Date
|
Hours
|
Work Log Summary
|
Details
|
12-19-2009
|
1.00
|
Secure Right Baffle Cylinder Fin Wraps
|
Details
|
|
|
12-19-2009
|
1.00
|
Secure Left Baffle Cylinder Fin Wraps
|
Details
|
|
|
12-19-2009
|
1.00
|
Replace Lower Oil Cooler Fitting with 45
|
Details
|
|
|
12-19-2009
|
1.00
|
Install and Safety Wire Oil Cooler Support Rod
|
Details
|
|
|
12-07-2009
|
1.00
|
Reinstall Baffles and Oil Cooler
|
Details
|
|
|
12-05-2009
|
0.50
|
Install Baffle Material with Screws
|
Details
|
|
|
12-04-2009
|
1.00
|
Install Baffle Material with Screws
|
Details
|
|
|
12-01-2009
|
2.00
|
Remove Baffles and Drill Out Pop Rivets
|
Details
|
|
|
12-01-2009
|
0.50
|
Drill Hex Oil Cooler Brace for Safety Wire
|
Details
|
|
|
11-30-2009
|
1.00
|
Replace Pop Rivets with Screws - Left Front
|
Details
|
|
|
10-06-2009
|
2.00
|
Trim, Punch, Drill, Rivet Final Airseal Strips - F
|
Details
|
|
|
09-19-2009
|
0.50
|
Trim & Punch Right Front Airseal Fabric Strip
|
Details
|
|
|
09-19-2009
|
0.50
|
Trim & Punch Left Front Airseal Fabric Strip
|
Details
|
|
|
09-09-2009
|
0.50
|
Trim & Punch Left Side (Middle) Airseal Fabric Str
|
Details
|
|
|
09-09-2009
|
0.50
|
Rivet Airseal Fabric to Left Side (Middle) Baffle
|
Details
|
|
|
09-09-2009
|
0.25
|
Reinstall Top Cowl; Check Baffle Contours - Right
|
Details
|
|
|
09-09-2009
|
0.25
|
Reinstall Top Cowl; Check Baffle Contours - Left
|
Details
|
|
|
09-09-2009
|
0.00
|
Photo Op: Front Baffles Marked for Final Trimming
|
Details
|
|
|
09-09-2009
|
0.50
|
Mark Front Baffles for Further Trimming
|
Details
|
|
|
09-09-2009
|
1.00
|
Install Right Side (Middle) Airseal Strip
|
Details
|
|
|
09-09-2009
|
1.00
|
Install Right Side (Front) Airseal Strip
|
Details
|
|
|
09-09-2009
|
1.00
|
Install Left Side (Front) Airseal Strip
|
Details
|
|
|
09-09-2009
|
1.50
|
Final Trim Front Baffles
|
Details
|
|
|
08-31-2009
|
0.50
|
Trim & Punch Right Side (Aft) Airseal Fabric Strip
|
Details
|
|
|
08-31-2009
|
0.50
|
Rivet Airseal Fabric to Right Side (Aft) Baffle
|
Details
|
|
|
08-28-2009
|
0.50
|
Trim & Punch Left Side (Aft) Airseal Fabric Strip
|
Details
|
|
|
08-28-2009
|
0.50
|
Trim & Punch Left Aft Airseal Fabric Strip
|
Details
|
|
|
08-28-2009
|
0.50
|
Rivet Airseal Fabric to Left Side (Aft) Baffle
|
Details
|
|
|
08-28-2009
|
0.50
|
Rivet Airseal Fabric to Left Aft Baffle
|
Details
|
|
|
08-27-2009
|
1.00
|
Trim & Punch Right Aft Airseal Fabric Strip
|
Details
|
|
|
08-27-2009
|
0.50
|
Rivet Airseal Fabric to Right Aft Baffle
|
Details
|
|
|
08-27-2009
|
0.25
|
Install Mag Cooling Blast Tubes
|
Details
|
|
|
08-27-2009
|
0.50
|
Install Cover Plate/Airseal Fab over Manifold Pres
|
Details
|
|
|
08-27-2009
|
1.00
|
Final Install Right Baffles; Fab Manifold Cover Pl
|
Details
|
|
|
08-27-2009
|
0.25
|
Bolt Baffles to Center Braces; Add Oil Cooler Brac
|
Details
|
|
|
08-26-2009
|
1.50
|
Final Install Left Baffles & Oil Cooler
|
Details
|
|
|
08-25-2009
|
0.50
|
Final Rivet Front Baffles - Cyl Fin Wrap Plates
|
Details
|
|
|
08-25-2009
|
1.00
|
Final Rivet Back Baffles - Cyl Fin Wrap Plates
|
Details
|
|
|
05-12-2009
|
1.00
|
Fabricate Oil Cooler Support Brackets / Rod
|
Details
|
|
|
05-11-2009
|
2.00
|
Final Trim Back Left Baffles; Reinf Flanges; Cap
|
Details
|
|
|
05-11-2009
|
1.00
|
Fabricate and Drill Retention Clips
|
Details
|
|
|
05-05-2009
|
3.00
|
Final Trim Front Baffles; Reinf Flanges
|
Details
|
|
|
05-04-2009
|
2.00
|
Final Trim Right Aft Corner Baffles; Reinf Screw H
|
Details
|
|
|
05-03-2009
|
1.00
|
Remaining Baffles - Mark Top Edges for Final Trim
|
Details
|
|
|
05-03-2009
|
0.25
|
Install Lower Cowl
|
Details
|
|
|
05-03-2009
|
0.50
|
Front Baffles - Mark Top Edges for Final Trim
|
Details
|
|
|
05-03-2009
|
0.25
|
Drill Mounting Holes for Harness Grommets
|
Details
|
|
|
05-03-2009
|
0.25
|
Drill Hole For Alternator Blast Tube
|
Details
|
|
|
05-03-2009
|
0.50
|
Connect the Dots to Mark the Final Trim Lines
|
Details
|
|
|
04-04-2009
|
0.75
|
Parts 5&6 - Cutouts for Harness, Blast Tube
|
Details
|
|
|
04-04-2009
|
1.00
|
Part 7 - Cutouts for Cabin Heat, Harness, Blast Tu
|
Details
|
|
|
04-04-2009
|
0.25
|
Match Drill Cabin Heat Inlet Flange to Part 7
|
Details
|
|
|
03-17-2009
|
1.00
|
Trim, Drill, Debur, Bolt Part 12 to Engine & Parts
|
Details
|
|
|
03-16-2009
|
1.00
|
Rivet Part 7 to Part 8 Reinforcement Angles
|
Details
|
|
|
03-16-2009
|
1.00
|
Cut Flanges Off Part 8; Fabricate Angle Replacemen
|
Details
|
|
|
03-16-2009
|
1.00
|
Countersink, Debur, Alodine, Rivet Angles to Part
|
Details
|
|
|
02-25-2009
|
1.00
|
Install Parts 4,5&6, Clamp and Drill 5&6 Together
|
Details
|
|
|
02-25-2009
|
1.00
|
Countersink, Debur, Clean, Alodine Rivet Parts 5&6
|
Details
|
|
|
02-24-2009
|
1.00
|
Bend, Drill, Debur, Alodine, Install Part 15
|
Details
|
|
|
02-23-2009
|
0.50
|
Rivet Mounting Spacer to Part 6
|
Details
|
|
|
02-23-2009
|
0.50
|
Install Part 6 on Engine
|
Details
|
|
|
02-23-2009
|
1.00
|
Fabricate Mounting Spacer for Part 6
|
Details
|
|
|
01-19-2009
|
1.00
|
Install Parts 4&5 and Oil Cooler
|
Details
|
|
|
01-19-2009
|
1.00
|
Debur, Clean, Alodine, Rivet Parts 4&5
|
Details
|
|
|
01-19-2009
|
0.50
|
Cut Flange Off Part 8; Fabricate Angle Instead
|
Details
|
|
|
01-19-2009
|
0.50
|
Countersink Parts 4 and 5
|
Details
|
|
|
01-18-2009
|
0.50
|
Match Drill Parts 4 & 5 & Reinforcement Components
|
Details
|
|
|
01-18-2009
|
1.00
|
Fabricate and Drill Part 4 Brace Angle / Spacer
|
Details
|
|
|
01-18-2009
|
0.50
|
Drill Oil Cooler Mounting Holes in Aft Baffle/Doub
|
Details
|
|
|
01-18-2009
|
1.00
|
Align Drill Parts 4 & 5 & Reinforcement Components
|
Details
|
|
|
01-17-2009
|
0.25
|
Trim Top of #3 Baffle; Install Cowl
|
Details
|
|
|
01-17-2009
|
0.25
|
Trial Fit Cowl Halves - Edges Line Up Nicely
|
Details
|
|
|
01-17-2009
|
2.00
|
Position & Drill FF-709 Oil Cooler Doubler to Part
|
Details
|
|
|
01-17-2009
|
1.25
|
Mark 3/8" Down From Top of Paper Clips & Trim
|
Details
|
|
|
01-17-2009
|
0.25
|
Install Paper Clips on Top Edges of Baffles
|
Details
|
|
|
01-13-2009
|
0.50
|
Third Iteration of Trimming Top Bulkhead Edges
|
Details
|
|
|
01-13-2009
|
0.50
|
Second Iteration of Trimming Top Bulkhead Edges
|
Details
|
|
|
01-13-2009
|
0.50
|
Mark Front of Left Side Baffle for Trimming
|
Details
|
|
|
01-12-2009
|
1.00
|
Trim New Left Aft Baffle Parts 4 & 5
|
Details
|
|
|
01-12-2009
|
1.00
|
First Iteration of Trimming Top Bulkhead Edges
|
Details
|
|
|
01-10-2009
|
0.50
|
Trim/Fabricate Part 13 - Left Inlet Floor Support
|
Details
|
|
|
01-10-2009
|
0.50
|
Rivet Right Inlet Components
|
Details
|
|
|
01-10-2009
|
0.50
|
Rivet Part 13 Left Inlet Floor Support to Baffles
|
Details
|
|
|
01-10-2009
|
0.50
|
Rivet Left Inlet Components
|
Details
|
|
|
01-10-2009
|
0.50
|
Pre Drill F1A&B to Left Inlet Floor and Bulkhead
|
Details
|
|
|
01-10-2009
|
0.50
|
Pre Drill F11A&B to Right Inlet Floor and Bulkhead
|
Details
|
|
|
01-10-2009
|
0.50
|
Install Right Front Inlet Corner Assembly
|
Details
|
|
|
01-10-2009
|
0.50
|
Install Left Front Inlet Corner Assembly
|
Details
|
|
|
01-10-2009
|
0.50
|
Final Drill Reinf Brackets to Inlet Floors/Bulkhea
|
Details
|
|
|
01-10-2009
|
0.50
|
Debur, Clean, Alodine All Inlet Components
|
Details
|
|
|
01-10-2009
|
0.50
|
Bend Right Inlet Reinforcement Angles - F11A&B
|
Details
|
|
|
01-09-2009
|
0.50
|
Trim Right Front Bulkhead - Lower to Inlet Floor
|
Details
|
|
|
01-09-2009
|
0.50
|
Trim Left Front Bulkhead - Lower to Inlet Floor
|
Details
|
|
|
01-09-2009
|
0.00
|
Initial fitting of Front Bulkheads - Parts 1 & 11
|
Details
|
|
|
01-09-2009
|
0.00
|
Front Bulkheads Lowered to Inlet Floors
|
Details
|
|
|
01-09-2009
|
0.50
|
Fabricate Front Bulkhead Angles - F1A&B, F11A&B
|
Details
|
|
|
01-08-2009
|
0.00
|
Oil Cooler Mounted Too High - Need to Redo
|
Details
|
|
|
01-08-2009
|
5.00
|
5 Iterations of Trimming Top Edges of Baffles
|
Details
|
|
|
01-07-2009
|
0.50
|
Trim Front/Top of Part 9 Side Baffle for Top Cowl
|
Details
|
|
|
01-07-2009
|
0.50
|
Trim Front/Top of Part 3 Side Baffle for Top Cowl
|
Details
|
|
|
01-07-2009
|
0.50
|
Temp Install Right Inlet Baffle and Lower Cowl
|
Details
|
|
|
01-07-2009
|
1.00
|
Rivet Right Inlet Floor - Parts 9, 10, and 10S
|
Details
|
|
|
01-07-2009
|
0.50
|
Install Lower Cowl, Then Upper Cowl; Mark Baffles
|
Details
|
|
|
01-07-2009
|
2.00
|
3 Iterations of Trimming Top Edges of Baffles
|
Details
|
|
|
01-05-2009
|
0.50
|
Temp Install Parts 9&10 - Right Inlet
|
Details
|
|
|
01-05-2009
|
2.00
|
Fabricate Part 10S Reinf Angle; Drill to Right Inl
|
Details
|
|
|
01-05-2009
|
0.50
|
Bend Parts 9&10 - Right Inlet Floor / Baffle
|
Details
|
|
|
12-20-2008
|
1.00
|
Rivet Left Intake Parts 2, 2S, and 3
|
Details
|
|
|
12-20-2008
|
0.50
|
Intall Left Intake Baffles on Engine - Parts 2&3
|
Details
|
|
|
12-20-2008
|
1.50
|
Fabricate Part 2S Angle - Drill to Parts 2 & 3
|
Details
|
|
|
11-08-2008
|
1.00
|
Make Bends in Left Intake Parts 2 & 3
|
Details
|
|
|
09-27-2008
|
0.50
|
Rivet Right Inlet Floor Parts - 10, 10R, 16
|
Details
|
|
|
09-27-2008
|
0.50
|
Install Right Inlet Floor on Engine - Part 10
|
Details
|
|
|
09-25-2008
|
0.50
|
Match Drill Part 10R to Part 10 - Right Inlet Floo
|
Details
|
|
|
09-25-2008
|
0.50
|
Drill Part 2 - Left Inlet Floor to Parts 2R and 14
|
Details
|
|
|
09-25-2008
|
0.50
|
Drill Part 16 Bracket to Right Inlet Floor
|
Details
|
|
|
09-25-2008
|
0.50
|
Debur, Alodine, Rivet Parts 2, 2R, 14 - Left Inlet
|
Details
|
|
|
09-24-2008
|
1.00
|
Fabricate Part 2R Reinf Angle for Left Inlet Floor
|
Details
|
|
|
09-23-2008
|
1.00
|
Rivet R7F Reinf Plate to Part 7 - Right Aft Baffle
|
Details
|
|
|
09-23-2008
|
1.00
|
Install Part 7 on Engine - Right Aft Baffle
|
Details
|
|
|
09-22-2008
|
0.50
|
Trim Part 6 Baffle; Remove Oil Filler Tube
|
Details
|
|
|
09-22-2008
|
0.50
|
Rivet Reinforcement Angle to Part 8
|
Details
|
|
|
09-22-2008
|
1.00
|
Fabricate Diagonal Support Angle for Part 8
|
Details
|
|
|
09-20-2008
|
0.50
|
Install Left Aft Corner Baffles/Oil Cooler on Engi
|
Details
|
|
|
09-20-2008
|
0.50
|
Bolt Oil Cooler to Baffles
|
Details
|
|
|
09-20-2008
|
1.00
|
Acetone, Alodine, Rivet Parts 4&5 - Oil Cooler
|
Details
|
|
|
09-17-2008
|
2.00
|
Final Trim and Debur Oil Cooler Baffle Components
|
Details
|
|
|
09-16-2008
|
1.50
|
Cutout Part 5 for Oil Cooler; Countersink 4&5
|
Details
|
|
|
09-14-2008
|
1.50
|
Fit and Drill Oil Cooler to Baffles
|
Details
|
|
|
09-14-2008
|
1.50
|
Drill / Debur Oil Cooler Baffle Parts (4&5)
|
Details
|
|
|
07-25-2008
|
1.00
|
Fabricate 6 Spacers for Oil Cooler Bolts
|
Details
|
|
|
03-10-2008
|
1.00
|
Part 9: Front Right Side Baffle - Drill & Rivet Re
|
Details
|
|
|
03-10-2008
|
1.00
|
Part 8: Back Right Side Baffle - Drill & Rivet Rei
|
Details
|
|
|
03-03-2008
|
1.00
|
Part 3: Front Left Baffle - Drill and Rivet Reinf
|
Details
|
|