KitLog pro

Powered By Kitlog Pro v2.0

DAVID'S WEB SITE
Work Logs Found: 33
Category Work Time: 210 Hours
 Date
Hours
Work Log Summary

Details

 11-15-2009
6.00
Sensor initial placement
Details

 11-12-2009
4.00
Air induction system
Details

 10-24-2009
10.00
fab fuel shut off levers

 10-17-2009
8.00
install engine controls

 10-10-2009
18.00
fab air induction system

 09-26-2009
14.00
air induction system
Details

 09-19-2009
12.00
plumb oil system

 09-12-2009
15.00
Plumb fuel system

 09-05-2009
12.00
fuel system
Details

 07-07-2009
4.00
make fuel lines

 06-27-2009
8.00
mount fuel pump and filter

 06-20-2009
8.00
Install vents on sump and run fuel line to firewal

 06-15-2009
6.00
mount engine on airframe

 05-19-2009
6.00
Add more accessories

 05-12-2009
3.00
MIsc

 05-05-2009
6.00
mount fuel system

 04-23-2009
6.00
MIsc engine work

 04-21-2009
6.00
Install puhrods

 04-16-2009
4.00
Install valves

 04-14-2009
5.00
Install cylinders

 04-09-2009
3.00
install gears in accessory case

 04-07-2009
5.00
Install cam and close case

 04-02-2009
4.00
Install crank

 03-26-2009
5.00
Install rods on crank

 03-23-2009
1.00
crank back from ECI

 02-27-2009
2.00
send crank for regrind

 02-24-2009
4.00
Work on rebuild

 02-21-2009
2.00
take rods back off and arrange to ship crank to EC
Details

 02-19-2009
3.00
Rods on crank
Details

 02-18-2009
3.00
Pick up crank
Details

 01-16-2009
3.00
Crankshaft
Details
     

 12-15-2008
4.00
Unpack engine
       

 11-22-2008
10.00
PIck up engine in Wisconsin
     










Copyright © 2001-2024 Matronics. All Rights Reserved.