KitLog pro

Powered By Kitlog Pro v2.0

Radio Flyer Web Site
Work Logs Found: 59
Category Work Time: 165 Hours
 Date
Hours
Work Log Summary

Details

 11-08-2008
0.30
Second engine start
Details

 11-08-2008
0.20
First engine start.
Details

 11-05-2008
5.00
Mounted propeller.
Details
     

 11-04-2008
2.50
Sand and trim air filter box
Details
       

 10-30-2008
6.00
Assembled elevator. Connected controls and trim ta
Details

 10-24-2008
3.00
Install heat vent hosing on Indian side.
Details
       

 10-24-2008
3.50
Fabricate exhaust pipe mounts.
Details
       

 10-23-2008
1.00
Modified engine air filter housing
Details
       

 07-24-2008
2.00
Locate and cut holes for oxygen distribution heads
Details
       

 07-24-2008
3.00
Clear of obstructions with throttle quadrant
Details
       

 07-23-2008
2.50
Worked on wire cleanup on engine. Looking good!
Details
       

 07-22-2008
2.00
Worked on bundling up engine wiring.
Details
       

 07-22-2008
1.50
Cleanup engine wiring and mount closing loans.
Details
       

 07-21-2008
6.50
Fabricate PSI and engine PSI sensor plugs
Details
       

 07-21-2008
1.00
Fabricate and bond throttle quadrant cable support
Details
     

 07-18-2008
3.50
Locate control pin placements on quadrant
Details
       

 07-18-2008
2.00
Fabricates engine sniffle valve and installed.
Details
       

 07-17-2008
6.50
Installed throttle, mixture, pitch control cables.
Details
       

 07-16-2008
2.00
Worked on engine wiring
Details
       

 07-15-2008
5.50
Work on engine sensor wiring.
Details
       

 07-15-2008
1.00
Complete baffling gasket.
Details
       

 07-14-2008
6.50
Install fuel PSI sensor and drains lines. Install
Details
       

 07-11-2008
6.50
Work on sensor wiring to engine.
Details
       

 07-10-2008
1.50
Route and mount spark plug leads.
Details
       

 07-10-2008
4.00
Install and connect and in wiring mounts shunts.
Details
       

 07-09-2008
5.50
Work on engine assembly, fabricated viton
Details
       

 07-08-2008
1.50
Work on installing fuel lines and drains to the en
Details
     

 07-08-2008
4.00
Work on installing engine sensors, psi, cht's.
Details
       

 07-03-2008
4.00
Work on engine assembly
Details
       

 07-03-2008
3.00
Complete reassembly of engine baffling.
Details
       

 07-02-2008
7.50
Reassemble engine baffling.
Details
       

 06-23-2008
1.00
Fabricate oil lines for remote oil filter and inst
Details
       

 06-23-2008
2.50
Fabricate gas collator drain line
Details
       

 06-19-2008
2.50
Re-fabricate AC compressor baffle fits nicely.
Details
     

 06-19-2008
0.50
Install fuel pump shroud per chapter 26-20.
Details
       

 06-19-2008
3.00
Final inspection of engine baffling and adjust
Details
     

 06-18-2008
2.00
Fabricate baffle for air conditioning compressor.
Details
       

 06-17-2008
1.00
Source V. belt for AC compressor and fit.
Details
     

 06-17-2008
0.50
Install mixture control bracket per chapter 26-24
Details
       

 06-17-2008
1.30
Complete fabrication of AC hose to compressor.
Details
       

 06-14-2008
3.50
Fit oil separator. Purchase parts needed.
Details
       

 06-13-2008
1.00
Locate oil separator and fabricate amount.
Details
       

 06-11-2008
1.00
Mount propeller to engine.
Details
       

 06-11-2008
1.00
Fabricate air conditioning compressor baffling.
Details
       

 06-10-2008
6.00
Worked on assembly of engine baffling modified
Details
     

 06-09-2008
6.50
Worked on assembly of engine baffling.
Details
       

 06-06-2008
2.50
Worked on engine baffling. Fitting and installing.
Details
       

 05-31-2008
5.00
Scott and me, Removed engine and changed oil pans
Details
       

 05-29-2008
3.00
Sandblast new oil pan
Details
     

 05-20-2008
4.00
Assemble and locate remote oil filter system onto
Details
       

 04-28-2008
1.00
Complete fitting air-conditioning compressor
Details
       

 04-24-2008
2.00
Pickup air-conditioning compressor mounts
Details
     

 04-09-2008
3.50
Worked on fitting air-conditioning compressor moun
Details
     

 04-09-2008
0.50
Install auxiliary cover plate on engine
Details
     

 04-07-2008
0.20
change out prop governor
Details
       

 03-25-2008
4.00
Install second alternator
Details
       

 03-23-2008
1.00
Moved aircraft and set engine
Details
       

 02-12-2008
0.50
received engine
Details
     

 01-18-2008
0.50
propeller arrived
Details
     










Copyright © 2001-2024 Matronics. All Rights Reserved.