KitLog pro

Powered By Kitlog Pro v2.0

Brad Wilkinson, Bearhawk #1062
Work Logs Found: 31
Category Work Time: 60 Hours
 Date
Hours
Work Log Summary

Details

 03-21-2010
4.00
Boot Cowl, Belly Pan - Sta. B to C
Details
       

 02-07-2010
3.00
Station B Bulkhead - Nutplates and Primer
Details
       

 11-29-2009
0.50
Boot Cowl, Installed to check fit
Details
       

 11-29-2009
2.00
Boot Cowl, Inst Panel attachment
Details
     

 11-26-2009
1.50
Boot Cowl, Right Side - Rear attachment
Details
     

 11-25-2009
3.00
Boot Cowl, Right Side - Firewall attachment
Details
       

 11-24-2009
2.00
Boot Cowl, Right Side 2 - Trimming, flanging
Details
       

 11-23-2009
1.50
Boot Cowl, Right Side 1 - Match drilling
Details

 11-22-2009
0.50
Boot Cowl, Left Side 3 - Done
Details
       

 11-22-2009
2.00
Boot Cowl, Left Side 2 - Rear attachment
Details
       

 11-22-2009
2.00
Boot Cowl, Left Side 1 - Top attachment
Details
     

 10-04-2009
3.00
Boot Cowl, Left Side - Firewall attachment
Details
       

 09-19-2009
1.00
Boot Cowl, Lower Access Panels - Assembly
Details
       

 09-12-2009
2.00
Boot Cowl, Lower Access Panels - Primer
Details
       

 09-07-2009
2.00
Boot Cowl, Lower Access Panel 3
Details
       

 09-07-2009
1.00
Boot Cowl, Lower Access Panel 2
Details
       

 09-06-2009
1.00
Boot Cowl, Lower Access Panel
Details
     

 09-05-2009
2.00
Second Boot Cowl reinforcing rib
Details
     

 09-03-2009
2.00
Hammerform Brake & Boot Cowl Ribs
Details
       

 07-04-2009
4.00
Boot Cowl Left Side, 2
Details
       

 06-28-2009
3.00
Boot Cowl, Top and Left
Details
       

 06-28-2009
1.00
Boot Cowl Left Side, 1
Details
       

 06-27-2009
2.00
Instrument Panel Top Bow, 2
Details
       

 06-27-2009
4.00
Instrument Panel Top Bow, 1
Details
       

 04-27-2009
0.25
Ordered countersunk nutplates
Details

 03-04-2009
0.25
Ordered 2024-T3 Aluminum Sheet
Details

 03-01-2009
3.00
Boot Cowl, Top Section
Details
       

 02-15-2009
2.00
Station B Bulkhead & Tunnel
Details
       

 02-15-2009
2.00
Drilled Firewall tunnel
Details
       

 01-11-2009
0.50
Station B Bulkhead
Details
       

 01-10-2009
2.00
Started installing Firewall
Details
       










Copyright © 2001-2024 Matronics. All Rights Reserved.