Carl Bells RV7A N947CB
RV 7A
Avionics
Work Logs Found:
31
Category Work Time:
163 Hours
Date
Hours
Work Log Summary
Details
05-04-2010
1.00
ELT - batteries and hookup
Details
03-07-2010
3.00
Priming and painting panel brow
Details
12-22-2009
3.50
Programming the TruTrak Autopilot
12-17-2009
50.00
Avionics Programming and checkout
Details
10-07-2009
2.00
USB Cable to GRT panel for software loads
Details
08-01-2009
1.50
Connector for trim indicators
Details
07-24-2009
2.00
Wiring is finally done
Details
07-24-2009
2.00
Mounting the GRT and G696
Details
07-24-2009
2.00
Installing the right panel instruments for check o
Details
07-17-2009
6.00
Firing up the GRT EFIS & EM Sensors
Details
06-18-2009
3.00
Installing the Tru Trak Digifight IIVSVG harness
Details
06-05-2009
5.00
Fabrication of headset jacks
Details
06-03-2009
8.00
Installing the magnetometer in the wing tip
Details
06-01-2009
5.00
Fuel pump wiring
Details
05-29-2009
5.00
Wiring the ignition, magnetos, and OV/LV Module
Details
05-27-2009
6.00
Wiring the clock, G meter and GPS antennas
Details
05-15-2009
5.00
Wiring the Over Voltage/Under Voltage module
Details
05-13-2009
6.00
Mounting the TruTrak Autopilot Servos and Turn and
Details
05-11-2009
4.00
Mounting GPS Ant, ARINC, OVP & Current Limiter
Details
05-08-2009
6.00
Mounting the GPS antennas
Details
04-26-2009
2.00
Finishing off the radio stack cover panel
Details
04-25-2009
3.00
Rear mounting of the radio stack
Details
04-25-2009
3.00
Mounting the radio stack
Details
04-18-2009
5.00
Wiring stuff
Details
04-17-2009
2.00
Emergency Locater Transmitter
Details
04-15-2009
6.00
Installing the Black Box (ok the Orange Box)
Details
04-08-2009
6.00
Installing the Magnetometer
Details
04-06-2009
3.00
Communications Antenna
Details
02-25-2009
3.00
Installing the Communications Radio Antenna
Details
02-24-2009
2.00
Main and endurance bus fuse
Details
02-24-2009
2.00
Installing the Transponder Antenna
Details
SITE NAVIGATION
Contact Builder
RV 7A Home
Category
# Logs
# Hours
All
524
2392
*Project Status*
4
1
Avionics
31
163
Canopy
50
254
Control Systems
42
211
Cowl and Baffle
38
182
Elevator
15
80
Empennage
14
60
Engine
22
76
Engine Wiring
4
19
Fiberglass Finishing
15
77
Firewall forward
21
83
Flight Testing
2
8
Fuel Tanks
1
6
Fuselage
59
291
Hanger
4
0
Horizontal Stab
11
63
Interior & Upolstery
8
30
Landing Gear
7
28
Miscellaneous
14
48
Paint
4
30
Paint Designs
6
10
Panel
28
118
Panel Design
3
4
Panel Wiring
10
40
Plumbing & Wiring
26
114
Propeller
2
4
Propeller
2
3
Rudder
7
38
Upholstery-Interior
1
1
Vertical Stabilizer
4
19
Wheel Fairings
20
100
Wings
49
231
Copyright © 2001-2024 Matronics. All Rights Reserved.