Powered By Kitlog Pro v2.0
PATRICK'S WEB SITE
Genesis
Wings
Work Logs Found:
51
Category Work Time:
201 Hours
Date
Hours
Work Log Summary
Details
09-30-2006
4.00
Started right jury struts and got 3/4 way done.
Details
09-09-2006
4.00
jury struts left wing
Details
08-05-2006
6.00
Hung wings
Details
10-02-2005
6.50
Attched airleronto left wing
Details
10-01-2005
5.00
attached airleron and taped gap seal on rt wing
Details
09-24-2005
3.00
worked on attaching airleron to right wing
Details
09-17-2005
2.00
installed drains
Details
07-30-2005
4.00
Airleron work
Details
04-10-2005
3.00
Misc wing work
Details
12-19-2004
2.00
Fixied loose fabric on left wing
Details
04-04-2004
4.00
taped a tail piece, continued working on airleron
Details
03-25-2004
0.75
started prepping 2nd airleron for fabric
Details
08-01-2002
2.00
ironed out wrinkles on the edges of the tail piece
Details
07-29-2002
4.75
cut holes in fabric for strut and AOA probe added
Details
07-28-2002
5.00
applied pinked tape to perimeter of left wing
Details
07-27-2002
6.00
cleaned up fabric and applied lace tape, rivets an
Details
07-26-2002
7.50
finished applying and shrinking fabric on top of l
Details
07-25-2002
6.00
shrunk wingtip and began fabric application to top
Details
07-24-2002
8.00
prepped bottom of left wing for fabric
Details
07-22-2002
2.50
finished and shrunk bottom of left wing
Details
07-21-2002
6.00
beganapplying fabric to left wing
Details
07-20-2002
5.00
finsihed wing jig, prepped left wing for fabric
Details
07-19-2002
3.00
worked on building wing jigs
Details
07-18-2002
3.00
applied fabric tape to top of right wing
Details
07-17-2002
5.00
applied fabric tape to bottom of rt wing
Details
07-16-2002
4.00
rib laced and riveted th ebottom of right wing
Details
07-15-2002
5.00
shrunk fabric to top of right wing then applied ri
Details
07-01-2002
3.00
felted, taped and fabriced top of right wing
Details
06-20-2002
4.00
started working on the top of the right wing
Details
06-16-2002
2.00
finished fabric application to rt wing bottom
Details
06-09-2002
2.00
felted rib gussets applied more fabric to right wi
Details
06-08-2002
2.00
installed anti-chaif plate & started fabric applic
Details
06-02-2002
1.50
finished applying felts to wings
Details
06-01-2002
1.50
applied fabric to wingtips
Details
05-18-2002
1.50
applied felt to wing ribs and rough spots
Details
03-11-2001
1.00
Installed LRI probe mounting on wing platform with
Details
11-11-2000
3.00
Applied and shrunk fabric to flying surfaces
Details
05-07-2000
6.00
Left wimg
Details
05-06-2000
4.00
left wing
Details
04-23-2000
6.00
Left wing work
Details
11-28-1999
5.00
Left wing
Details
11-27-1999
6.00
Left wing
Details
11-26-1999
6.00
Right wing
Details
11-07-1999
3.00
Right wing leading edge
Details
10-17-1999
2.50
Right wing leading edge
Details
10-03-1999
8.00
Right wing ribs
Details
09-19-1999
7.00
Right wing work
Details
09-07-1999
2.00
Right wing work
Details
09-05-1999
4.00
Right wing work
Details
08-14-1999
2.00
Started working on wing ribs
Details
08-07-1999
1.00
Started work on wings
Details
SITE NAVIGATION
Contact Builder
Genesis Home
Category
# Logs
# Hours
All
312
1003
Electronics
15
38
Empennage
22
67
Engine
8
18
Exterior
35
121
Firewall Back
11
26
Fuselage
35
96
Hanger/Workshop
15
49
Insturment Panel
12
28
Interior
32
112
Kit
11
26
Miscellaneous
32
121
Paperwork
16
36
Shipping
1
0
Systems
1
1
Tools
4
5
Transportation
11
58
Wings
51
201
Copyright © 2001-2024 Matronics. All Rights Reserved.