Date
|
Hours
|
Work Log Summary
|
Details
|
11-15-2010
|
4.00
|
Bled brakes again, worked on PAP tasks.
|
Details
|
|
|
11-11-2010
|
5.00
|
Filled brake system. Observed air bubbles.
|
Details
|
|
|
10-22-2010
|
2.00
|
Installed placards.
|
Details
|
|
|
10-21-2010
|
2.50
|
Finished data cable, installed tunnel cover.
|
Details
|
|
|
10-20-2010
|
4.00
|
Installed seats, began work on data cable.
|
Details
|
|
|
10-19-2010
|
5.00
|
Worked on miscellaneous finish items.
|
Details
|
|
|
10-16-2010
|
5.00
|
Sanded final skim coat of epoxy.
|
Details
|
|
|
10-15-2010
|
6.00
|
Coated fiberglass, installed pump noise filter.
|
Details
|
|
|
10-01-2010
|
6.00
|
Finished tail cone fitting.
|
Details
|
|
|
09-23-2010
|
6.00
|
Worked on fitting the tail cone.
|
Details
|
|
|
06-30-2010
|
8.00
|
Cowling, exhaust, cooling.
|
Details
|
|
|
06-29-2010
|
8.00
|
Installed cowl hinges.
|
Details
|
|
|
06-27-2010
|
2.00
|
Worked on cowl fit.
|
Details
|
|
|
06-26-2010
|
2.00
|
Worked on lower cowl fit.
|
Details
|
|
|
06-25-2010
|
2.00
|
Retorqued engine bolts, worked on cowling.
|
Details
|
|
|
06-19-2010
|
4.00
|
Mounted prop, worked fiberglass.
|
Details
|
|
|
05-23-2010
|
2.00
|
Met with Rob, worked the fiberglass.
|
Details
|
|
|
05-21-2010
|
2.00
|
Tested avionics and trim.
|
Details
|
|
|
05-14-2010
|
4.00
|
Finished right wing lighting, worked fiberglass.
|
Details
|
|
|
05-13-2010
|
4.00
|
Worked fiberglass parts, finished FWF inventory.
|
Details
|
|
|
05-12-2010
|
6.00
|
Worked fiberglass, started FWF inventory.
|
Details
|
|
|
05-03-2010
|
3.00
|
Worked on the cowling fiberglass.
|
Details
|
|
|
04-20-2010
|
5.00
|
Finished gas pipe, worked glass, started light kit
|
Details
|
|
|
04-18-2010
|
5.00
|
Flaperon controls, gas tank, baggage area.
|
Details
|
|
|
04-14-2010
|
2.50
|
Cleaned fiberglass, inventoried lighting kit.
|
Details
|
|
|
04-11-2010
|
2.50
|
Installed wings, drilled flaperon torque tubes.
|
Details
|
|
|
04-10-2010
|
2.00
|
Attached flaperons to wings
|
Details
|
|
|
04-08-2010
|
2.00
|
Finished rear window and side skins.
|
Details
|
|
|
04-06-2010
|
4.00
|
Reorganized for remaining pre-engine tasks.
|
Details
|
|
|
04-03-2010
|
2.00
|
Primed & painted parts.
|
Details
|
|
|
03-31-2010
|
1.50
|
Worked on tailcone & cowl hinges.
|
Details
|
|
|
03-30-2010
|
5.50
|
Worked on cowl hinges and tail cone.
|
Details
|
|
|
03-28-2010
|
2.50
|
Assembled oil door.
|
Details
|
|
|
03-21-2010
|
6.00
|
Worked on hinges and pins, cowling parts.
|
Details
|
|
|
03-20-2010
|
6.00
|
Finished prepping fiberglass pieces.
|
Details
|
|
|
03-17-2010
|
3.50
|
Worked cowling halves toward scribe lines.
|
Details
|
|
|
03-13-2010
|
2.00
|
Selected parts & cowling pieces, started prepping.
|
Details
|
|
|
02-27-2010
|
4.00
|
Finished gear/brake install, worked on canopy.
|
Details
|
|
|
02-24-2010
|
4.00
|
Avionics part II, brakes, canopy.
|
Details
|
|
|
02-21-2010
|
7.00
|
Finished landing gear, worked on canopy.
|
Details
|
|
|
02-20-2010
|
3.00
|
Removed canopy, installed compass sensor.
|
Details
|
|
|
02-20-2010
|
4.00
|
Main landing gear install.
|
Details
|
|
|
02-19-2010
|
3.00
|
Prepped nosegear and compass for tomorrow.
|
Details
|
|
|
02-17-2010
|
5.50
|
More sanding & filling, parts prep.
|
Details
|
|
|
02-16-2010
|
3.50
|
More filling, parts prep.
|
Details
|
|
|
02-15-2010
|
6.00
|
Sanding and more sanding.
|
Details
|
|
|
02-11-2010
|
6.00
|
Finished layup, assembled wheels.
|
Details
|
|
|
02-10-2010
|
6.50
|
Completed side fiberglass layups.
|
Details
|
|
|
02-08-2010
|
3.00
|
More sanding and patching.
|
Details
|
|
|
02-07-2010
|
2.50
|
Sanded foam blocks and plexiglass.
|
Details
|
|
|
02-05-2010
|
5.00
|
Cut out fiberglass, glued foam blocks.
|
Details
|
|
|
02-04-2010
|
3.50
|
Reworked canopy skirts.
|
Details
|
|
|
02-03-2010
|
3.50
|
Started on fiberglass fairing.
|
Details
|
|
|
02-02-2010
|
0.00
|
Reworked guide blocks.
|
Details
|
|
|
02-01-2010
|
5.00
|
Worked on canopy and latching mechanism.
|
Details
|
|
|
01-31-2010
|
4.00
|
Screwed bubble to frame.
|
Details
|
|
|
01-30-2010
|
5.00
|
Drilled side skirts, finished all canopy holes.
|
Details
|
|
|
01-29-2010
|
6.50
|
Final (I hope) trimmed and finished the canopy.
|
Details
|
|
|
01-28-2010
|
5.00
|
Canopy drilling - OMG!
|
Details
|
|
|
01-23-2010
|
6.00
|
Started canopy fitting process.
|
Details
|
|
|
01-09-2010
|
2.00
|
Corrected offset countersink, worked small parts.
|
Details
|
|
|
01-07-2010
|
3.00
|
Marked bow, experimented with plexiglass.
|
Details
|
|
|
01-06-2010
|
3.00
|
Started canopy fitting.
|
Details
|
|
|
01-04-2010
|
3.00
|
Prepped and primed canopy frame.
|
Details
|
|
|
01-01-2010
|
5.00
|
Worked on canopy frame.
|
Details
|
|
|
12-31-2009
|
2.00
|
Started canopy work.
|
Details
|
|
|
12-30-2009
|
3.00
|
Loose ends, airframe upright, started canopy.
|
Details
|
|
|
12-29-2009
|
5.00
|
Finished roughing in control cables
|
Details
|
|
|
12-28-2009
|
7.00
|
Completed wiring, started control cables.
|
Details
|
|
|
12-20-2009
|
0.00
|
Planning
|
Details
|
|
|
12-19-2009
|
4.00
|
Completed flap handle mechanism.
|
Details
|
|
|
12-18-2009
|
7.00
|
Installed control linkages & AP servos.
|
Details
|
|
|
12-16-2009
|
6.00
|
Worked on AP and flight controls.
|
Details
|
|
|
12-15-2009
|
3.00
|
Received the autopilot kit and started install.
|
Details
|
|
|
12-11-2009
|
3.00
|
Continued work on controls.
|
Details
|
|
|
12-10-2009
|
4.00
|
Prepped parts, started flap controls.
|
Details
|
|
|
12-08-2009
|
6.50
|
Installed sticks & pedals, finished most wiring.
|
Details
|
|
|
12-07-2009
|
5.50
|
Tank test, wiring, control sticks.
|
Details
|
|
|
12-01-2009
|
4.00
|
Finished tank - for now.
|
Details
|
|
|
11-30-2009
|
2.00
|
Spar pins & reed switch wiring.
|
Details
|
|
|
11-29-2009
|
3.00
|
Worked on fuel tank.
|
Details
|
|
|
11-28-2009
|
7.00
|
Spar pins, reed switches, wiring, OAT probe.
|
Details
|
|
|
11-27-2009
|
6.00
|
More work on tank, went back to wiring.
|
Details
|
|
|
11-26-2009
|
3.00
|
Continued tank work.
|
Details
|
|
|
11-25-2009
|
3.00
|
Assembled/sealed about half of the tank.
|
Details
|
|
|
11-24-2009
|
3.00
|
Finished prepping for tank assembly.
|
Details
|
|
|
11-23-2009
|
3.00
|
Prep work on tank parts.
|
Details
|
|
|
11-19-2009
|
5.00
|
Started wiring section.
|
Details
|
|
|
11-18-2009
|
5.00
|
Finished inventory, started tank.
|
Details
|
|
|
11-16-2009
|
6.50
|
Inventoried small parts.
|
Details
|
|
|
11-14-2009
|
3.00
|
Started finish kit inventory, honored Jack.
|
Details
|
|
|
11-13-2009
|
1.00
|
Unloaded finish kit crate.
|
Details
|
|
|
06-21-2009
|
4.00
|
Repaired mixer assembly, prepped parts.
|
Details
|
|