Powered By Kitlog Pro v2.0
RV-10 by Nick Nyenhuis jr.
RV-10
Horizontal Stab
Work Logs Found:
28
Category Work Time:
73 Hours
Date
Hours
Work Log Summary
Details
03-12-2011
2.60
Installed the rear spar on HS
03-18-2009
0.30
Replaced some rivets on horizontal stab skins
03-18-2009
2.20
Hung up horizontal stab in garage
03-14-2009
6.00
Riveted horizontal stab skin on
Details
03-13-2009
5.20
Riveted the horizontal stab frame together
Details
01-20-2009
2.00
HS skin dimpling
01-19-2009
5.60
HS skin dimpling and prepping
01-17-2009
4.90
Prepping elevator parts
01-17-2009
0.30
HS skin prep
01-08-2009
0.50
Fix nose rib edge distance
Details
01-07-2009
1.00
Riveting stringers to center web
01-05-2009
1.80
Countersinking HS spars 2
01-03-2009
1.00
Countersinking HS spars
01-02-2009
5.70
Deburring and dimpling
01-01-2009
2.30
Riveting the front spar doubler
01-01-2009
1.30
Making HS cradles
01-01-2009
4.80
clecoing the guts of the horizontal stabilizer 2
01-01-2009
1.10
clecoing the guts of the horizontal stabilizer
01-01-2009
1.00
Assembling the inspar and nose ribs on front spar
12-31-2008
3.00
HS riveting the rear spar assembly
12-31-2008
4.20
Front spar assermbling
12-30-2008
1.50
HS parts prepping and painting
12-30-2008
1.00
HS nose rib holes
Details
12-29-2008
3.00
HS Parts prepping
12-29-2008
4.90
Deburring and modifying HS stuff
Details
12-27-2008
3.50
HS Riveting the elevator bearing and start of HS d
06-27-2008
0.50
Straighted HS-906
06-26-2008
1.50
Spar Attchment Brackets
Details
SITE NAVIGATION
Contact Builder
RV-10 Home
Category
# Logs
# Hours
All
535
1769
Administration
1
2
Ailerons
15
51
Brakes and Wheels
7
21
Control System
18
64
Electrical
22
69
Elevators
34
116
Empennage Misc
8
19
Flaps
21
84
Fuel System
9
23
Fuel Tanks
37
137
Fuselage
164
580
Horizontal Stab
28
73
Miscellaneous
9
28
Panel
2
6
Rudder
19
46
Shop/Tools
21
39
Tailcone
32
109
Vertical Stab
13
37
Wings
75
265
Copyright © 2001-2024 Matronics. All Rights Reserved.