Powered By Kitlog Pro v2.0
Eds Vans RV-6A/7A Web Site
RV-6A
Fuselage
Work Logs Found:
59
Category Work Time:
0 Hours
Date
Hours
Work Log Summary
Details
01-01-2016
0.00
Fuseelage Construction
Details
10-08-2015
0.00
Trim instrument panel and fit in cockpit.
Details
10-07-2015
0.00
New Instrument fabrication.
Details
10-06-2015
0.00
Test fit new forward top match drilled skin.
Details
10-05-2015
0.00
Match drill new top skin through old top skin.
Details
10-04-2015
0.00
Remove instr. panel attach angles and side wings.
Details
10-03-2015
0.00
Top damaged kin, side wings and inst panel angls.
Details
10-02-2015
0.00
Evaluate fuselage top skin damage.
Details
10-01-2015
0.00
New removable aft tie down bolt inserted.
Details
09-18-2015
0.00
New aft bulkhead, fitted, drilled and clecoed.
Details
09-17-2015
0.00
Fit new aft bulkhead, aft deck, elevator stop.
Details
09-16-2015
0.00
New elevator stop, new horizontal spar attach bar.
Details
09-15-2015
0.00
Replane Aft Bulkhead and Aft Deck.
Details
08-03-2015
0.00
Rivet aft access hole cover attach brackets.
Details
08-02-2015
0.00
Prep and rehearse for riveting the aft skins.
Details
08-01-2015
0.00
Acid wash/prime the aft side skins.
Details
07-26-2015
0.00
Dimple and acid wash aft bottom skin.
Details
07-25-2015
0.00
Trim curve of aft side skin with die grinder.
Details
07-24-2015
0.00
Match drill skin interection from inside out.
Details
07-23-2015
0.00
Match drill intersection on side and bottom skin.
Details
07-22-2015
0.00
Test fit all 3 new aft skins.
Details
07-21-2015
0.00
Create tabs on forward edge of aft side skins.
Details
07-20-2015
0.00
Mark and trim aft bottom skin.
Details
07-19-2015
0.00
Replace forward spar attach angle.
Details
07-18-2015
0.00
First test fit of the aft side skins.
Details
07-17-2015
0.00
Test fitting the new stringers.
Details
07-16-2015
0.00
Replace and match drill 4 stringers.
Details
07-15-2015
0.00
Fit aft bottom skin after drilling and dimpling.
Details
07-10-2015
0.00
Match drill aft inspection cover hole, 2
Details
07-09-2015
0.00
Match drill aft inspection cover hole, 1
Details
07-08-2015
0.00
Hammer and Dolly forward side skins flat
Details
07-07-2015
0.00
Attempt and hammer and dolly side stringers
Details
07-06-2015
0.00
Hammer and Dolly tools from a master
Details
07-05-2015
0.00
Damaged forward side ribs
Details
07-04-2015
0.00
Test fit new aft side skines.
Details
07-03-2015
0.00
Deblue and fit new bottom skin
Details
07-02-2015
0.00
Match drill new bottom skin through old skin
Details
07-01-2015
0.00
Line up old and new bottom skin for match drill
Details
06-07-2015
0.00
Fitting new pitch servo rib
Details
06-06-2015
0.00
Old pitch servo rib along side the new rib
Details
06-05-2015
0.00
Close up of the pitch servo brackets
Details
06-04-2015
0.00
preferred rivet pulling out tools
Details
06-03-2015
0.00
Drill out rivets on aft skin inspection brackets
Details
06-02-2015
0.00
Old wrinkled aft skin elevator inspection holes
Details
06-01-2015
0.00
Damaged stringers under aft skins
Details
05-10-2015
0.00
Part of forward skins removed
Details
05-09-2015
0.00
Seat belt attach points / damaged center rib
Details
05-08-2015
0.00
Internals at the aft end
Details
05-07-2015
0.00
Stringer and center rib damage reviled
Details
05-06-2015
0.00
Aft 3 skins removed
Details
05-05-2015
0.00
Damaged intersection areas
Details
05-04-2015
0.00
Remove aft side skins
Details
05-03-2015
0.00
Drill out 725 rivets
Details
05-02-2015
0.00
Fuselage jig at forward end
Details
05-01-2015
0.00
Fuselage jig at aft end
Details
04-06-2015
0.00
Asses fuselage damage
Details
04-05-2015
0.00
Roll the Canoe.
Details
04-04-2015
0.00
Fuselage Rotisserie Take 2.
Details
04-03-2015
0.00
Fuselage Rotisserie Take 1.
Details
SITE NAVIGATION
Contact Builder
Aerolite 103 Home
RV-6A Home
Category
# Logs
# Hours
All
148
0
Empennage
24
Engine
2
Fuselage
59
Miscellaneous
52
RV-6A Transport
10
Tools
1
RV-7A Home
Copyright © 2001-2024 Matronics. All Rights Reserved.