Ralph Finch RV-9A Build
RV-9A
Electrical
Work Logs Found:
54
Category Work Time:
134 Hours
Date
Hours
Work Log Summary
Details
11-26-2014
1.00
Secured FWF temp probe
Details
11-16-2014
3.00
Wired oil sump heater
Details
10-26-2014
8.00
Another makeup entry
Details
10-15-2014
3.00
Crimped and soldered terminal lugs on all large ca
Details
10-01-2014
3.00
Dynon boxes
Details
09-27-2014
1.00
Wired MAP sensor
Details
09-25-2014
1.00
Attached transponder
Details
09-24-2014
3.00
Began placing instruments
Details
09-23-2014
1.50
Wired more sensors
Details
09-07-2014
1.00
Unsoldered/resoldered an ignition wire
Details
02-24-2013
0.50
Sealed oil sump heater wires
Details
02-10-2013
1.50
Mounted cabin lights
Details
02-06-2013
2.00
Cabin lights
Details
02-05-2013
1.50
Almost finished power adapters for baggage area
Details
01-26-2013
4.00
Baggage area wiring
Details
05-16-2012
4.50
Finished flap indicator install
Details
05-15-2012
0.50
Installed 3-conductor AMP connector to flap indica
Details
05-05-2012
1.00
Baggage lights
Details
04-04-2012
2.00
Misc cleanup, prep for aft top skin
Details
04-01-2012
1.50
Finished wing strobe wiring in fuse, part 2
Details
04-01-2012
0.00
Finished wing strobe wiring in fuse, part 1
03-31-2012
3.00
Re-did strobe cables
Details
03-30-2012
1.00
Made shielded 3-wire cable
Details
03-28-2012
1.00
Wing strobe wiring
Details
01-23-2012
1.50
OAT probe wiring
Details
01-21-2012
2.00
More final wiring changes
Details
01-15-2012
3.00
Tail lights and control stick wiring
Details
01-08-2012
3.00
Misc electrical wiring
Details
01-02-2012
1.00
Put Molex connectors back on wires
Details
12-14-2011
1.00
Removed/cut Molex connectors
Details
11-25-2011
4.00
Finished Garmin cable, ELT testing
Details
11-20-2011
2.00
Started adding terminals to Garmin cable
Details
11-12-2011
5.00
ELT wiring
Details
10-27-2011
1.00
Routed wires
Details
10-26-2011
3.00
Wired strobe pwr supplies, tail lite,...
Details
10-09-2011
1.00
Added D-Sub connector to elev servo
Details
10-08-2011
0.50
Crimped pins onto elevator servo wires
Details
09-11-2011
2.00
Added flap wiring
Details
08-31-2011
2.00
Wired fuel pump
Details
01-08-2010
3.00
Wired right landing light
Details
01-07-2010
1.50
Added ground block to right wing
Details
12-20-2009
3.00
LED Nav light assy for right wing
Details
11-04-2009
2.00
Nav lights
Details
08-02-2009
2.00
Fixed ground connectors.
Details
05-14-2009
2.00
Replaced two ground wire pop rivets with driven.
Details
05-13-2009
6.00
Install Dynon pitot tube heater controller
Details
04-16-2009
1.00
Ran wires thru conduit for nav, landing lights
04-12-2009
4.00
Ground block, power supplies in left wing tip
Details
03-21-2009
2.00
Sac RVators meeting...
Details
03-20-2009
6.00
Nav lights continued
03-19-2009
6.00
Nav lights continued
03-18-2009
6.00
Nav lights
Details
03-04-2009
4.00
Finished cabling for strobes
03-01-2009
4.00
Navigation lights
Details
SITE NAVIGATION
Contact Builder
RV-9A Home
Category
# Logs
# Hours
All
785
2214
Canopy
62
162
Controls
22
40
Cowl
85
172
Electrical
54
134
Empennage
30
111
Engine
88
193
Firewall
20
45
Fluid Plumbing
44
138
Fuselage
175
560
Garage Setup
10
87
LdgGear/Wheels
11
18
Miscellaneous
25
90
Plumbing
44
138
Tools
1
2
Wings
114
324
Copyright © 2001-2024 Matronics. All Rights Reserved.