01-2010
3.50
Primed misc. parts.
Details
10-18-2010
2.00
Wheels and brakes - Part 2.
Details
10-17-2010
2.70
Wheels and brakes - Part 1.
Details
10-14-2010
1.50
Grove gear priming.
Details
10-13-2010
4.50
Gear alignment and leg fairings.
Details
10-10-2010
4.80
Wheel assembly.
Details
10-08-2010
3.00
Improving fuselage rotisserie - Part 4.
Details
10-07-2010
1.00
Fabricated rudder pedal heel plates.
Details
10-02-2010
3.00
Preparation for fuselage interior painting.
Details
09-29-2010
6.00
Improving fuselage rotisserie - Part 3.
Details
09-28-2010
4.00
Improving fuselage rotisserie - Part 2.
Details
09-27-2010
2.50
Improving fuselage rotisserie - Part 1.
Details
09-26-2010
4.00
Modified rotating fuselage stand front frame.
Details
09-25-2010
3.50
Engine mount - Part 3.
Details
09-24-2010
2.00
Engine mount - Part 2.
Details
09-23-2010
1.80
Sorted finish kit hardware.
Details
09-23-2010
2.70
Fitting canopy frame - Part 4.
Details
09-21-2010
3.70
Fitting canopy frame - Part 3.
Details
09-19-2010
3.90
Fitting canopy frame - Part 2.
Details
09-18-2010
4.20
Fitting canopy frame - Part 1.
Details
09-17-2010
2.50
Canopy rails.
Details
09-15-2010
6.80
Canopy center slide rail - Part 5.
Details
09-14-2010
4.50
Canopy center slide rail - Part 4.
Details
09-13-2010
2.00
Canopy center slide rail - Part 3.
Details
09-11-2010
4.00
Canopy center slide rail - Part 2.
Details
09-09-2010
4.00
Canopy center slide rail - Part 1.
Details
09-08-2010
2.10
Inventoried finishing kit.
Details
09-07-2010
5.00
Riveted flap fairings to fuselage.
Details
09-05-2010
5.20
Finished installing nutplates on wing inboard skin
Details
09-04-2010
1.50
Riveted nutplates to left inboard wing.
Details
09-03-2010
5.50
Primed wing to fuselage fairings.
Details
09-02-2010
3.00
Riveted nutplates to right inboard wing.
Details
09-01-2010
6.30
Drilled nutplate attach holes in right wing root.
Details
08-30-2010
4.00
Removed the wings.
Details
08-29-2010
4.50
Wing to fuselage fairings and interface - Part 5.
Details
08-27-2010
3.70
Wing to fuselage fairings and interface - Part 4.
Details
08-23-2010
5.00
Wing to fuselage fairings and interface - Part 3.
Details
08-21-2010
4.00
Wing to fuselage fairings - Part 2.
Details
08-20-2010
3.50
Wing to fuselage fairings - Part 1.
Details
08-19-2010
2.50
Bent last of the fuel lines.
Details
08-17-2010
2.50
Drilled F-863 to T-405 brackets.
Details
08-16-2010
4.00
F-863 left tank attach bracket v2.0.
Details
08-14-2010
5.00
Installed tank support brackets.
Details
08-13-2010
7.00
Aft wing spar bolt holes drilled.
Details
08-12-2010
3.50
Even more preparation for wing aft spar drilling.
Details
08-11-2010
6.60
More preparation for wing aft spar drilling.
Details
08-10-2010
5.80
Flap installation and rigging - Part 4.
Details
08-09-2010
5.00
Flap installation and rigging - Part 3.
Details
08-06-2010
3.80
Flap installation and rigging - Part 2.
Details
08-05-2010
5.00
Flap installation and rigging - Part 1.
Details
08-01-2010
5.00
Wing alignment and incidence setting.
Details
07-31-2010
1.30
Miscellaneous preparation for wing alignment.
Details
07-30-2010
3.00
Joined wings to fuselage.
Details
06-13-2010
2.50
Primed forward top skin.
Details
05-28-2010
1.20
Installed magneto and starter switches.
Details
05-01-2010
1.00
Installed (temporarily) cockpit interior.
Details
04-28-2010
3.00
Aft Upper Skin and fwd baggage bulkheads done.
Details
04-26-2010
6.00
Infinity control stick grip installation.
Details
04-24-2010
4.00
Baggage access door - Part 4.
Details
04-23-2010
3.00
Top forward skin - Part 3.
Details
04-22-2010
2.00
Top forward skin - Part 2.
Details
04-20-2010
4.50
Instrument sub panels and top fwd skin - Part 1.
Details
04-19-2010
5.80
Manual trim and air vent holes drilled.
Details
04-18-2010
3.30
Tail wheel installation.
Details
04-17-2010
1.50
Baggage access door - Part 3.
Details
04-15-2010
3.00
Baggage access door - Part 2.
Details
04-14-2010
6.00
Baggage access door - Part 1.
Details
04-13-2010
2.50
Battery access door - Part 5.
Details
04-12-2010
5.70
Battery access door - Part 4.
Details
04-11-2010
6.00
Battery access door - Part 3.
Details
04-10-2010
3.50
Battery access door - Part 2.
Details
04-08-2010
4.00
Battery access door - Part 1.
Details
03-29-2010
1.50
Front Upper Skins - Part 4.
Details
03-28-2010
4.30
Front Upper Skins - Part 3.
Details
03-27-2010
4.50
Front Upper Skins - Part 2.
Details
03-20-2010
1.00
Front Upper Skins - Part 1.
Details
03-19-2010
2.50
Classic Aero Designs Interior arrives.
Details
03-18-2010
4.50
Aft Upper Skins and Bulkheads - Part 8.
Details
03-17-2010
4.50
Static system - Part 3 and ADAHRS shelf.
Details
03-16-2010
4.00
Static system - Part 2.
Details
03-15-2010
1.20
Static system - Part 1.
Details
03-14-2010
3.00
Aft Upper Skins and Bulkheads - Part 7.
Details
03-13-2010
1.50
Aft Upper Skins and Bulkheads - Part 6.
Details
03-12-2010
4.00
Aft Upper Skins and Bulkheads - Part 5.
Details
03-10-2010
4.30
Aft Upper Skins and Bulkheads - Part 4.
Details
03-01-2010
2.00
Aft Upper Skins and Bulkheads - Part 3.
Details
02-28-2010
5.50
Aft Upper Skins and Bulkheads - Part 2.
Details
02-27-2010
7.00
Aft Upper Skins and Bulkheads - Part 1.
Details
02-24-2010
4.00
Rudder cables and pedals.
Details
02-23-2010
4.10
Rudder Stops and Flap Motor.
Details
02-22-2010
1.50
Rudder Stops - Part 1.
Details
02-21-2010
7.00
Elevator Control System - Part 4.
Details
02-20-2010
5.00
Elevator Control System - Part 3.
Details
02-19-2010
4.10
Elevator Control System - Part 2.
Details
02-15-2010
7.80
Elevator Control System - Part 1.
Details
02-12-2010
1.00
Empennage attach - Part 5.
Details
02-11-2010
4.00
Empennage attach - Part 4.
Details
02-10-2010
5.00
Empennage attach - Part 3.
Details
02-09-2010
4.50
Empennage attach - Part 2.
Details
02-08-2010
5.00
Manual Aileron Trim & Empennage attach - Part 1.
Details
02-07-2010
6.30
Flap blocks - take two.
Details
02-06-2010
3.00
Consoles and Seat Ramps - Part 2.
Details
02-05-2010
6.50
Consoles and Seat Ramps - Part 1.
Details
02-04-2010
3.00
Seat floors - Part 8.
Details
02-03-2010
3.50
Seat floors - Part 7.
Details
02-02-2010
3.00
Seat floors - Part 6.
Details
02-01-2010
3.30
Seat floors - Part 5.
Details
01-29-2010
4.50
Seat floors - Part 4.
Details
01-24-2010
2.80
Seat floors - Part 3.
Details
01-22-2010
3.00
Seat floors - Part 2.
Details
01-21-2010
1.00
Seat floors - Part 1.
Details
01-21-2010
1.70
Applied PRC to the cooling ramp.
Details
01-20-2010
4.30
Odds and ends, lower bottom skins.
Details
01-19-2010
0.10
Hidden signitures.
Details
01-19-2010
5.70
Finished riveting bottom forward skins.
Details
01-18-2010
4.50
Built fuselage rolling dolly.
Details
01-17-2010
3.00
Started riveting forward bottom skins.
Details
01-16-2010
3.50
Dimpled and primed forward bottom skins.
Details
01-15-2010
3.00
Deburred forward bottom skins.
Details
01-14-2010
3.30
Forward bottom skins.
Details
01-12-2010
4.50
Grove landing gear installation-Part 4.
Details
01-11-2010
3.40
Grove landing gear installation-Part 3.
Details
01-09-2010
2.00
Grove landing gear installation-Part 2.
Details
01-05-2010
3.50
Grove landing gear installation-Part 1.
Details
01-02-2010
4.00
Installed WD-808 rear seatback support.
Details
01-01-2010
3.00
Riveted F-819 aft deck.
Details
12-31-2009
6.00
Installed cockpit rails and F-817 support plates.
Details
12-30-2009
7.00
Finished riveting fuselage skins.
Details
12-29-2009
4.50
Finished rotating fuselage stand.
Details
12-28-2009
6.70
More work on rotating fuselage stand.
Details
12-27-2009
2.60
Various little jobs.
Details
12-26-2009
5.80
Finished riveting tailcone.
Details
12-24-2009
3.30
Started work on rotating fuselage stand.
Details
12-23-2009
5.00
Finished riveting F-823 fuselage side skins.
Details
12-22-2009
2.20
Miscellaneous piddling around.
Details
12-21-2009
4.20
More F-823 fuselage mid side skin riveting.
Details
12-20-2009
0.30
Installed rudder pedal extensions.
Details
12-20-2009
4.50
Installed Dynon pitch servo brackets.
Details
12-17-2009
1.70
Set rivets at top of F-823 fuselage side skins.
Details
12-12-2009
2.70
Finished riveting F-820 forward fuselage skin.
Details
12-10-2009
6.60
Fuselage forward side skin riveting.
Details
12-09-2009
4.20
Tail spring mount and tailcone bulkheads.
Details
12-08-2009
0.10
Gear leg and empenage fairings arrived.
Details
12-08-2009
5.40
Final preparations for fuselage skin riveting.
Details
11-29-2009
4.70
Fuselage forward side skins.
Details
11-27-2009
5.40
Completed fuel, vent and brake lines.
Details
11-26-2009
3.20
Moved vent line exit holes.
Details
11-25-2009
3.00
Fabricated flap blocks.
Details
11-24-2009
0.50
Received my Grove Landing Gear!
Details
11-23-2009
3.70
Seat floors and elevator control system.
Details
11-22-2009
3.30
Installed trim knob and started seat floors.
Details
11-21-2009
1.00
Finished rudder pedal assembly.
Details
11-19-2009
6.50
More work on the rudder pedal assembly.
Details
11-18-2009
4.00
More work on rudder pedal assembly.
Details
11-17-2009
1.70
Rudder pedals.
Details
11-17-2009
1.70
Left tank to selector valve line installed.
Details
11-16-2009
4.20
Right hand fuel tank line installed.
Details
11-15-2009
2.30
More fuel line bending.
Details
11-12-2009
2.00
One fuel line complete.
Details
11-11-2009
1.30
Right hand vent line complete.
Details
11-10-2009
1.50
More fiddling with vent and fuel lines.
Details
11-09-2009
3.80
Fuel vent lines - Part 1.
Details
11-08-2009
3.00
Set up for fuel line installation.
Details
11-08-2009
2.00
Riveted F-887 upper longeron to firewall brackets.
Details
11-07-2009
2.80
Finished up priming some fuselage parts.
Details
11-06-2009
4.80
Various fuselage riveting.
Details
11-05-2009
0.50
Platenute installation - various
Details
11-04-2009
4.00
Riveted arm rests to fuselage bulkheads.
Details
11-02-2009
0.70
Installed platenuts for manual aileron trip cover.
Details
11-01-2009
4.00
Started fuselage final assembly.
Details
10-31-2009
1.50
Riveted battery tray.
Details
10-30-2009
2.50
Still priming fuselage parts.
Details
10-29-2009
4.50
Primed fuselage parts.
Details
10-26-2009
5.00
Primed fuselage parts.
Details
10-25-2009
4.80
Primed fuselage parts.
Details
10-24-2009
8.50
FInished dimple fuselage countersinks.
Details
10-21-2009
4.30
Fuselage skin scuffing and dimpling.
Details
10-20-2009
3.30
Primed F-887 longerons.
Details
10-19-2009
2.00
Scuffed and dimpled various fuselage parts.
Details
10-10-2009
4.00
Dimple countersunk various fuselage parts.
Details
10-05-2009
2.50
Finished deburring fuselage skins.
Details
10-04-2009
3.00
Deburred fuselage skins.
Details
09-29-2009
3.70
Deburred various fuselage substructure parts.
Details
09-27-2009
3.00
Countersunk F-888, F-889.
Details
09-26-2009
2.50
Countersunk various fuselage parts.
Details
09-23-2009
3.00
Cut notches and trimmed length of F-887.
Details
09-22-2009
4.40
Drilled countersinks and deburred F-887.
Details
09-16-2009
4.50
Countersinking fuselage longerons - Part 3.
Details
09-15-2009
3.50
Countersinking fuselage longerons - Part 2.
Details
09-14-2009
3.00
Countersinking fuselage longerons - Part 1.
Details
09-11-2009
3.00
Andair fuel valve installation part 3.
Details
09-10-2009
5.00
Andair fuel valve installation part 2.
Details
09-09-2009
4.50
Andair fuel valve installation part 1.
Details
09-07-2009
5.50
Disassembled tail and center section.
Details
09-06-2009
2.00
Began disassembly of tailcone.
Details
09-05-2009
4.70
WD-808 Front seat support brace - do over.
Details
08-27-2009
4.30
Riveted the rear seat back.
Details
08-26-2009
3.30
Riveted front seat back.
Details
08-25-2009
3.50
Prepared and primed seat back parts.
Details
08-22-2009
5.70
Front and rear seat backs.
Details
08-21-2009
1.00
Started work on the seatbacks.
Details
08-20-2009
1.50
Started on battery tray.
Details
08-18-2009
6.50
Tailspring mount installed on aft bulkheads.
Details
08-17-2009
3.00
Match drilled F-808 seatback support (Big mistake)
Details
08-16-2009
1.40
Match drilled F-804 center section to bottom skins
Details
08-15-2009
5.70
Finished drilling cockpit rails to upper longerons
Details
08-14-2009
4.50
Finished drilling tail cone skins to F-887 longero
Details
08-13-2009
2.00
Drilled the L/H F-824 skin to upper longeron.
Details
08-12-2009
3.30
Drilled R/H F-824 skin to upper longeron.
Details
07-28-2009
2.50
Drilled tail cone skins.
Details
07-27-2009
4.60
Drilled F-823 mid fuselage skins.
Details
07-25-2009
5.50
Finished drilling forward side skins.
Details
07-24-2009
4.50
Drilled F-843 / F-844 Longerons.
Details
07-16-2009
2.00
More work on tail cone installation.
Details
07-15-2009
8.30
Clecoed tail cone onto foward fuselage.
Details
07-14-2009
3.20
Deburred tailcone skins and rail caps.
Details
07-13-2009
4.30
Rear seat belt attach brackets.
Details
07-13-2009
1.50
Adding Tailcone to fwd fuselage section.
Details
07-12-2009
3.80
Started on Aft Fuselage Assembly.
Details
07-12-2009
1.00
Riveted tail cone bulkheads.
Details
07-11-2009
3.00
Primed tail cone bulkheads.
Details
07-10-2009
5.00
More work on aft most tailcone bulkheads.
Details
07-09-2009
2.50
Worked on aft tail cone bulkheads.
Details
07-08-2009
2.50
Tail wheel spring mount.
Details
07-07-2009
3.70
Clecoed forward skins.
Details
07-05-2009
2.00
Deburred edges of the tailcone bulkheads.
Details
07-01-2009
4.30
Deburred forward skin.
Details
06-24-2009
4.00
More work on manual aileron trim system.
Details
06-23-2009
5.40
Final drilled arm rests and mid skin bulkheads.
Details
06-22-2009
4.70
Riveted seat rib bottom skins.
Details
06-21-2009
6.30
Rolled F-823-1 aft lower edges.
Details
06-19-2009
4.80
Deburred Mid Fuse skins and structure parts.
Details
06-18-2009
2.90
Fwd Fuselage Aux Longerons and gussets.
Details
06-17-2009
5.00
Finished drilling F-843 lower longerons.
Details
06-15-2009
3.90
Finished bending longerons.
Details
06-14-2009
6.50
Longeron bending.
Details
06-11-2009
1.50
Radiused and deburred Fwd Fuse gussets.
Details
06-10-2009
2.00
Forward Fuselage Structure.
Details
06-05-2009
6.00
More work on Seat Rib Subassembly.
Details
06-04-2009
1.70
Riveted Rear Spar Attach Bulkhead.
Details
06-04-2009
5.50
Primed Seat Rib Subassembly.
Details
06-03-2009
5.00
Dimpled center bottom skins.
Details
06-02-2009
3.00
More deburring and surface preparation on Seat Rib
Details
06-01-2009
4.50
Match drilled seat rib Subassembly.
Details
06-01-2009
4.00
Deburred Seat Rib Subassembly.
Details
05-30-2009
5.30
Started Seat Rib Subassembly.
Details
05-29-2009
4.50
Finished center sectioin.
Details
05-28-2009
5.00
Details
05-27-2009
4.90
More work on center section.
Details
05-26-2009
3.00
Riveted Firewall to floor.
Details
05-25-2009
5.00
Started Center Section.
Details
05-24-2009
3.70
Riveted Fwd baggage parts.
Details
05-23-2009
3.00
Primed Forward Fuselage Sub Structure.
Details
05-21-2009
2.30
Primer and platenuts on F-866B-1 / access plate.
Details
05-17-2009
5.00
Instrument panel rear access modification.
Details
05-14-2009
8.30
Completed landing gear boxes.
Details
05-13-2009
6.00
Priming and platenut riveting.
Details
05-11-2009
5.50
More work on landing gear boxes.
Details
05-10-2009
1.00
Primed some of the landing gear box parts.
Details
05-10-2009
4.60
Forward fuselage sub structure.
Details
05-09-2009
0.10
Continue work on landing gear boxes.
Details
05-08-2009
3.00
Started work on the landing gear boxes.
Details
05-08-2009
2.70
Finished work on the forward floor assembly.
Details
05-07-2009
6.00
Prepared and primed forward floor.
Details
05-06-2009
5.50
Forward floor and cooling air ramp work.
Details
05-05-2009
4.50
Finished riveting firewall.
Details
05-04-2009
3.80
Firewall riveting.
Details
05-03-2009
4.30
Firewall parts primed.
Details
05-02-2009
3.50
Firewall countersinking.
Details
04-17-2009
5.20
Match drilled and deburred firewall parts.
Details
04-15-2009
1.00
Deburred firewall.
Details
04-13-2009
1.30
More work on firewall parts.
Details
04-12-2009
3.00
Started fuselage firewall work.
Details
03-04-2009
15.00
Inventoried the fuselage kit.
Details
02-23-2009
2.00
Fuselage kit arrives!
Details
SITE NAVIGATION
Contact Builder
RV-8 Home
Category
# Logs
# Hours
All
1018
4065
Ailerons
25
84
Avionics
64
344
Empennage
118
324
Engine
4
17
Firewall Forward
61
308
Flaps
11
51
Fuel Tanks
54
190
Fuselage
457
1889
Misc Pics
6
4
Miscellaneous
26
215
Pics of me building
6
4
Prop
2
11
Tools
12
10
Training Kits
8
24
Wings
153
557
Workshop Setup
11
33
Copyright © 2001-2024 Matronics. All Rights Reserved.