Powered By Kitlog Pro v2.0
RV-7 Construction
RV-7
Wings
Work Logs Found:
52
Category Work Time:
256 Hours
Date
Hours
Work Log Summary
Details
05-24-2014
1.00
Left aileron
Details
05-17-2014
1.00
Aileron hinge brackets
Details
03-08-2014
1.50
Aileron hinge brackets
Details
03-02-2014
3.00
Installed fuel tanks
Details
02-16-2014
2.00
Riveted top skins on the left wing
Details
09-21-2013
2.00
Bruce helping me rivet the top skins
Details
09-18-2013
1.50
Began riveting top skin on the right wing
Details
09-13-2013
1.00
Primed rear spar rivet holes
Details
08-25-2013
1.00
Made and installed pitot tube line
Details
08-25-2013
0.00
Made and installed pitot tube line
Details
08-22-2013
1.00
Ran wiring conduit
Details
08-17-2013
1.50
Riveted main ribs to main spar
Details
07-02-2013
4.00
Landing lights
Details
06-30-2013
4.00
Fuel tanks complete
Details
05-14-2011
1.00
Tank work
Details
04-16-2011
0.50
Tank work
Details
04-02-2011
0.50
Tank work
Details
03-12-2011
1.50
Tank work
Details
02-19-2011
1.50
Tank work
Details
01-08-2011
2.00
Tank work
Details
12-11-2010
0.50
Tank work
Details
11-20-2010
1.50
Tank work
Details
11-06-2010
1.00
Tank work
Details
10-02-2010
154.00
Tank work
Details
10-01-2010
1.00
Dimpled the tank rivet holes
Details
09-23-2010
0.50
Drilled tank drain flange to tank skins
Details
09-22-2010
1.50
Drilled fuel tank flange
09-20-2010
1.50
Drilled platenut rivest attach holes and countersu
Details
09-19-2010
0.50
Drilled tank access plate screw holes
Details
09-18-2010
2.00
Drilled T-405 and T-410 made access hole for both
Details
09-16-2010
1.00
Finished cutting tank angle attach brackets
Details
05-28-2010
1.50
Rough cut left and right tank attach brackets
Details
05-24-2010
1.00
Enlarged left tank attach screw holes to #19
Details
05-23-2010
2.00
Countersunk tank skin to baffle holes on both tank
Details
05-22-2010
2.00
Drilled left fuel tank skin
Details
05-16-2010
2.00
Drilled W-423 joint plates to fuel tank
Details
05-15-2010
5.00
Drilled Z-Channel spar brackets
Details
10-09-2009
1.00
Fabricated cradle and assembled fuel tanks
Details
10-09-2009
1.00
Assembled fuel tanks
Details
09-04-2009
1.50
Drilled joint plate to leading edge
Details
08-14-2009
1.00
Clecoed and drilled leading edge skin to ribs
Details
08-07-2009
4.00
Drilled main skin to skeleton
Details
07-31-2009
1.00
Fabricated wing walk doubler
Details
07-17-2009
2.00
Riveted Ribs to main and rear spar
Details
07-11-2009
10.00
Primed ribs
Details
06-27-2009
2.00
Drilled ribs to main and rear spar
Details
06-20-2009
5.50
Wing ribs
Details
03-14-2009
6.00
Rear spar assembly
Details
02-14-2009
3.00
Fabricated tie down assembly and spacers
Details
02-07-2009
1.50
Riveted Wing Tank Nutplates to main spar
Details
01-30-2009
2.50
Right wing tank nutplate holes
Details
01-24-2009
3.50
Left wing tank nutplate holes
Details
SITE NAVIGATION
Contact Builder
CX7 Home
RV-7 Home
Category
# Logs
# Hours
All
106
392
Empennage
54
136
Wings
52
256
Copyright © 2001-2024 Matronics. All Rights Reserved.