Alans Web Site
Zenith CH601 XLB
Empennage
Work Logs Found:
17
Category Work Time:
62 Hours
Date
Hours
Work Log Summary
Details
09-21-2008
2.00
replace rudder rib 6t4-6
Details
09-14-2008
2.00
Applied 2nd coat of apoxy resin and glass
Details
04-27-2008
4.00
deburred and riveted elevator
Details
04-26-2008
4.00
Installed elevator horns and braces
Details
04-25-2008
4.00
elevator control horns
04-22-2008
2.00
drill pilot holes for elevator hinge to stab
Details
04-12-2008
5.00
elevator and elevator trim tab and servo assembly
Details
04-07-2008
1.50
started assembly of rear elevator
Details
03-22-2008
4.00
drilled all pilot holes with #30 drill bit
Details
03-17-2008
6.00
rear stabilizer assembly
Details
01-12-2008
4.50
riveted skelton, drilled elevator skins
Details
01-11-2008
2.50
disassembled and deburred skeleton
Details
01-04-2008
3.50
drilled remaining pilot holes on horzontal skeleto
Details
11-09-2007
4.00
horizonal tail. marked drilled clecoed
Details
10-22-2007
5.00
rudder skin pages 1 to 14 completed rudder
Details
10-21-2007
2.00
rudder skins 6 -T -5 pages 1 to 14 in manual
Details
10-20-2007
6.00
rudder skeleton pages 1 to 16 in manual
Details
SITE NAVIGATION
Contact Builder
Zenith CH601 XLB Home
Category
# Logs
# Hours
All
145
404
Empennage
17
62
Engine
16
41
engine management
6
13
firewall
4
6
fuel tanks
4
8
Fuselage
9
28
ignition system
2
3
instrument panel
13
41
kit inventory
4
17
left wing
27
68
Miscellaneous
1
2
None
4
17
nose gear strut asse
3
2
right wing
23
60
Tools
1
2
wing updates
11
34
Copyright © 2001-2024 Matronics. All Rights Reserved.