Powered By Kitlog Pro v2.0
PATRICK'S WEB SITE
Genesis
Empennage
Work Logs Found:
22
Category Work Time:
67 Hours
Date
Hours
Work Log Summary
Details
12-02-2006
2.00
Installed elevator gap seal
Details
08-15-2006
10.00
Finished most of the tail
Details
05-06-2006
2.00
finished arraching hinges for elevator
Details
04-30-2006
2.00
Worked on empennage
Details
04-29-2006
4.00
Started tail and worked on windows
Details
08-11-2002
2.00
ironed out wrinkles on tail pieces and right wing,
Details
08-10-2002
6.00
worked in tail pieces and cut holes in other wing
Details
08-04-2002
4.00
worked on covering tail pieces, installing elevato
Details
08-03-2002
2.00
continued taping airleron
Details
08-02-2002
4.00
cleaned up and prepped airleron, began taping aile
Details
10-14-2000
1.00
shrunk fabric on horz stab, rivet & taped rudder
Details
10-08-2000
4.00
fabric to horz stab, taped & riveted rudder
Details
09-10-2000
4.00
Glued fabric to one side of horizontal stabilizer
Details
09-09-2000
2.00
preped tail pieces for fabric
Details
08-13-2000
4.00
Tail work
Details
08-12-2000
3.00
Started covering rudder.
Details
06-01-2000
1.00
Tail covering
Details
05-30-2000
4.00
Covering tail
Details
05-22-2000
1.50
Covering flying surfaces
Details
05-21-2000
2.00
Fabric on flying surfaces
Details
05-14-2000
1.00
Fabric qork
Details
07-29-1999
1.50
Bought hose, worked on elevator
Details
SITE NAVIGATION
Contact Builder
Genesis Home
Category
# Logs
# Hours
All
312
1003
Electronics
15
38
Empennage
22
67
Engine
8
18
Exterior
35
121
Firewall Back
11
26
Fuselage
35
96
Hanger/Workshop
15
49
Insturment Panel
12
28
Interior
32
112
Kit
11
26
Miscellaneous
32
121
Paperwork
16
36
Shipping
1
0
Systems
1
1
Tools
4
5
Transportation
11
58
Wings
51
201
Copyright © 2001-2024 Matronics. All Rights Reserved.