Date
|
Hours
|
Work Log Summary
|
Details
|
12-20-2008
|
3.00
|
Remeasured for CG and weight and balance.
|
Details
|
|
|
12-12-2008
|
2.50
|
Installed seatbelts.
|
Details
|
|
|
12-12-2008
|
1.50
|
Fabricated control rod for flap indicator
|
Details
|
|
|
12-11-2008
|
6.00
|
Install control cables
|
Details
|
|
|
12-10-2008
|
1.50
|
Released landing light lenses. Cleaned up around e
|
Details
|
|
|
12-10-2008
|
1.50
|
Cleaned up canopy air seal and rebounded in very o
|
Details
|
|
|
12-09-2008
|
1.50
|
Removed right baggage floor flange for backseat
|
Details
|
|
|
12-09-2008
|
1.70
|
Remove landing light lenses. Installed seal
|
Details
|
|
|
12-09-2008
|
1.30
|
Bonded canopy air seal into place per chapter 9.
|
Details
|
|
|
11-28-2008
|
3.00
|
Complete reinstallation of landing gear microswitc
|
Details
|
|
|
11-26-2008
|
5.00
|
Removed landing gear sequence valve assembly
|
Details
|
|
|
11-07-2008
|
4.50
|
Installed all panels and set up for weight and bal
|
Details
|
|
|
11-07-2008
|
2.00
|
Found interference in controls.
|
Details
|
|
|
11-05-2008
|
0.50
|
Assembled backseat covers.
|
Details
|
|
|
11-03-2008
|
3.00
|
Fabricate flap push tubes and installed.
|
Details
|
|
|
11-02-2008
|
3.00
|
Complete assembly of left wing and all connections
|
Details
|
|
|
11-02-2008
|
6.00
|
Assemble right wing onto aircraft.
|
Details
|
|
|
11-01-2008
|
5.00
|
Assembled left wing onto aircraft.
|
Details
|
|
|
10-31-2008
|
90.00
|
Ed carried out bodywork and priming of the fuselag
|
Details
|
|
|
10-28-2008
|
9.50
|
Completed assembly of wings.
|
Details
|
|
|
10-27-2008
|
3.50
|
Work on assembling wing components
|
Details
|
|
|
10-27-2008
|
4.00
|
Complete AOA vents. Installed speed brakes
|
Details
|
|
|
10-27-2008
|
1.00
|
Assembled flap arms.
|
Details
|
|
|
10-24-2008
|
0.50
|
Sand carbon fiber on cowling and engine
|
Details
|
|
|
10-23-2008
|
3.00
|
Sand cowling filler
|
Details
|
|
|
10-23-2008
|
1.00
|
Bonded 2 bids of carbon fiber to hinge pin opening
|
Details
|
|
|
10-22-2008
|
3.00
|
Trim cowling nose
|
Details
|
|
|
10-19-2008
|
3.00
|
Install canopy hinges with new gas springs
|
Details
|
|
|
10-17-2008
|
3.00
|
Align Main landing gear wheels
|
Details
|
|
|
10-07-2008
|
4.00
|
Worked on final assembly of foot well area prepari
|
Details
|
|
|
10-06-2008
|
4.50
|
Worked on final assembly of foot well area.
|
Details
|
|
|
10-04-2008
|
6.50
|
Work on bonding in insulation to firewall and foot
|
Details
|
|
|
10-03-2008
|
1.50
|
Mounted shoulder straps
|
Details
|
|
|
10-03-2008
|
2.00
|
Install throttle quadrant.
|
Details
|
|
|
10-03-2008
|
2.00
|
Cleanup and prepared to bond installation behind i
|
Details
|
|
|
10-02-2008
|
6.50
|
Assembled components and baggage compartment
|
Details
|
|
|
10-01-2008
|
0.70
|
Locate last air-conditioning vent in baggage compa
|
Details
|
|
|
10-01-2008
|
5.30
|
Assembled air conditioning vents. Changed out land
|
Details
|
|
|
09-30-2008
|
2.00
|
Assist Steve with masking off cockpit for touch up
|
Details
|
|
|
09-29-2008
|
4.00
|
Reassembled canopy latching system.
|
Details
|
|
|
09-29-2008
|
1.00
|
Final assembly of head set jacks,
|
Details
|
|
|
09-27-2008
|
2.00
|
Removed paining masking from cockpit and re-mast p
|
Details
|
|
|
09-27-2008
|
20.00
|
Ed and Steve completed preparing cockpit for final
|
Details
|
|
|
09-19-2008
|
7.00
|
Ed primed fuselage and canopy.
|
Details
|
|
|
09-19-2008
|
4.00
|
Balanced elevators and complete balancing ailerons
|
Details
|
|
|
09-18-2008
|
8.00
|
Ed worked on sending canopy and filled
|
Details
|
|
|
09-18-2008
|
2.00
|
Bond and mounted ailerons counterweights per chapt
|
Details
|
|
|
09-17-2008
|
6.00
|
Ed was working on sending the fuselage.
|
Details
|
|
|
09-17-2008
|
3.00
|
Balance ailerons per chapter 6-8
|
Details
|
|
|
09-16-2008
|
1.50
|
Sand and primed elevator and rudder.
|
Details
|
|
|
09-16-2008
|
4.00
|
Assembled ailerons and start the balancing process
|
Details
|
|
|
09-15-2008
|
5.00
|
Sand moving surfaces filler
|
Details
|
|
|
09-13-2008
|
4.00
|
Sand moving services,
|
Details
|
|
|
09-13-2008
|
6.00
|
Sand and prep cockpit and primed.
|
Details
|
|
|
09-12-2008
|
4.00
|
Sand moving surfaces, aileron, elevator, flaps
|
Details
|
|
|
09-12-2008
|
0.70
|
Inspect cockpit paintwork and marked spots
|
Details
|
|
|
09-04-2008
|
1.30
|
Sand center council filler and applied second coat
|
Details
|
|
|
09-04-2008
|
1.50
|
Remove canopy and hardware.
|
Details
|
|
|
09-04-2008
|
1.50
|
Prepared and filled third coat of filler to center
|
Details
|
|
|
09-03-2008
|
3.00
|
Locate air conditioning vent in center console
|
Details
|
|
|
09-03-2008
|
2.70
|
Fit and trim rudder pedal floorboards
|
Details
|
|
|
09-01-2008
|
2.00
|
Sand cowling and canopy
|
Details
|
|
|
09-01-2008
|
0.50
|
Sand carbon fiber bids on an elevator and aileron
|
Details
|
|
|
09-01-2008
|
0.30
|
Cleaned up navigation antenna Alan wrench ports.
|
Details
|
|
|
08-29-2008
|
0.50
|
Sand canopy and cowing and applied third coat of f
|
Details
|
|
|
08-29-2008
|
1.00
|
Sand bonding's of static whip keepers on rudder, e
|
Details
|
|
|
08-29-2008
|
1.00
|
Applied 2 bits of carbon fiber over static whip
|
Details
|
|
|
08-28-2008
|
1.50
|
Sand filler on canopy and cowling.
|
Details
|
|
|
08-28-2008
|
2.00
|
Bond static whip keepers into rudder, aileron, ele
|
Details
|
|
|
08-27-2008
|
3.00
|
Prepare canopy and top cowling by standing and cle
|
Details
|
|
|
08-27-2008
|
2.50
|
Locate and drilled moving surfaces for static wick
|
Details
|
|
|
08-26-2008
|
2.50
|
Remove the top cowing.
|
Details
|
|
|
08-25-2008
|
0.50
|
Removed clamps and cleaned up canopy handles.
|
Details
|
|
|
08-25-2008
|
1.40
|
Prepared and bonded cowling hinge pin keepers into
|
Details
|
|
|
08-25-2008
|
1.30
|
Install latch in the exhilarating power door
|
Details
|
|
|
08-25-2008
|
1.00
|
Install cam locks in cowing
|
Details
|
|
|
08-25-2008
|
1.50
|
Fit lower cowling onto aircraft
|
Details
|
|
|
08-24-2008
|
2.00
|
Remade canopy handle tooling and fabricated two ne
|
Details
|
|
|
08-24-2008
|
1.00
|
Released handles from tooling and trim
|
Details
|
|
|
08-24-2008
|
1.70
|
Fit and bonded canopy handles into place with flox
|
Details
|
|
|
08-22-2008
|
0.50
|
Set up heat lamp on left side of canopy
|
Details
|
|
|
08-22-2008
|
2.00
|
Received exhaust shields
|
Details
|
|
|
08-22-2008
|
1.50
|
Cutout flange for auxiliary power door
|
Details
|
|
|
08-22-2008
|
1.50
|
Bonded 2 bids of carbon fiber over auxiliary power
|
Details
|
|
|
08-21-2008
|
1.30
|
Fit lower Cowling and locate auxiliary plug. Remov
|
Details
|
|
|
08-21-2008
|
1.00
|
Fabricate back flange for auxiliary power door and
|
Details
|
|
|
08-20-2008
|
0.70
|
ut holes for air conditioning vent outlets
|
Details
|
|
|
08-19-2008
|
5.30
|
Cleanup and sand baggage compartment floor hatches
|
Details
|
|
|
08-18-2008
|
3.50
|
Prepared hinge beds for baggage floor hatches
|
Details
|
|
|
08-18-2008
|
1.50
|
Fit in install nut plates for aft baggage compartm
|
Details
|
|
|
08-15-2008
|
1.70
|
Trim and fit seat back panels in baggage compartme
|
Details
|
|
|
08-15-2008
|
2.50
|
Trim and fit baggage compartment floor board hatch
|
Details
|
|
|
08-15-2008
|
0.50
|
Bonded outside mounting tabs for back seat panels
|
Details
|
|
|
08-13-2008
|
2.00
|
rim baggage compartment floors. Fit and back panel
|
Details
|
|
|
08-13-2008
|
1.50
|
Cleaned up top aft tube mount tab by adding flux t
|
Details
|
|
|
08-12-2008
|
1.70
|
Fit and trim baggage compartment floors
|
Details
|
|
|
08-05-2008
|
1.30
|
Install not plates and modify oxygen distribution
|
Details
|
|
|
07-21-2008
|
3.00
|
Trim and fit oxygen and mic jacks channel
|
Details
|
|
|
06-30-2008
|
0.50
|
Released seatback flange and GPS antenna mounts fr
|
Details
|
|
|
06-30-2008
|
2.70
|
Fabricate molds for seatback and GPS
|
Details
|
|
|
06-28-2008
|
0.70
|
Prepared and bonded oil door latch mounting plate
|
Details
|
|
|
06-28-2008
|
0.50
|
Cleaned up navigation antenna cover
|
Details
|
|
|
06-28-2008
|
0.70
|
Cleaned up baggage compartment cable cover mounts
|
Details
|
|
|
06-28-2008
|
0.50
|
Bonded 1 bid of carbon fiber to oil door latch tub
|
Details
|
|
|
06-26-2008
|
1.00
|
Worked on installing oil door latch.
|
Details
|
|
|
06-26-2008
|
1.00
|
Cleaned up top cowling by standing.
|
Details
|
|
|
06-26-2008
|
1.00
|
Cleaned up navigation antenna covered
|
Details
|
|
|
06-25-2008
|
3.00
|
Fabricated cable cover for baggage compartment cei
|
Details
|
|
|
06-25-2008
|
2.00
|
Fabricate oil door and mounting hinge
|
Details
|
|
|
06-25-2008
|
0.70
|
Fabricate navigation antenna cover plate
|
Details
|
|
|
06-25-2008
|
0.70
|
Cleanup top cowling hinge.
|
Details
|
|
|
06-24-2008
|
2.00
|
Release top cowling. Re-bond right side of hinge
|
Details
|
|
|
06-24-2008
|
2.50
|
Fabricate navigation antenna mount
|
Details
|
|
|
06-23-2008
|
2.00
|
Prepared and bonded top counting hinge
|
Details
|
|
|
06-23-2008
|
1.50
|
Prepared and bond top hinge to aircraft for upper
|
Details
|
|
|
06-18-2008
|
1.50
|
Remove cleco from cowling and cleaned up hinges.
|
Details
|
|
|
06-18-2008
|
1.50
|
Install nut plates on nose wheel rails
|
Details
|
|
|
06-18-2008
|
1.00
|
fit top and bottom cowing installed hinge pins
|
Details
|
|
|
06-17-2008
|
3.00
|
Prepared and bonded upper cowling hinge mounts.
|
Details
|
|
|
06-14-2008
|
1.50
|
Prepared and bonded lower cowing hinge mounts with
|
Details
|
|
|
06-14-2008
|
0.70
|
Left firewall cowling hinge failed pull test
|
Details
|
|
|
06-13-2008
|
2.50
|
Prepared and bonded mounting hinges to lower cowli
|
Details
|
|
|
06-13-2008
|
2.00
|
Final fitting of cowling
|
Details
|
|
|
06-12-2008
|
6.00
|
Work on fitting cowling top to bottom
|
Details
|
|
|
06-11-2008
|
1.50
|
Fit bottom cowling to aircraft.
|
Details
|
|
|
05-24-2008
|
5.50
|
Install throttle quadrant and fuel selector linkag
|
Details
|
|
|
05-09-2008
|
0.50
|
Released and cleaned up ADI battery box and head r
|
Details
|
|
|
05-09-2008
|
0.50
|
Cleaned up and sand headsets Jack mounts.
|
Details
|
|
|
05-08-2008
|
2.00
|
Various glasswork.
|
Details
|
|
|
05-08-2008
|
1.00
|
Release parts. Fabricate top for AD
|
Details
|
|
|
05-08-2008
|
1.50
|
Prepared and bond carbon fiber to headrest moun
|
Details
|
|
|
05-07-2008
|
1.00
|
Prepared and bond front section of center console
|
Details
|
|
|
05-07-2008
|
2.00
|
Fabricate mounds for headrests out of carbon fiber
|
Details
|
|
|
05-06-2008
|
0.50
|
Work on main battery mount
|
Details
|
|
|
05-06-2008
|
1.00
|
Used heat lamps to help align
|
Details
|
|
|
04-22-2008
|
2.50
|
Fabricate a left landing light assembly
|
Details
|
|
|
04-18-2008
|
4.00
|
Fabricate air-conditioning hoses
|
Details
|
|
|
04-17-2008
|
3.00
|
Reassemble flight controls
|
Details
|
|
|
04-16-2008
|
0.50
|
Prep and paint holes for AC condenser lines in the
|
Details
|
|
|
04-16-2008
|
1.50
|
Install air conditioning condenser and through hau
|
Details
|
|
|
04-16-2008
|
2.00
|
Fabricated air-conditioning hoses for high and low
|
Details
|
|
|
04-16-2008
|
2.00
|
Fabricate and install air-conditioning dryer mount
|
Details
|
|
|
04-15-2008
|
2.50
|
Fit air conditioning condenser and fabricate hoses
|
Details
|
|
|
04-15-2008
|
1.50
|
Completed wiring in hydraulic pump
|
Details
|
|
|
04-14-2008
|
4.50
|
Wire in landing gear hydraulic pump
|
Details
|
|
|
04-14-2008
|
1.00
|
Fabricated bracket for landing gear airspeed safet
|
Details
|
|
|
04-12-2008
|
4.00
|
Wire leaning gear micro switches into sequencer an
|
Details
|
|
|
04-12-2008
|
3.00
|
Installed landing gear micro switches on right and
|
Details
|
|
|
04-11-2008
|
1.00
|
Install landing gear relays and hydraulic pump.
|
Details
|
|
|
04-11-2008
|
2.00
|
Fabricate micro switches Cabling for landing.
|
Details
|
|
|
04-11-2008
|
3.00
|
Completed wiring flap motor
|
Details
|
|
|
04-09-2008
|
0.50
|
Wire tied tale wire harness
|
Details
|
|
|
04-09-2008
|
1.50
|
Remove flapped drive motor from aircraft
|
Details
|
|
|
04-09-2008
|
0.50
|
Change engine cage upper right bolt to longer bolt
|
Details
|
|
|
04-08-2008
|
3.00
|
Run Rudder taillight, strobe light, and servo cabl
|
Details
|
|
|
04-08-2008
|
1.50
|
Run pitch serval cable and AHRS cables to location
|
Details
|
|
|
04-08-2008
|
0.50
|
redrill baggage compartment bulkhead
|
Details
|
|
|
04-08-2008
|
0.20
|
Prepared and bonded 4 bids of carbon fibe
|
Details
|
|
|
04-08-2008
|
1.00
|
Install poly tubing for rudder tail lights and tri
|
Details
|
|
|
04-07-2008
|
0.50
|
Relocates brake lines to parking brake valve.
|
Details
|
|
|
04-07-2008
|
0.80
|
reinstall nose wheel gas strut and hydraulic cylin
|
Details
|
|
|
04-07-2008
|
1.00
|
Reconfigure fuel pump fittings.
|
Details
|
|
|
04-07-2008
|
1.50
|
Installed Poly-tube conduit
|
Details
|
|
|
04-07-2008
|
0.40
|
Fill two holes in fuselage AC scoop on belly with
|
Details
|
|
|
04-07-2008
|
1.30
|
Fabricate 2 hydraulic lines
|
Details
|
|
|
03-29-2008
|
1.00
|
Installed instrument shelf with panel into aircraf
|
Details
|
|
|
03-28-2008
|
1.00
|
Reinstalled nose gear over center arm
|
Details
|
|
|
03-28-2008
|
0.30
|
reinstalled heat valve
|
Details
|
|
|
03-28-2008
|
0.50
|
Prepared and painted heat control valve.
|
Details
|
|
|
03-28-2008
|
1.00
|
Have the nose wheel over center arm modified
|
Details
|
|
|
03-28-2008
|
1.00
|
Change 45° fittings to straight fittings
|
Details
|
|
|
03-27-2008
|
1.00
|
Modified nose wheel hydraulic cylinder
|
Details
|
|
|
03-27-2008
|
0.50
|
Modified heat valve by remove one outlet
|
Details
|
|
|
03-26-2008
|
1.00
|
Replaced copilot left rudder cable.
|
Details
|
|
|
03-25-2008
|
1.00
|
Fabricate conduit and bonded
|
Details
|
|
|
03-25-2008
|
1.00
|
Clean residue glue off
|
Details
|
|
|
03-25-2008
|
2.00
|
bond in drain tube for air-conditioning evaporator
|
Details
|
|
|
03-23-2008
|
1.00
|
Installed through firewalls
|
Details
|
|
|
03-23-2008
|
1.00
|
Install gas collator
|
Details
|
|
|
03-23-2008
|
3.00
|
Fabricate left nose gear door
|
Details
|
|
|
03-22-2008
|
0.50
|
Release foam molds
|
Details
|
|
|
03-22-2008
|
3.00
|
Fabricated nose gear right door
|
Details
|
|
|
03-22-2008
|
2.50
|
Complete fabrication and installation
|
Details
|
|
|
03-21-2008
|
1.50
|
Prepared in bonded
|
Details
|
|
|
03-21-2008
|
0.50
|
Mixed foam for exhaust
|
Details
|
|
|
03-21-2008
|
3.00
|
Fabricate & installed nose
|
Details
|
|
|
03-21-2008
|
4.00
|
Assembled and installed nose
|
Details
|
|
|
03-21-2008
|
1.00
|
Assemble and installed
|
Details
|
|
|
03-20-2008
|
0.50
|
Sand and prepare bonded 4
|
Details
|
|
|
03-20-2008
|
2.00
|
Prepared in bonded
|
Details
|
|
|
03-20-2008
|
1.70
|
Fabricate Plexiglas sides
|
Details
|
|
|
03-20-2008
|
0.50
|
Applied second coat of mold
|
Details
|
|
|
03-19-2008
|
1.00
|
Prepared and bonded baggage
|
Details
|
|
|
03-18-2008
|
1.30
|
Moved canopy latch spring
|
Details
|
|
|
03-18-2008
|
0.30
|
Install oxygen bottle.
|
Details
|
|
|
03-18-2008
|
1.50
|
Install hydraulic landing gear
|
Details
|
|
|
03-18-2008
|
0.50
|
Fit air-conditioning evaporator.
|
Details
|
|
|
03-17-2008
|
0.70
|
Prepared and bonded 3 bids
|
Details
|
|
|
03-17-2008
|
0.70
|
Installed elevator push rod
|
Details
|
|
|
03-17-2008
|
0.50
|
Assembled flap actuator
|
Details
|
|
|
03-16-2008
|
1.00
|
Install pitch servo
|
Details
|
|
|
03-16-2008
|
1.30
|
Install magnetometer
|
Details
|
|
|
03-16-2008
|
2.00
|
Fabricated oxygen bottle mounting
|
Details
|
|
|
03-15-2008
|
1.00
|
Install parking brake valve
|
Details
|
|
|
03-15-2008
|
3.50
|
ended rudder cables to firewall fasteners.
|
Details
|
|
|
03-14-2008
|
1.50
|
remount rudder pedals
|
Details
|
|
|
03-14-2008
|
0.50
|
release engine cage from firewall
|
Details
|
|
|
03-14-2008
|
0.50
|
pull parts for nose gear assembly.
|
Details
|
|
|
03-14-2008
|
1.00
|
prepared and bonded flame blanket
|
Details
|
|
|
03-14-2008
|
0.70
|
drilled and installed
|
Details
|
|
|
03-13-2008
|
0.70
|
redrilled holes and firewall
|
Details
|
|
|
03-13-2008
|
2.00
|
leveled aircraft and reconfirm firewall placement
|
Details
|
|
|
03-13-2008
|
0.70
|
fabricated mounting bracket
|
Details
|
|
|
03-13-2008
|
1.00
|
bonded shams and filled
|
Details
|
|
|
03-12-2008
|
2.50
|
turned aircraft on side
|
Details
|
|
|
03-12-2008
|
1.00
|
stood aircraft on main landing gear.
|
Details
|
|
|
03-12-2008
|
0.70
|
install rudder petals into aircraft.
|
Details
|
|
|
03-12-2008
|
0.70
|
install last to rudder cables
|
Details
|
|
|
03-12-2008
|
0.70
|
fit condenser to AC scoop
|
Details
|
|
|
03-11-2008
|
3.50
|
chase for parts
|
Details
|
|
|
03-10-2008
|
1.00
|
rotated aircraft up side down
|
Details
|
|
|
03-10-2008
|
2.00
|
rotate aircraft to the up position.
|
Details
|
|
|
03-10-2008
|
1.00
|
prepared outside rudder cable tubes
|
Details
|
|
|
03-09-2008
|
1.00
|
install rudder cable poly tubing
|
Details
|
|
|
03-09-2008
|
2.00
|
fit rudder puddles assemblies
|
Details
|
|
|
03-09-2008
|
1.30
|
fabricate rudder pedals support tube brackets
|
Details
|
|
|
03-08-2008
|
2.70
|
finish instrument shelf fitting
|
Details
|
|
|
03-06-2008
|
0.50
|
sand filler on center consul
|
Details
|
|
|
03-06-2008
|
2.00
|
prepared and fabricate copper screening
|
Details
|
|
|
03-05-2008
|
1.50
|
sanded center console and cockpit
|
Details
|
|
|
03-05-2008
|
1.50
|
released exhaust tunnels splashes
|
Details
|
|
|
03-05-2008
|
0.50
|
reinstalled rotisserie
|
Details
|
|
|
03-05-2008
|
1.00
|
prepared and paint
|
Details
|
|
|
03-05-2008
|
0.50
|
cleaned up exhaust tunnels and fuselage firewall
|
Details
|
|
|
03-04-2008
|
1.00
|
turn aircraft upside down.
|
Details
|
|
|
03-04-2008
|
0.70
|
sand center console filler
|
Details
|
|
|
03-04-2008
|
4.00
|
fabricated wax fillers for exhaust outlets.
|
Details
|
|
|
03-04-2008
|
0.20
|
|
Details
|
|
|
02-29-2008
|
1.50
|
released and the cleanup right window
|
Details
|
|
|
02-29-2008
|
1.30
|
prepared right window hinges
|
Details
|
|
|
02-29-2008
|
0.70
|
fabricated mounting plates for shoulder harness
|
Details
|
|
|
02-28-2008
|
1.00
|
standard center console and right AC vent.
|
Details
|
|
|
02-28-2008
|
0.30
|
sanded and cleanup right AC inlet
|
Details
|
|
|
02-28-2008
|
2.50
|
prepared right rear window frame modification
|
Details
|
|
|
02-28-2008
|
1.30
|
prepared AC inlet tube for right side.
|
Details
|
|
|
02-28-2008
|
1.30
|
bonded 6 bids of carbon fiber to right AC vent
|
Details
|
|
|
02-27-2008
|
0.50
|
sand left AC vent inlet.
|
Details
|
|
|
02-27-2008
|
0.40
|
rotate aircraft to other side
|
Details
|
|
|
02-27-2008
|
2.50
|
prepared and cut right AC vent
|
Details
|
|
|
02-26-2008
|
3.00
|
sand AC vent and center console.
|
Details
|
|
|
02-26-2008
|
2.00
|
prepared left AC vents
|
Details
|
|
|
02-21-2008
|
2.00
|
remove throttle quadrant and fuel selector
|
Details
|
|
|
02-21-2008
|
0.50
|
prepared and bonded 3 bids of e-glass
|
Details
|
|
|
02-21-2008
|
2.00
|
cut in half 2 inch carbon fiber tube.
|
Details
|
|
|
02-21-2008
|
1.50
|
cut 1 3/4 carbon fiber tube for Naca vents.
|
Details
|
|
|
02-20-2008
|
0.70
|
tiedown hydraulic lines in left wheel well and rem
|
Details
|
|
|
02-20-2008
|
0.30
|
rotate aircraft upside down
|
Details
|
|
|
02-20-2008
|
0.40
|
rotate aircraft onto side
|
Details
|
|
|
02-20-2008
|
0.70
|
released canapé lock
|
Details
|
|
|
02-20-2008
|
0.70
|
Moved canopy latch spring
|
Details
|
|
|
02-20-2008
|
1.00
|
drilled and tapped main wheel forks for brake line
|
Details
|
|
|
02-20-2008
|
2.30
|
completed hydraulic connections made
|
Details
|
|
|
02-20-2008
|
1.30
|
complete hydraulic line installation
|
Details
|
|
|
02-20-2008
|
1.00
|
cleaned up and sanded bonding was in the tail sect
|
Details
|
|
|
02-19-2008
|
2.00
|
finish fabricating cockpit lock mount
|
Details
|
|
|
02-19-2008
|
2.50
|
fabricated magnetometer shelf
|
Details
|
|
|
02-19-2008
|
1.00
|
fabricate aft bulkhead per chapter
|
Details
|
|
|
02-19-2008
|
1.00
|
bonded in aft bulkhead
|
Details
|
|
|
02-18-2008
|
2.50
|
prepared and bond center consul
|
Details
|
|
|
02-18-2008
|
1.00
|
prepared and bond center consul
|
Details
|
|
|
02-18-2008
|
1.00
|
level aircraft inspect rudder Bell crank support
|
Details
|
|
|
02-18-2008
|
0.70
|
finished barricading hydraulic hose for gear dump
|
Details
|
|
|
02-18-2008
|
0.50
|
fabricate and bond nut plate cable tubes.
|
Details
|
|
|
02-18-2008
|
0.20
|
drilled hole for throttle quadrant
|
Details
|
|
|
02-18-2008
|
1.50
|
assembled rudder bell crank assembly
|
Details
|
|
|
02-16-2008
|
0.70
|
modified throttle cable bracket
|
Details
|
|
|
02-16-2008
|
1.70
|
installed elevator controls per chapter 19-2,3
|
Details
|
|
|
02-16-2008
|
3.00
|
finished installation of dump valves
|
Details
|
|
|
02-16-2008
|
0.50
|
cut holes for wire runs
|
Details
|
|
|
02-15-2008
|
3.00
|
worked on dear dump valves setup and installation
|
Details
|
|
|
02-15-2008
|
2.00
|
install six 90° hydraulic fittings onto dumb valve
|
Details
|
|
|
02-14-2008
|
0.50
|
tied down all hydraulic and fuel lines in cockpit
|
Details
|
|
|
02-14-2008
|
1.00
|
reconfigure four-way valve fitting
|
Details
|
|
|
02-14-2008
|
2.00
|
changed straight fittings to 45 fittings in left w
|
Details
|
|
|
02-13-2008
|
0.70
|
uncrate engine and put on small palette.
|
Details
|
|
|
02-13-2008
|
0.50
|
fabricated fuel line from selector valve to fuel p
|
Details
|
|
|
02-13-2008
|
1.00
|
fabricated 2 fuel line feeds to fuel selector.
|
Details
|
|
|
02-13-2008
|
1.50
|
complete installation of inner gear door hydraulic
|
Details
|
|
|
02-12-2008
|
1.30
|
worked on hydraulic lines
|
Details
|
|
|
02-12-2008
|
2.70
|
install fittings in sequence manifold block
|
Details
|
|
|
02-09-2008
|
0.30
|
rotate aircraft on side
|
Details
|
|
|
02-09-2008
|
0.50
|
prepared and paint floor in cockpit
|
Details
|
|
|
02-09-2008
|
3.00
|
fits flap torque tube
|
Details
|
|
|
02-09-2008
|
1.00
|
clean up flox around sequence manifold mounts
|
Details
|
|
|
02-08-2008
|
2.00
|
work done fitting throttle quadrant and fuel selec
|
Details
|
|
|
02-08-2008
|
2.30
|
reinstalled gear doors
|
Details
|
|
|
02-08-2008
|
1.00
|
refits landing gear doors
|
Details
|
|
|
02-07-2008
|
2.00
|
right side, installed hydraulic fittings and hoses
|
Details
|
|
|
02-07-2008
|
1.30
|
prepared and bonded tied down studs
|
Details
|
|
|
02-07-2008
|
1.00
|
fabricated holes for fuel selector valve
|
Details
|
|
|
02-07-2008
|
1.50
|
cut slots for throttle quadrant
|
Details
|
|
|
02-05-2008
|
6.00
|
left side, fabricated two aluminum hydraulic lines
|
Details
|
|
|
02-02-2008
|
1.50
|
prepared and painted ac scoop and belly
|
Details
|
|
|
02-02-2008
|
1.50
|
installed center wing hydraulic bulkhead fittings
|
Details
|
|
|
02-02-2008
|
1.00
|
installed center wing hydraulic bulkhead fittings
|
Details
|
|
|
02-01-2008
|
0.70
|
sand inner flap hinge speed mods and filled
|
Details
|
|
|
02-01-2008
|
3.50
|
sand and prepare cockpit floor for paint
|
Details
|
|
|
02-01-2008
|
1.00
|
install ailerons idle arms
|
Details
|
|
|
02-01-2008
|
0.70
|
fabricate eight spacers for ailerons idler arm
|
Details
|
|
|
01-31-2008
|
0.50
|
sand inner flap hinge speed mods
|
Details
|
|
|
01-31-2008
|
2.30
|
installed sequence gear up stops
|
Details
|
|
|
01-30-2008
|
1.00
|
sand air-conditioning scoop and belly filler
|
Details
|
|
|
01-30-2008
|
1.30
|
reinstalls rudder and elevator hinge plates to fus
|
Details
|
|
|
01-30-2008
|
1.00
|
reassembled inner and outer gear doors
|
Details
|
|
|
01-30-2008
|
1.00
|
reassembled in board flap attachment brackets
|
Details
|
|
|
01-29-2008
|
2.00
|
installed right wheel assembly and break
|
Details
|
|
|
01-29-2008
|
2.00
|
installed left wheel assembly and break
|
Details
|
|
|
01-26-2008
|
1.50
|
shimmed gear over center link assembly
|
Details
|
|
|
01-26-2008
|
0.50
|
installed main gear forks
|
Details
|
|
|
01-26-2008
|
1.00
|
assembled right over center link assembly
|
Details
|
|
|
01-26-2008
|
3.00
|
assembled left over center link assembly
|
Details
|
|
|
01-25-2008
|
2.00
|
sand air-conditioning scoop filled area and belly
|
Details
|
|
|
01-25-2008
|
3.50
|
installed main gear struts per chapter 3-14
|
Details
|
|
|
01-25-2008
|
1.00
|
fabricated backing plates for
|
Details
|
|
|
01-24-2008
|
1.50
|
worked on placement of air-conditioning evaporator
|
Details
|
|
|
01-24-2008
|
1.00
|
sanded air-conditioning scoop tapes
|
Details
|
|
|
01-24-2008
|
2.00
|
sanded aft canopy flange and forward cockpit area
|
Details
|
|
|
01-24-2008
|
0.50
|
filled air-conditioning scoop joint with Hysol 960
|
Details
|
|
|
01-23-2008
|
1.50
|
sanded bond joint on new air-conditioning scoop.
|
Details
|
|
|
01-23-2008
|
2.00
|
reinforced aft canopy flange
|
Details
|
|
|
01-23-2008
|
1.70
|
prepared and bonded 2 bids of carbon fiber
|
Details
|
|
|
01-22-2008
|
1.70
|
sand filler on weighing navigation lights
|
Details
|
|
|
01-22-2008
|
0.30
|
rotate fuselage
|
Details
|
|
|
01-22-2008
|
1.50
|
grind and peeled off air-conditioning scoop.
|
Details
|
|
|
01-22-2008
|
1.50
|
finished sanding fuselage bottom
|
Details
|
|
|
01-22-2008
|
1.50
|
bonded new air-conditioning scoop to fuselage
|
Details
|
|
|
01-21-2008
|
1.50
|
prepared and bonded left fuselage speed mod
|
Details
|
|
|
01-19-2008
|
2.00
|
sand then released navigation light lenses
|
Details
|
|
|
01-19-2008
|
1.50
|
prepared wing navigation light moldings
|
Details
|
|
|
01-18-2008
|
1.30
|
remove foam tape from wing navigation light moldin
|
Details
|
|
|
01-18-2008
|
0.50
|
modified other navigation light assembly
|
Details
|
|
|
01-18-2008
|
1.00
|
mast of navigation light lenses
|
Details
|
|
|
01-18-2008
|
3.00
|
fit right wing navigation light lens
|
Details
|
|
|
01-18-2008
|
1.50
|
fit left wing navigation light lens
|
Details
|
|
|
01-17-2008
|
2.30
|
start laying out valve bodies for sequencer
|
Details
|
|
|
01-17-2008
|
1.80
|
sand winglets, wing navigation lights and NACA ven
|
Details
|
|
|
01-17-2008
|
1.00
|
prepared wing fuel drain fairings for flox insi
|
Details
|
|
|
01-17-2008
|
1.30
|
prepared and bonded wings flap hinge speed modific
|
Details
|
|
|
01-16-2008
|
1.00
|
sand winglets and wing lights
|
Details
|
|
|
01-16-2008
|
0.40
|
sand filler on servo fairings
|
Details
|
|
|
01-16-2008
|
2.30
|
removed wings and finished sanding winglets
|
Details
|
|
|
01-16-2008
|
0.60
|
filled wing lights, winglets, and servo fairings
|
Details
|
|
|
01-16-2008
|
2.50
|
fabricated autopilot role and pitch brackets
|
Details
|
|
|
01-15-2008
|
2.30
|
sand winglets and an opening for weighing light mo
|
Details
|
|
|
01-15-2008
|
1.50
|
sand and fill serval fairings on moving services
|
Details
|
|
|
01-15-2008
|
2.50
|
finish fabricating wingtip light molding
|
Details
|
|
|
01-15-2008
|
1.50
|
final trim and shape of NACA vents
|
Details
|
|
|
01-15-2008
|
0.30
|
fabricate carbon fiber tube for canopy lock assemb
|
Details
|
|
|
01-12-2008
|
1.50
|
sanded winglet joints and applied carbon fiber
|
Details
|
|
|
01-12-2008
|
1.30
|
prepared and bonded servo fairings
|
Details
|
|
|
01-12-2008
|
3.50
|
prepared and bonded left and right winglets
|
Details
|
|
|
01-11-2008
|
3.00
|
prepared and cut open left wing tip
|
Details
|
|
|
01-11-2008
|
4.00
|
prep right wing tip for winglet
|
Details
|
|
|
01-10-2008
|
1.30
|
sand NACA vents and applied second coat of filler
|
Details
|
|
|
01-10-2008
|
2.50
|
prepared and cut hole in right wing tip
|
Details
|
|
|
01-09-2008
|
0.50
|
sand left NACA vent
|
Details
|
|
|
01-09-2008
|
1.00
|
sand and prepared left NACA vent
|
Details
|
|
|
01-09-2008
|
2.00
|
install wings and level aircraft.
|
Details
|
|
|
01-09-2008
|
0.50
|
filled right and left NACA vent
|
Details
|
|
|
01-09-2008
|
2.50
|
fabricated and attached hardware to right landing
|
Details
|
|
|
01-08-2008
|
2.30
|
sand NACA vents. Found problem
|
Details
|
|
|
01-08-2008
|
1.30
|
prepared and cut whole for right landing light
|
Details
|
|
|
01-08-2008
|
1.00
|
fit center console and fuel selector valve
|
Details
|
|
|
01-06-2008
|
3.00
|
sprayed final color into wheel wells
|
Details
|
|
|
01-06-2008
|
4.00
|
sand, prepared and mast off
|
Details
|
|
|
01-05-2008
|
0.70
|
trim and sand carbon fiber on Jack inserts
|
Details
|
|
|
01-05-2008
|
2.00
|
prep wheel wells and tail gaps for primer
|
Details
|
|
|
01-04-2008
|
3.50
|
finish fabricating NACA vents
|
Details
|
|
|
01-04-2008
|
2.50
|
fabricated and bonded carbon fiber conduit
|
Details
|
|
|
01-04-2008
|
0.50
|
applied six bids a carbon fiber to Jack points
|
Details
|
|
|
01-03-2008
|
1.00
|
trim and fit NACA vent wings
|
Details
|
|
|
01-03-2008
|
1.70
|
sand tail gaps and fuselage
|
Details
|
|
|
01-03-2008
|
0.50
|
remove rudder and elevator hinge plates
|
Details
|
|
|
01-03-2008
|
1.30
|
prepared and paint primer on to topside of fuselag
|
Details
|
|
|
01-03-2008
|
0.70
|
countersunk 3/8" female fittings into center wing
|
Details
|
|
|
01-02-2008
|
6.50
|
sand gear bay's and bottom of fuselage
|
Details
|
|
|
01-01-2008
|
0.70
|
remove landing gear doors
|
Details
|
|
|
01-01-2008
|
3.00
|
complete hardware removal, prepared left gear bay
|
Details
|
|
|
12-29-2007
|
2.00
|
worked on inter-gear doors fit
|
Details
|
|
|
12-29-2007
|
1.00
|
assembled inside gear door hydraulic cylinder
|
Details
|
|
|
12-27-2007
|
4.50
|
installed nut plates for inside main gear doors
|
Details
|
|
|
12-20-2007
|
0.70
|
released and trim nacro wing vents
|
Details
|
|
|
12-20-2007
|
1.00
|
prepared for installing insight gear doors to fuse
|
Details
|
|
|
12-20-2007
|
1.50
|
prepared and bonded 3 bids of carbon fiber
|
Details
|
|
|
12-20-2007
|
3.50
|
fabricated and installed hardware on inside to you
|
Details
|
|
|
12-19-2007
|
1.50
|
sand filler on fuselage underbody
|
Details
|
|
|
12-19-2007
|
1.50
|
inspected bond of receptacle supports
|
Details
|
|
|
12-19-2007
|
1.50
|
fabricated mold for nacro vents
|
Details
|
|
|
12-18-2007
|
2.50
|
sand fuselage underbody at all filler points.
|
Details
|
|
|
12-18-2007
|
2.00
|
install outboard gear door attachments
|
Details
|
|
|
12-18-2007
|
0.70
|
fabricate for receptacle supports
|
Details
|
|
|
12-18-2007
|
1.00
|
applied filler on a fuselage underbody
|
Details
|
|
|
12-15-2007
|
3.70
|
sand bottom of fuselage at all filler points
|
Details
|
|
|
12-15-2007
|
1.00
|
prepare and bonded fuel drain fairing
|
Details
|
|
|
12-15-2007
|
1.00
|
applied filler to bottom of fuselage
|
Details
|
|
|
12-14-2007
|
1.50
|
sand landing gear doors and bays
|
Details
|
|
|
12-14-2007
|
2.00
|
sand fuselage underside
|
Details
|
|
|
12-14-2007
|
0.50
|
release landing gear doors
|
Details
|
|
|
12-14-2007
|
2.30
|
filled around AC-scoop, landing gear doors and fla
|
Details
|
|
|
12-13-2007
|
2.30
|
sand flap fillers and cavities
|
Details
|
|
|
12-13-2007
|
1.50
|
sand and prepare AC scoop
|
Details
|
|
|
12-13-2007
|
1.50
|
fill flange for a landing gear doors
|
Details
|
|
|
12-12-2007
|
2.00
|
sand flaps gap fillers.
|
Details
|
|
|
12-12-2007
|
2.00
|
prepared and bonded AC condenser scoop
|
Details
|
|
|
12-12-2007
|
1.30
|
applied 1 bid of carbon fiber to flap gap fillers
|
Details
|
|
|
12-11-2007
|
0.70
|
sand rudder tail light assembly
|
Details
|
|
|
12-11-2007
|
2.50
|
removed canopy and turned over fuselage
|
Details
|
|
|
12-11-2007
|
2.30
|
fabricated flaps gap fillers and bonded
|
Details
|
|
|
12-08-2007
|
1.00
|
trim and sand taillight faring
|
Details
|
|
|
12-08-2007
|
2.00
|
sand canopy and fuselage filler
|
Details
|
|
|
12-08-2007
|
1.50
|
released canopy from fuselage
|
Details
|
|
|
12-08-2007
|
0.70
|
prepared and installed rudder trim servo
|
Details
|
|
|
12-08-2007
|
0.30
|
fill around rudder tail light assembly
|
Details
|
|
|
12-07-2007
|
0.50
|
sand taillight assembly on rudder
|
Details
|
|
|
12-07-2007
|
4.00
|
sand canopy and fuselage filler
|
Details
|
|
|
12-07-2007
|
0.50
|
remove masking tape from rudder access panels
|
Details
|
|
|
12-07-2007
|
1.50
|
apply second coat of filler around canopy
|
Details
|
|
|
12-06-2007
|
2.00
|
prepared in bonded taillight to the rudder with fl
|
Details
|
|
|
12-06-2007
|
1.00
|
filled canopy gap with foam tape
|
Details
|
|
|
12-06-2007
|
1.30
|
filled canopy and fuselage joint with Hysol 960F
|
Details
|
|
|
12-06-2007
|
1.50
|
filled around elevator access panel
|
Details
|
|
|
12-06-2007
|
1.50
|
fabricated and installed elevator weldment access
|
Details
|
|
|
12-05-2007
|
0.50
|
set up heat lamps and clamped left side of canopy
|
Details
|
|
|
12-05-2007
|
1.50
|
sand canopy and flange worked on fitting
|
Details
|
|
|
12-05-2007
|
1.00
|
sand and filled landing gear doors
|
Details
|
|
|
12-05-2007
|
0.50
|
remove heat lamps from canopy left side.
|
Details
|
|
|
12-05-2007
|
1.50
|
installed and adjusted canopy striker plates
|
Details
|
|
|
12-04-2007
|
1.00
|
sand canopy handle filler and carbon firer bids
|
Details
|
|
|
12-04-2007
|
1.50
|
sand canopy fuselage flange and installed canopy
|
Details
|
|
|
12-04-2007
|
5.00
|
fabricated and installed canopy latch mechanism
|
Details
|
|
|
12-01-2007
|
0.90
|
sand and prepare canopy latch collet and block
|
Details
|
|
|
12-01-2007
|
0.50
|
released canopy handle from the filler
|
Details
|
|
|
12-01-2007
|
1.50
|
filled area around canopy handle
|
Details
|
|
|
11-30-2007
|
2.50
|
stand canopy frame
|
Details
|
|
|
11-30-2007
|
1.30
|
installed canopy on alignment mechanism
|
Details
|
|
|
11-30-2007
|
0.70
|
drill holes for canopy defrost
|
Details
|
|
|
11-30-2007
|
1.50
|
assembled canopy handle and installed
|
Details
|
|
|
11-30-2007
|
1.50
|
align bearing block
|
Details
|
|
|
11-29-2007
|
4.50
|
more sanding! On fuselage speed mods
|
Details
|
|
|
11-28-2007
|
2.30
|
sand filler on the left fuselage speed mod
|
Details
|
|
|
11-28-2007
|
1.00
|
sand filler on right fuselage speed mod
|
Details
|
|
|
11-28-2007
|
0.70
|
filled right and left fuselage speed mods
|
Details
|
|
|
11-27-2007
|
1.50
|
stand right fuselage speed mod
|
Details
|
|
|
11-27-2007
|
1.30
|
sand left fuselage speed mod
|
Details
|
|
|
11-27-2007
|
0.70
|
removed wings
|
Details
|
|
|
11-27-2007
|
0.50
|
removed canopy
|
Details
|
|
|
11-27-2007
|
1.00
|
filled right and left fuselage speed mods
|
Details
|
|
|
11-27-2007
|
0.70
|
filled holes in canopy
|
Details
|
|
|
11-23-2007
|
1.00
|
sand right wing speed mod and fuselage
|
Details
|
|
|
11-23-2007
|
1.30
|
Sand left-wing speed mod and fuselage
|
Details
|
|
|
11-23-2007
|
2.00
|
applied 2 bids of carbon fiber to fuselage speed m
|
Details
|
|
|
11-21-2007
|
2.00
|
sand and prepared wing speed mods for filler
|
Details
|
|
|
11-21-2007
|
1.30
|
prepared and bonded right fuselage speed mod
|
Details
|
|
|
11-21-2007
|
1.50
|
prepared and bonded left fuselage speed mod
|
Details
|
|
|
11-21-2007
|
1.00
|
applied filler around wing speed mods
|
Details
|
|
|
11-20-2007
|
1.30
|
prepared and installed right wing speed mod
|
Details
|
|
|
11-07-2007
|
0.50
|
removed weight and clecos
|
Details
|
|
|
11-07-2007
|
2.30
|
prepared and installed left wing speed mod
|
Details
|
|
|
11-07-2007
|
1.30
|
prepared and bonded 2 bids to right wing
|
Details
|
|
|
11-07-2007
|
0.80
|
prepared and bond right flap trailing edge
|
Details
|
|
|
11-07-2007
|
0.60
|
lowered and leveled aircraft
|
Details
|
|
|
11-06-2007
|
1.50
|
prepared in installed right center wing skin
|
Details
|
|
|
11-06-2007
|
1.00
|
completion of reinstallation of right flap
|
Details
|
|
|
11-06-2007
|
1.00
|
bond left wing trailing edge
|
Details
|
|
|
11-05-2007
|
1.70
|
worked on right flap
|
Details
|
|
|
11-05-2007
|
1.50
|
sand and prepared juggles on left of center wing
|
Details
|
|
|
11-05-2007
|
0.50
|
removed weights and Cletego from left-center warni
|
Details
|
|
|
11-05-2007
|
0.50
|
removed outside flapped hinge arm
|
Details
|
|
|
11-05-2007
|
0.50
|
measured flaps hinge placement.
|
Details
|
|
|
11-02-2007
|
0.50
|
right flap fitting problem.
|
Details
|
|
|
11-02-2007
|
2.70
|
paired and closed out left center wing.
|
Details
|
|
|
11-02-2007
|
1.50
|
fit right aileron
|
Details
|
|
|
11-02-2007
|
1.50
|
fit left aileron
|
Details
|
|
|
11-01-2007
|
1.00
|
installed left flap
|
Details
|
|
|
11-01-2007
|
0.50
|
installed ailerons
|
Details
|
|
|
10-31-2007
|
1.00
|
sand flap drive mount and applied six bids
|
Details
|
|
|
10-31-2007
|
3.00
|
prepared and installed right flap
|
Details
|
|
|
10-30-2007
|
0.50
|
sand cockpit area
|
Details
|
|
|
10-30-2007
|
1.00
|
mounted wings for fitting flaps and ailerons
|
Details
|
|
|
10-30-2007
|
1.50
|
fabricate flap motor attachment plate
|
Details
|
|
|
10-30-2007
|
0.50
|
bond seatbelt reinforcement
|
Details
|
|
|
10-25-2007
|
4.00
|
sand cockpit area and fill vertical ribs
|
Details
|
|
|
10-25-2007
|
1.00
|
sand baggage compartment and hydraulic pump mount
|
Details
|
|
|
10-24-2007
|
1.50
|
prepped and installed hydraulic pump mount.
|
Details
|
|
|
10-24-2007
|
1.00
|
modified part for hydraulic pump mount
|
Details
|
|
|
10-24-2007
|
1.50
|
installed control tube access covers and fitted.
|
Details
|
|
|
10-23-2007
|
1.50
|
fits floorboards and installed access panel
|
Details
|
|
|
10-23-2007
|
1.30
|
complete fabrication of fuel selector valve mount
|
Details
|
|
|
10-21-2007
|
1.50
|
sand seat back and winning center section leading
|
Details
|
|
|
10-21-2007
|
0.50
|
sand filler on the tail section on top
|
Details
|
|
|
10-21-2007
|
1.50
|
prep and install outboard seat supports
|
Details
|
|
|
10-20-2007
|
0.60
|
attached three bids to front side of seatback
|
Details
|
|
|
10-15-2007
|
1.00
|
sand tail section and rudder
|
Details
|
|
|
10-15-2007
|
0.90
|
sand and prep seatback for reinforcement bids
|
Details
|
|
|
10-15-2007
|
1.50
|
sand and prep leading edge center wing applied 2 b
|
Details
|
|
|
10-15-2007
|
1.10
|
sand and prep aft closeout rid left side.
|
Details
|
|
|
10-12-2007
|
2.00
|
sand and filled center section and rudder
|
Details
|
|
|
10-12-2007
|
1.10
|
prepared and installed right closeout rib
|
Details
|
|
|
10-12-2007
|
1.50
|
cut openings to center wing section and applied to
|
Details
|
|
|
10-08-2007
|
1.50
|
sand rudder and belly section
|
Details
|
|
|
10-08-2007
|
2.00
|
first fit of landing gear doors
|
Details
|
|
|
10-08-2007
|
1.00
|
filled belly section and rudder
|
Details
|
|
|
10-07-2007
|
1.50
|
turned over fuselage to work on
|
Details
|
|
|
10-07-2007
|
0.40
|
sand top of fuselage for filler
|
Details
|
|
|
10-07-2007
|
0.30
|
mixed filler for top of fuselage
|
Details
|
|
|
10-07-2007
|
0.50
|
installed two bids of tape aft center wing section
|
Details
|
|
|
10-07-2007
|
0.50
|
filled rudder
|
Details
|
|
|
10-05-2007
|
8.00
|
attached rudder and elevator
|
Details
|
|
|
10-04-2007
|
4.50
|
fit trim tabs
|
Details
|
|
|
10-02-2007
|
5.50
|
fit elevators and sand rudder
|
Details
|
|
|
10-01-2007
|
2.50
|
sand rudder and closed out
|
Details
|
|
|
09-29-2007
|
1.00
|
sanded tail and applied 2 bids
|
Details
|
|
|
09-29-2007
|
1.50
|
sand rudder
|
Details
|
|
|
09-29-2007
|
1.50
|
filled elevator
|
Details
|
|
|
09-29-2007
|
1.00
|
applied two bids to a right elevator
|
Details
|
|
|
09-28-2007
|
4.00
|
sand horizontal and vertical stabilizers
|
Details
|
|
|
09-28-2007
|
0.50
|
filled horizontal stabilizer
|
Details
|
|
|
09-26-2007
|
3.00
|
reset up measurements as described by factory
|
Details
|
|
|
09-26-2007
|
1.00
|
filed and sanded horizontal stabilizer
|
Details
|
|
|
09-25-2007
|
0.00
|
checked wing incidents
|
Details
|
|
|
09-25-2007
|
3.00
|
checked horizontal incidents
|
Details
|
|
|
09-21-2007
|
3.00
|
started verification of measurements.
|
Details
|
|
|
09-21-2007
|
1.20
|
installed speed mods on horizontal stabilizer
|
Details
|
|
|
09-18-2007
|
8.00
|
inventory the kit
|
Details
|
|
|
09-16-2007
|
6.00
|
kit arrives and unpacked Perret
|
Details
|
|
|
03-26-2004
|
0.00
|
fit center console
|
Details
|
|
|
03-25-2004
|
0.00
|
installed canopy hinges
|
Details
|
|
|
03-24-2004
|
0.00
|
fit and bond canopy glass
|
Details
|
|
|
03-23-2004
|
0.00
|
fit and glued canopy stiffener
|
Details
|
|
|
03-22-2004
|
0.00
|
closed vertical and cut rudder away
|
Details
|
|
|
03-19-2004
|
0.00
|
bonds center section
|
Details
|
|
|
03-18-2004
|
0.00
|
applied closeout bid tapes to horizontal and fit c
|
Details
|
|
|
03-17-2004
|
0.00
|
close horizontal stabilizer and elevators
|
Details
|
|