Powered By Kitlog Pro v2.0
Mikes RANS S-19 Project
S-19 Venterra
Vertical Stabilizer
Work Logs Found:
23
Category Work Time:
36 Hours
Date
Hours
Work Log Summary
Details
05-19-2009
0.00
Finished Vertical Stabilizer!
Details
05-14-2009
0.50
Riveted the Tip Fairing to the VS
Details
05-14-2009
0.50
Fabricated VS Tip Fairing
Details
04-10-2009
2.00
Added Shims to VS Forward Rib #5
Details
04-06-2009
1.50
Riveted VS Skins to VS Frame
Details
03-28-2009
5.00
Fitted Forward Skin Over Forward Ribs
Details
03-27-2009
1.00
Prepare to Install Forward Skin
Details
03-25-2009
1.00
Added Additional VS Skin Stiffener
Details
03-23-2009
1.50
Clecoed Side Skins to Frame
Details
03-16-2009
0.50
Clecoed VS Skin Stiffeners to Skins
Details
03-15-2009
0.25
VS Skin Stiffeners--Fluting
Details
03-15-2009
0.75
Fabricated Vertical Stabilizer Skin Stiffeners
Details
01-01-2009
0.25
Verify VS Frame is Flat With Table
Details
01-01-2009
0.50
Verify Ribs Are Flat
Details
01-01-2009
0.25
Mark Rib Centerlines
Details
12-30-2008
2.00
Completed Vertical Stabilizer Frame
Details
12-29-2008
1.00
Vertical Stabilizer Side Skins
Details
12-27-2008
2.00
Continued Work on Rear Spar
Details
12-26-2008
4.00
Rear Spar Assembly
Details
12-21-2008
2.00
Riveted Front Spar Assembly
Details
12-20-2008
2.00
Primed the Front Spar Parts
Details
10-18-2008
3.00
Continued Front Spar Assembly
Details
10-17-2008
4.00
Assembled Front Spar Assembly
Details
SITE NAVIGATION
Contact Builder
S-19 Venterra Home
Category
# Logs
# Hours
All
104
128
Empennage
3
2
Reference Materials
1
Rudder
24
33
Stabilator
51
57
Tools
1
Vertical Stabilizer
23
36
Worktable
1
Copyright © 2001-2024 Matronics. All Rights Reserved.