KitLog pro

Powered By Kitlog Pro v2.0

Steves Web Site
Work Logs Found: 27
Category Work Time: 84 Hours
 Date
Hours
Work Log Summary

Details

 09-01-2010
3.00
Prep for Certification
Details

 08-06-2010
2.00
Inspection and fixes
Details

 06-19-2010
3.00
Static Display at EAA 72 Chapter Breakfast
Details
     

 06-18-2010
1.00
Aircraft weighing
Details

 05-23-2010
4.00
Load gyro onto trailer
Details

 05-04-2010
0.50
Compass pad adjustment
Details

 05-01-2010
1.00
Level Compass
Details
     

 03-25-2010
3.00
Tail number, Exp sticker, Alt Ign wire
Details

 03-14-2010
1.00
Tail Decals
Details
       

 10-23-2009
2.00
Tow Bar
Details

 10-21-2009
4.50
Electrical, engine harness, heater hose
Details
       

 10-19-2009
3.00
Headlight, exhaust header
Details
       

 10-16-2009
1.50
Engine Wiring
Details

 10-07-2009
2.50
Battery tie down and 12v socket
Details
       

 10-03-2009
8.00
Paint Pod and support
Details
       

 10-02-2009
5.00
Pod, Grounding Point
Details

 09-14-2009
2.00
Strip Pod Paint, Pinon Gear, Control
Details

 09-07-2009
8.00
fuel lines, rotor brake cable
Details
       

 08-10-2009
4.00
Reassemble Drawings
Details

 07-03-2009
1.00
Paint Instrument Panel
Details

 07-01-2009
3.00
Radiator Protector
Details

 06-14-2009
7.00
Pitman arm, raditator
Details
       

 05-17-2009
3.50
Painted misc parts
Details

 03-14-2009
3.00
Rivet heater
Details

 02-25-2009
6.00
Started small assemblies
Details

 12-03-2008
2.00
Unpacked Boxes

 12-02-2008
0.00
Purchase Kit from Garret Nickolson
Details
       










Copyright © 2001-2024 Matronics. All Rights Reserved.