Date
|
Hours
|
Work Log Summary
|
Details
|
12-07-2008
|
3.00
|
Removed engine cowling found sparkplug
|
Details
|
|
|
12-06-2008
|
3.00
|
Complete wiring GPS1 back in the system
|
Details
|
|
|
12-05-2008
|
2.00
|
Modified GPS antenna mount for magnetometer
|
Details
|
|
|
12-05-2008
|
2.00
|
Fabricated GPS antenna mount
|
Details
|
|
|
12-04-2008
|
3.00
|
Peter from Garmin gave verbal permission to modify
|
Details
|
|
|
12-01-2008
|
4.00
|
A technician from Garmin, Peter. Evaluated
|
Details
|
|
|
11-30-2008
|
3.00
|
Completed flap rewiring.
|
Details
|
|
|
11-30-2008
|
2.00
|
Changed main battery to gel cell
|
Details
|
|
|
11-29-2008
|
4.00
|
Worked on flaps rewiring
|
Details
|
|
|
11-12-2008
|
20.00
|
Two technicians from Aerotronics
|
Details
|
|
|
11-06-2008
|
2.00
|
Connect wing's ground to ground planes.
|
Details
|
|
|
11-06-2008
|
2.50
|
Complete pito & static connections. Tested static
|
Details
|
|
|
11-05-2008
|
1.50
|
Installed taxi and landing lights into the wings
|
Details
|
|
|
11-05-2008
|
1.00
|
Fit assembly pito & static probe to wing
|
Details
|
|
|
11-04-2008
|
3.50
|
Check will taxi and landing lights.
|
Details
|
|
|
11-03-2008
|
4.50
|
Complete wiring connections to panel
|
Details
|
|
|
10-16-2008
|
4.00
|
Worked on diagnosing landing gear sequence valve
|
Details
|
|
|
10-15-2008
|
3.00
|
Worked on troubleshooting landing gear.
|
Details
|
|
|
10-15-2008
|
5.00
|
Worked on flaps commissioning.
|
Details
|
|
|
10-14-2008
|
2.00
|
Wired CHT's & EGT's on left side of engine
|
Details
|
|
|
10-14-2008
|
7.00
|
Put aircraft on Jack's. Worked on commissioning
|
Details
|
|
|
10-13-2008
|
8.00
|
Complete battery wiring. Connected batteries.
|
Details
|
|
|
08-29-2008
|
1.50
|
Fabricate and locate navigation antenna allen wren
|
Details
|
|
|
08-28-2008
|
0.50
|
Fabricate and bond net antenna guide tube into cov
|
Details
|
|
|
08-21-2008
|
0.50
|
Install flap sensor for AOA and flap location.
|
Details
|
|
|
08-21-2008
|
1.00
|
Cleaned up wiring under armrests and pilot and cop
|
Details
|
|
|
08-20-2008
|
2.50
|
Fabricate flap sensors mounts for flap position an
|
Details
|
|
|
08-13-2008
|
2.00
|
Install bonding strap from tail to firewall.
|
Details
|
|
|
08-12-2008
|
0.50
|
Install space served between pitch servo and auto
|
Details
|
|
|
08-12-2008
|
1.50
|
Fabricate microswitch mount for canopy latch annou
|
Details
|
|
|
08-12-2008
|
1.30
|
Complete intercom wiring harness and installed.
|
Details
|
|
|
08-07-2008
|
2.00
|
Complete installation of oxygen fill line and fill
|
Details
|
|
|
08-07-2008
|
2.70
|
Cleaned up wiring runs in tail section
|
Details
|
|
|
08-06-2008
|
5.70
|
Route and install oxygen lines
|
Details
|
|
|
08-06-2008
|
1.50
|
Install oxygen wiring harness into aircraft.
|
Details
|
|
|
08-05-2008
|
0.70
|
Wired tie cables in the tail section.
|
Details
|
|
|
08-05-2008
|
3.50
|
Fabricate oxygen wiring harness with plug p-22-1
|
Details
|
|
|
08-04-2008
|
2.50
|
Completed fabrication of GPS antenna wing tip moun
|
Details
|
|
|
08-04-2008
|
2.50
|
Cleaned up man of antenna penetration on the left
|
Details
|
|
|
08-01-2008
|
3.00
|
Install T-cast antennas and cables
|
Details
|
|
|
07-31-2008
|
2.50
|
Fabricate number 2 com antenna ground plane
|
Details
|
|
|
07-31-2008
|
2.00
|
Fabricate and run navigation antenna cable.
|
Details
|
|
|
07-30-2008
|
3.50
|
Complete wiring mic and phone jacks to plug p-4
|
Details
|
|
|
07-25-2008
|
1.50
|
Fabricates microphone wiring harness plug P-4.
|
Details
|
|
|
07-23-2008
|
2.00
|
Fabricate grounding cables and install on engine a
|
Details
|
|
|
07-22-2008
|
3.00
|
Locate and install auxiliary power plug and wired.
|
Details
|
|
|
06-30-2008
|
2.30
|
Cleaned up navigation antenna mount and cover plat
|
Details
|
|
|
06-25-2008
|
2.00
|
Fabricate navigation antenna side backing plate
|
Details
|
|
|
06-24-2008
|
2.00
|
Locate and mount number 2 com radio antenna.
|
Details
|
|
|
06-06-2008
|
1.00
|
Design bracket for auxiliary plug
|
Details
|
|
|
06-05-2008
|
2.00
|
Wire landing gear hydraulic gear pump Annunciation
|
Details
|
|
|
06-05-2008
|
2.50
|
Wire in ADI backup battery to charging system
|
Details
|
|
|
06-04-2008
|
4.00
|
Completed wiring main battery circuitry.
|
Details
|
|
|
06-03-2008
|
2.50
|
Prepared parts and installed main battery solenoid
|
Details
|
|
|
06-03-2008
|
3.00
|
Fabricated ground bust for cabling in center Counc
|
Details
|
|
|
05-30-2008
|
6.00
|
Worked on cleaning out wiring in center Council
|
Details
|
|
|
05-29-2008
|
3.00
|
Worked on wiring.
|
Details
|
|
|
05-28-2008
|
4.50
|
Cleaned up wiring runs
|
Details
|
|
|
05-24-2008
|
5.00
|
Charlie fabricated plugs for forward of the firewa
|
Details
|
|
|
05-24-2008
|
6.00
|
Both of us, pulled wires into wing roots
|
Details
|
|
|
05-23-2008
|
0.50
|
Locate and Mount Main voltage regulato
|
Details
|
|
|
05-23-2008
|
10.00
|
Charlie worked on aircraft wiring.
|
Details
|
|
|
05-22-2008
|
2.00
|
Moved nut plates from airframe to instrument
|
Details
|
|
|
05-22-2008
|
1.00
|
Locate and bond ADC backup battery
|
Details
|
|
|
05-22-2008
|
0.70
|
Fabricated bracket and mounts for canopy air seal
|
Details
|
|
|
05-22-2008
|
11.50
|
Charlie worked on wiring.
|
Details
|
|
|
05-22-2008
|
0.40
|
Change standby regulator nuts to nut plates.
|
Details
|
|
|
05-21-2008
|
2.00
|
Fabricated and installed through firewall power lu
|
Details
|
|
|
05-21-2008
|
12.50
|
Charlie, fabricate cables and continued electrical
|
Details
|
|
|
05-20-2008
|
1.00
|
Install firewall penetration for ELT's, EGT's, pro
|
Details
|
|
|
05-20-2008
|
11.00
|
Charlie, Worked on instrument panel, firewall plug
|
Details
|
|
|
05-19-2008
|
5.00
|
I worked on mounting firewall unions for avionics
|
Details
|
|
|
05-19-2008
|
5.00
|
Charlie worked on new firewall plugs from instrume
|
Details
|
|
|
05-07-2008
|
0.50
|
Fine mounting place for oxygen distribution units
|
Details
|
|
|
05-07-2008
|
1.00
|
Fabricate battery box for backup ADI.
|
Details
|
|
|
05-03-2008
|
5.00
|
Complete relocating wires firewall plug p-9-2
|
Details
|
|
|
05-01-2008
|
1.00
|
Work on relocating wires from plug p-9-2.
|
Details
|
|
|
05-01-2008
|
1.00
|
Wire in speed brakes.
|
Details
|
|
|
05-01-2008
|
2.50
|
Continue working on relocating wires from plug p-9
|
Details
|
|
|
04-30-2008
|
2.70
|
Frustrating day with wiring
|
Details
|
|
|
04-29-2008
|
6.50
|
Work on fabricating wiring and plugs, p-1-1,p-1,p-
|
Details
|
|
|
04-29-2008
|
0.50
|
Repair ELT plug and pot plug
|
Details
|
|
|
04-28-2008
|
2.50
|
Install ELT and wiring harness
|
Details
|
|
|
04-28-2008
|
3.50
|
Fabricate ELT wiring harness.
|
Details
|
|
|
04-24-2008
|
1.30
|
Wire air-conditioning system and aircraft to plug
|
Details
|
|
|
04-24-2008
|
0.30
|
Mount xvision ballast in left wing.
|
Details
|
|
|
04-24-2008
|
0.30
|
Mount speed brake control box.
|
Details
|
|
|
04-24-2008
|
1.30
|
Fabricate it air-conditioning wiring harness
|
Details
|
|
|
04-23-2008
|
1.00
|
Prepared and bond speed brake controller mounts
|
Details
|
|
|
04-23-2008
|
0.50
|
Mount right xvision ballast
|
Details
|
|
|
04-22-2008
|
1.00
|
Prepared and bonded X-vision ballasts
|
Details
|
|
|
04-22-2008
|
1.30
|
Locate and install strobes ballast
|
Details
|
|
|
04-21-2008
|
1.00
|
Locate and mount GTP-59 probe in right naca vent.
|
Details
|
|
|
04-21-2008
|
1.30
|
Install T-cast antenna cables and connect.
|
Details
|
|
|
04-19-2008
|
1.50
|
Assembled copilot stick grip and installed.
|
Details
|
|
|
04-19-2008
|
2.50
|
Assemble pilot stick grip and installed.
|
Details
|
|
|
04-12-2008
|
0.50
|
Install auto trim sensor for pitch.
|
Details
|
|
|
03-28-2008
|
0.50
|
Completed the Faraday cage
|
Details
|
|
|
03-19-2008
|
3.00
|
Fabricated ground plane
|
Details
|
|
|
03-19-2008
|
2.00
|
Fabricate ground plane
|
Details
|
|
|
03-18-2008
|
3.30
|
Fabricated ground planes
|
Details
|
|
|
03-14-2008
|
1.70
|
received instrument panel and unpacked
|
Details
|
|
|
02-20-2008
|
1.70
|
Fabricated ground plane
|
Details
|
|
|
02-20-2008
|
1.00
|
Fabricate ground plane
|
Details
|
|