KitLog pro

Powered By Kitlog Pro v2.0

RV-7 Construction
Work Logs Found: 52
Category Work Time: 256 Hours
 Date
Hours
Work Log Summary

Details

 05-24-2014
1.00
Left aileron
Details
     

 05-17-2014
1.00
Aileron hinge brackets
Details
       

 03-08-2014
1.50
Aileron hinge brackets
Details
       

 03-02-2014
3.00
Installed fuel tanks
Details
 

 02-16-2014
2.00
Riveted top skins on the left wing
Details
       

 09-21-2013
2.00
Bruce helping me rivet the top skins
Details
       

 09-18-2013
1.50
Began riveting top skin on the right wing
Details
     

 09-13-2013
1.00
Primed rear spar rivet holes
Details
       

 08-25-2013
1.00
Made and installed pitot tube line
Details
       

 08-25-2013
0.00
Made and installed pitot tube line
Details
       

 08-22-2013
1.00
Ran wiring conduit
Details
     

 08-17-2013
1.50
Riveted main ribs to main spar
Details
       

 07-02-2013
4.00
Landing lights
Details
       

 06-30-2013
4.00
Fuel tanks complete
Details
       

 05-14-2011
1.00
Tank work
Details
       

 04-16-2011
0.50
Tank work
Details
       

 04-02-2011
0.50
Tank work
Details
     

 03-12-2011
1.50
Tank work
Details
       

 02-19-2011
1.50
Tank work
Details
       

 01-08-2011
2.00
Tank work
Details
       

 12-11-2010
0.50
Tank work
Details
     

 11-20-2010
1.50
Tank work
Details
       

 11-06-2010
1.00
Tank work
Details
       

 10-02-2010
154.00
Tank work
Details
       

 10-01-2010
1.00
Dimpled the tank rivet holes
Details
       

 09-23-2010
0.50
Drilled tank drain flange to tank skins
Details
       

 09-22-2010
1.50
Drilled fuel tank flange
       

 09-20-2010
1.50
Drilled platenut rivest attach holes and countersu
Details
     

 09-19-2010
0.50
Drilled tank access plate screw holes
Details
     

 09-18-2010
2.00
Drilled T-405 and T-410 made access hole for both
Details
       

 09-16-2010
1.00
Finished cutting tank angle attach brackets
Details
     

 05-28-2010
1.50
Rough cut left and right tank attach brackets
Details
     

 05-24-2010
1.00
Enlarged left tank attach screw holes to #19
Details
     

 05-23-2010
2.00
Countersunk tank skin to baffle holes on both tank
Details
       

 05-22-2010
2.00
Drilled left fuel tank skin
Details
       

 05-16-2010
2.00
Drilled W-423 joint plates to fuel tank
Details
     

 05-15-2010
5.00
Drilled Z-Channel spar brackets
Details
       

 10-09-2009
1.00
Fabricated cradle and assembled fuel tanks
Details
       

 10-09-2009
1.00
Assembled fuel tanks
Details
       

 09-04-2009
1.50
Drilled joint plate to leading edge
Details
       

 08-14-2009
1.00
Clecoed and drilled leading edge skin to ribs
Details
       

 08-07-2009
4.00
Drilled main skin to skeleton
Details
       

 07-31-2009
1.00
Fabricated wing walk doubler
Details
       

 07-17-2009
2.00
Riveted Ribs to main and rear spar
Details
       

 07-11-2009
10.00
Primed ribs
Details
       

 06-27-2009
2.00
Drilled ribs to main and rear spar
Details
     

 06-20-2009
5.50
Wing ribs
Details
       

 03-14-2009
6.00
Rear spar assembly
Details
       

 02-14-2009
3.00
Fabricated tie down assembly and spacers
Details
       

 02-07-2009
1.50
Riveted Wing Tank Nutplates to main spar
Details

 01-30-2009
2.50
Right wing tank nutplate holes
Details
     

 01-24-2009
3.50
Left wing tank nutplate holes
Details
       










Copyright © 2001-2024 Matronics. All Rights Reserved.