KitLog pro

Powered By Kitlog Pro v2.0

Radio Flyer Web Site
Work Logs Found: 104
Category Work Time: 302 Hours
 Date
Hours
Work Log Summary

Details

 12-07-2008
3.00
Removed engine cowling found sparkplug
Details
     

 12-06-2008
3.00
Complete wiring GPS1 back in the system
Details

 12-05-2008
2.00
Modified GPS antenna mount for magnetometer
Details
       

 12-05-2008
2.00
Fabricated GPS antenna mount
Details
     

 12-04-2008
3.00
Peter from Garmin gave verbal permission to modify
Details
     

 12-01-2008
4.00
A technician from Garmin, Peter. Evaluated
Details

 11-30-2008
3.00
Completed flap rewiring.
Details

 11-30-2008
2.00
Changed main battery to gel cell
Details

 11-29-2008
4.00
Worked on flaps rewiring
Details
       

 11-12-2008
20.00
Two technicians from Aerotronics
Details

 11-06-2008
2.00
Connect wing's ground to ground planes.
Details

 11-06-2008
2.50
Complete pito & static connections. Tested static
Details
     

 11-05-2008
1.50
Installed taxi and landing lights into the wings
Details
       

 11-05-2008
1.00
Fit assembly pito & static probe to wing
Details
     

 11-04-2008
3.50
Check will taxi and landing lights.
Details
     

 11-03-2008
4.50
Complete wiring connections to panel
Details

 10-16-2008
4.00
Worked on diagnosing landing gear sequence valve
Details
       

 10-15-2008
3.00
Worked on troubleshooting landing gear.
Details
       

 10-15-2008
5.00
Worked on flaps commissioning.
Details
       

 10-14-2008
2.00
Wired CHT's & EGT's on left side of engine
Details
       

 10-14-2008
7.00
Put aircraft on Jack's. Worked on commissioning
Details
       

 10-13-2008
8.00
Complete battery wiring. Connected batteries.
Details
       

 08-29-2008
1.50
Fabricate and locate navigation antenna allen wren
Details
     

 08-28-2008
0.50
Fabricate and bond net antenna guide tube into cov
Details
     

 08-21-2008
0.50
Install flap sensor for AOA and flap location.
Details
       

 08-21-2008
1.00
Cleaned up wiring under armrests and pilot and cop
Details
       

 08-20-2008
2.50
Fabricate flap sensors mounts for flap position an
Details
       

 08-13-2008
2.00
Install bonding strap from tail to firewall.
Details
       

 08-12-2008
0.50
Install space served between pitch servo and auto
Details
     

 08-12-2008
1.50
Fabricate microswitch mount for canopy latch annou
Details
       

 08-12-2008
1.30
Complete intercom wiring harness and installed.
Details
       

 08-07-2008
2.00
Complete installation of oxygen fill line and fill
Details
       

 08-07-2008
2.70
Cleaned up wiring runs in tail section
Details
       

 08-06-2008
5.70
Route and install oxygen lines
Details
       

 08-06-2008
1.50
Install oxygen wiring harness into aircraft.
Details
       

 08-05-2008
0.70
Wired tie cables in the tail section.
Details
     

 08-05-2008
3.50
Fabricate oxygen wiring harness with plug p-22-1
Details
       

 08-04-2008
2.50
Completed fabrication of GPS antenna wing tip moun
Details
       

 08-04-2008
2.50
Cleaned up man of antenna penetration on the left
Details
       

 08-01-2008
3.00
Install T-cast antennas and cables
Details
       

 07-31-2008
2.50
Fabricate number 2 com antenna ground plane
Details
       

 07-31-2008
2.00
Fabricate and run navigation antenna cable.
Details
     

 07-30-2008
3.50
Complete wiring mic and phone jacks to plug p-4
Details
       

 07-25-2008
1.50
Fabricates microphone wiring harness plug P-4.
Details
     

 07-23-2008
2.00
Fabricate grounding cables and install on engine a
Details
       

 07-22-2008
3.00
Locate and install auxiliary power plug and wired.
Details
       

 06-30-2008
2.30
Cleaned up navigation antenna mount and cover plat
Details
       

 06-25-2008
2.00
Fabricate navigation antenna side backing plate
Details
     

 06-24-2008
2.00
Locate and mount number 2 com radio antenna.
Details
       

 06-06-2008
1.00
Design bracket for auxiliary plug
Details

 06-05-2008
2.00
Wire landing gear hydraulic gear pump Annunciation
Details
       

 06-05-2008
2.50
Wire in ADI backup battery to charging system
Details
       

 06-04-2008
4.00
Completed wiring main battery circuitry.
Details
       

 06-03-2008
2.50
Prepared parts and installed main battery solenoid
Details
       

 06-03-2008
3.00
Fabricated ground bust for cabling in center Counc
Details
       

 05-30-2008
6.00
Worked on cleaning out wiring in center Council
Details
       

 05-29-2008
3.00
Worked on wiring.
Details
       

 05-28-2008
4.50
Cleaned up wiring runs
Details
       

 05-24-2008
5.00
Charlie fabricated plugs for forward of the firewa
Details
       

 05-24-2008
6.00
Both of us, pulled wires into wing roots
Details
       

 05-23-2008
0.50
Locate and Mount Main voltage regulato
Details
     

 05-23-2008
10.00
Charlie worked on aircraft wiring.
Details
       

 05-22-2008
2.00
Moved nut plates from airframe to instrument
Details
       

 05-22-2008
1.00
Locate and bond ADC backup battery
Details
     

 05-22-2008
0.70
Fabricated bracket and mounts for canopy air seal
Details
     

 05-22-2008
11.50
Charlie worked on wiring.
Details
       

 05-22-2008
0.40
Change standby regulator nuts to nut plates.
Details
       

 05-21-2008
2.00
Fabricated and installed through firewall power lu
Details
       

 05-21-2008
12.50
Charlie, fabricate cables and continued electrical
Details
       

 05-20-2008
1.00
Install firewall penetration for ELT's, EGT's, pro
Details
       

 05-20-2008
11.00
Charlie, Worked on instrument panel, firewall plug
Details
       

 05-19-2008
5.00
I worked on mounting firewall unions for avionics
Details
       

 05-19-2008
5.00
Charlie worked on new firewall plugs from instrume
Details
     

 05-07-2008
0.50
Fine mounting place for oxygen distribution units
Details
     

 05-07-2008
1.00
Fabricate battery box for backup ADI.
Details
       

 05-03-2008
5.00
Complete relocating wires firewall plug p-9-2
Details
       

 05-01-2008
1.00
Work on relocating wires from plug p-9-2.
Details
       

 05-01-2008
1.00
Wire in speed brakes.
Details
     

 05-01-2008
2.50
Continue working on relocating wires from plug p-9
Details
       

 04-30-2008
2.70
Frustrating day with wiring
Details
       

 04-29-2008
6.50
Work on fabricating wiring and plugs, p-1-1,p-1,p-
Details
       

 04-29-2008
0.50
Repair ELT plug and pot plug
Details
     

 04-28-2008
2.50
Install ELT and wiring harness
Details
       

 04-28-2008
3.50
Fabricate ELT wiring harness.
Details
       

 04-24-2008
1.30
Wire air-conditioning system and aircraft to plug
Details
       

 04-24-2008
0.30
Mount xvision ballast in left wing.
Details

 04-24-2008
0.30
Mount speed brake control box.
Details
     

 04-24-2008
1.30
Fabricate it air-conditioning wiring harness
Details
       

 04-23-2008
1.00
Prepared and bond speed brake controller mounts
Details
       

 04-23-2008
0.50
Mount right xvision ballast
Details
     

 04-22-2008
1.00
Prepared and bonded X-vision ballasts
Details
       

 04-22-2008
1.30
Locate and install strobes ballast
Details
       

 04-21-2008
1.00
Locate and mount GTP-59 probe in right naca vent.
Details
       

 04-21-2008
1.30
Install T-cast antenna cables and connect.
Details
     

 04-19-2008
1.50
Assembled copilot stick grip and installed.
Details
       

 04-19-2008
2.50
Assemble pilot stick grip and installed.
Details
       

 04-12-2008
0.50
Install auto trim sensor for pitch.
Details
     

 03-28-2008
0.50
Completed the Faraday cage
Details
       

 03-19-2008
3.00
Fabricated ground plane
Details
       

 03-19-2008
2.00
Fabricate ground plane
Details
     

 03-18-2008
3.30
Fabricated ground planes
Details
       

 03-14-2008
1.70
received instrument panel and unpacked
Details

 02-20-2008
1.70
Fabricated ground plane
Details
       

 02-20-2008
1.00
Fabricate ground plane
Details
       










Copyright © 2001-2024 Matronics. All Rights Reserved.