Powered By Kitlog Pro v2.0
Alans Web Site
Zenith CH601 XLB
Engine
Work Logs Found:
16
Category Work Time:
41 Hours
Date
Hours
Work Log Summary
Details
08-24-2022
2.50
test stand
Details
11-09-2021
2.00
installed oil filter housing
Details
04-14-2021
3.00
remove oil pan and oil pump housing
Details
03-04-2021
2.00
installed carb mixture cable
Details
02-22-2021
2.00
shimed starter ring gear and drive clearence
Details
02-21-2021
2.00
modify test stand engine cover
Details
02-20-2021
2.00
engine test stand install mixture cable
Details
06-09-2020
2.00
removed oil cooler on test stand engine
Details
03-11-2018
2.00
installed ignition wires on engine/ oil lines
Details
11-05-2014
0.10
testing date log
Details
02-13-2009
2.00
resurface gasket area on heads
Details
11-11-2008
1.00
fabricated oil port cover
Details
08-03-2008
8.00
assembled engine block
Details
07-01-2008
1.00
check distributor from William Wynns
Details
01-12-2008
1.50
cut out end cover crank housing as per manual
Details
07-04-2005
8.00
disassembled used corvair engine core
Details
SITE NAVIGATION
Contact Builder
Zenith CH601 XLB Home
Category
# Logs
# Hours
All
145
404
Empennage
17
62
Engine
16
41
engine management
6
13
firewall
4
6
fuel tanks
4
8
Fuselage
9
28
ignition system
2
3
instrument panel
13
41
kit inventory
4
17
left wing
27
68
Miscellaneous
1
2
None
4
17
nose gear strut asse
3
2
right wing
23
60
Tools
1
2
wing updates
11
34
Copyright © 2001-2024 Matronics. All Rights Reserved.