Powered By Kitlog Pro v2.0
Wendells RV-6A
RV-6A
Engine
Work Logs Found:
70
Category Work Time:
184 Hours
Date
Hours
Work Log Summary
Details
03-12-2024
6.00
Engine Start
Details
01-02-2024
2.00
Update to latest Pressure Senders
Details
11-28-2023
1.00
Re-test Starter Performance
Details
10-31-2023
2.00
Test Starter Action
Details
10-17-2023
2.00
Fix Boost Pump and Test Flows
Details
10-11-2023
2.00
Getting ready for engine start
Details
10-10-2023
2.00
Rigged Fuel Lines to measure fuel flow.
Details
03-12-2014
0.00
Install Oil Cooler and Brace 2
Details
03-12-2014
2.00
Install Oil Cooler and Brace
Details
03-12-2014
2.00
Install Engine Baffles 20
Details
03-12-2014
0.00
Install Engine Baffles 19
Details
03-12-2014
6.00
Install Engine Baffles 18
Details
03-10-2014
4.00
Firewall Forward Clamps Safety Wired
Details
03-06-2014
3.50
Install Engine Baffles 17
Details
03-03-2014
0.00
Install Engine Baffles 16
Details
03-03-2014
8.00
Install Engine Baffles 15
Details
02-02-2014
0.00
Install Engine Baffles 14
Details
02-02-2014
3.00
Install Engine Baffles 13
Details
02-02-2014
8.00
Install Engine Baffles 12
Details
01-16-2014
2.00
Install Engine Baffles 11
Details
01-15-2014
4.00
Install Engine Baffles 9
Details
01-15-2014
3.00
Install Engine Baffles 10
Details
12-05-2013
2.00
Reroute EGT/CHT wires 3
Details
11-25-2013
0.00
Skytec XLT starter
Details
11-18-2013
2.00
Reroute EGT/CHT wires 2
Details
11-18-2013
2.00
Reroute EGT/CHT wires 1
Details
11-18-2013
2.00
Install ASA oil separator 4
Details
11-14-2013
3.00
Install Horizontal Air Intake Plenum 4
Details
11-04-2013
2.00
Install Horizontal Air Intake Plenum 3
Details
11-03-2013
5.00
Install Horizontal Air Intake Plenum 2
Details
10-21-2013
4.00
Prepare PCU5000X Governor 2
Details
10-19-2013
8.00
Install Engine Baffles 8
Details
10-16-2013
4.00
Install Horizontal Air Intake Plenum
Details
10-14-2013
4.00
Install Engine Baffles 7
Details
09-27-2013
4.00
Install Engine Baffles 6
Details
09-19-2013
2.00
Removed Governor Mounting Studs
Details
09-18-2013
2.00
Prepare PCU5000X Governor
Details
08-27-2013
0.50
Newest XLT Starter Install
Details
05-22-2013
0.00
Install Engine Baffles 5
Details
05-22-2013
0.00
Install Engine Baffles 4
Details
05-22-2013
8.00
Install Engine Baffles 3
Details
05-21-2013
0.00
Install Engine Baffles 2
Details
05-21-2013
8.00
Install Engine Baffles 1
Details
05-02-2013
3.00
EGT-CHT Sensors and Misc.
Details
04-30-2013
2.00
Readjust Bendix connections for spacer.
Details
04-24-2013
4.00
Sniffle Valve Installation
Details
04-24-2013
1.00
Install drain line from fuel pump
Details
04-23-2013
0.00
Vetterman Xover Exhaust Installation 3
Details
04-23-2013
0.00
Vetterman Xover Exhaust Installation 2
Details
04-23-2013
5.00
Vetterman Xover Exhaust Installation 1
Details
04-08-2013
2.00
Install ASA oil separator 3
Details
04-08-2013
3.00
Install ASA oil separator 2
Details
04-08-2013
3.00
Install ASA oil separator 1
Details
04-04-2013
1.00
Made new throttle bracket for Superior Sump
Details
04-03-2013
3.00
Attach Mixture;Torque Mounting bolts
Details
04-02-2013
0.00
Installed engine on firewall 3
Details
04-02-2013
0.00
Installed engine on firewall 2
Details
04-02-2013
3.00
Installed engine on firewall
Details
03-28-2013
1.00
Received Oil Separator-Adel clamp fuel line.
Details
03-28-2013
4.00
Oil return line from #4 cylinder
Details
03-28-2013
2.00
Added fittings to mechanical fuel pump
Details
03-15-2013
5.00
Update IO360B1E to IO360WLE
Details
03-15-2013
2.00
Continue modifying engine
Details
03-02-2013
1.00
Acquaint myself with Oil Cooler stuff
Details
02-28-2013
2.00
Swapped out oil filter mount.
Details
12-08-2012
2.00
Oil, Fuel, Maniford pressure fittings.
Details
10-18-2012
3.00
Engine Mount Installed
Details
03-13-2012
0.50
Remove Moisture from Dessicant
Details
01-06-2009
4.00
Prepared the engine for a year storage.
Details
12-31-2008
2.00
Lycoming IO-360 B1E
Details
SITE NAVIGATION
Contact Builder
RV-6A Home
Category
# Logs
# Hours
All
728
2403
Ailerons
22
72
Avionics
35
156
Canopy
63
190
Controls
24
82
Cowling
21
94
Electrical
44
183
Empennage
30
115
Engine
70
184
Firewall
11
32
Flaps
33
125
Fuselage
144
503
Gear
15
57
Miscellaneous
1
Move the Kit to FL
3
4
Panel
29
86
Prop
5
10
Smoke
7
14
Tools
3
5
Vans Training Kit
6
9
Videos
2
Wings
160
482
Copyright © 2001-2024 Matronics. All Rights Reserved.