KitLog pro

Powered By Kitlog Pro v2.0

PATRICK'S WEB SITE
Work Logs Found: 22
Category Work Time: 67 Hours
 Date
Hours
Work Log Summary

Details

 12-02-2006
2.00
Installed elevator gap seal
Details

 08-15-2006
10.00
Finished most of the tail
Details

 05-06-2006
2.00
finished arraching hinges for elevator
Details

 04-30-2006
2.00
Worked on empennage
Details

 04-29-2006
4.00
Started tail and worked on windows
Details

 08-11-2002
2.00
ironed out wrinkles on tail pieces and right wing,
Details

 08-10-2002
6.00
worked in tail pieces and cut holes in other wing
Details

 08-04-2002
4.00
worked on covering tail pieces, installing elevato
Details

 08-03-2002
2.00
continued taping airleron
Details

 08-02-2002
4.00
cleaned up and prepped airleron, began taping aile
Details

 10-14-2000
1.00
shrunk fabric on horz stab, rivet & taped rudder
Details

 10-08-2000
4.00
fabric to horz stab, taped & riveted rudder
Details

 09-10-2000
4.00
Glued fabric to one side of horizontal stabilizer
Details

 09-09-2000
2.00
preped tail pieces for fabric
Details

 08-13-2000
4.00
Tail work
Details

 08-12-2000
3.00
Started covering rudder.
Details

 06-01-2000
1.00
Tail covering
Details

 05-30-2000
4.00
Covering tail
Details

 05-22-2000
1.50
Covering flying surfaces
Details

 05-21-2000
2.00
Fabric on flying surfaces
Details

 05-14-2000
1.00
Fabric qork
Details

 07-29-1999
1.50
Bought hose, worked on elevator
Details










Copyright © 2001-2024 Matronics. All Rights Reserved.