KitLog pro

Powered By Kitlog Pro v2.0

Kurt Haller RV-9A
Work Logs Found: 199
Category Work Time: 965 Hours
 Date
Hours
Work Log Summary

Details

 01-01-2019
3.00
Flaps up limit switch
Details
       

 09-23-2018
2.00
New QB flap; awful pitot/static leaks confirmation
Details
       

 09-09-2018
2.50
Rebuilt aileron--complete
Details
       

 09-02-2018
5.00
Continue right aileron re-build
Details
       

 08-31-2018
8.30
Aileron rebuild
Details
       

 08-26-2018
2.50
Deskinned right aileron
Details
       

 02-25-2018
2.30
Reclose wingtips; seat hinges
Details
       

 02-17-2018
9.00
Seat cushion test; Wing tips; Emp fairing
Details
       

 01-21-2018
5.00
Flap rods completed; port root fariing; battery dr
Details
       

 01-15-2018
0.00
Fixing a mistake
Details
       

 01-14-2018
13.80
Wings 'n things
Details
       

 01-07-2018
0.00
Installed flaps; replaced left wing gnd hardware
Details
       

 01-01-2018
7.00
Aileron linkages complete; nav/strobe wiring
Details
       

 12-31-2017
8.50
Ailerons rigged, and other stuff
Details
       

 12-29-2017
0.00
Wing bolts all installed and torqued.
Details
       

 12-26-2017
40.00
Wings on, second and last time
Details

 12-25-2017
8.00
Split wing tips rejoined
Details
       

 12-16-2017
6.10
Undoing right tip overtrim; splitting left tip tra
Details
       

 12-10-2017
3.50
Left wingtip strips and nutplates; lens fit to rig
Details

 12-09-2017
6.00
Floxing reinforcement strips to the right wingtip
Details
       

 12-08-2017
6.00
Wing tip reinforcing strips
Details
       

 12-04-2017
0.00
Wingtip fit up; oil door
Details
     

 12-03-2017
4.20
Fit wingtips
Details
       

 12-02-2017
3.00
Nav/Strobe light mounts
Details

 11-25-2017
6.00
Wing root nutplates. Stnlss rod for elevator trim
Details

 11-23-2017
0.00
Wings unplugged (hung hangar lights too).
Details

 11-22-2017
2.00
Cut the sticks to length! (Consult, measure for l
Details
     

 11-18-2017
3.00
Flaps rigged (Emp fairing; battery minding)
Details

 11-11-2017
4.30
Flap rig preliminaries. (Also emp fairing; txpndr
Details

 09-04-2017
13.00
Wing root fairings; tank attach brackets
Details
       

 08-27-2017
0.00
Set incidence and drill rear spar
Details
       

 08-26-2017
0.00
Leveled dihedral, sweep and triangulation
Details
       

 08-24-2017
0.00
Initial sweep check
Details
       

 08-22-2017
3.10
Wings on!
Details
     

 09-26-2011
3.00
Moving day for the Emp and Wings!
Details
       

 09-24-2011
5.00
Mount elevators, elevator locks
Details

 09-23-2011
9.00
Aircraft "carrier"
Details

 09-22-2011
3.20
Aircraft "carrier"
Details

 09-21-2011
4.30
Mounted left aileron; pitot mast plate riveting
Details

 09-19-2011
9.50
Left wing bottom skins; aileron tweak; elevator sp
Details

 09-16-2011
4.40
Install, align left aileron
Details

 09-15-2011
2.00
Install left aileron
Details

 09-14-2011
5.40
Pushrods; Right wing bottom inboard skin
Details
       

 09-13-2011
7.90
Primed aileron push-rods
Details

 09-12-2011
2.00
Prep left wing for bottom skin riveting
Details
       

 09-12-2011
6.10
Pitot/AOA tubing; finished right wing riveting
Details
       

 09-10-2011
0.00
More home-brew pitot photos
Details
       

 07-05-2011
40.00
Pitot tube
Details
       

 05-21-2011
3.70
Right wing outboard bottom skin
Details

 05-15-2011
2.00
Rivet right wing bottom inboard skin
Details

 05-14-2011
3.30
Right wing bottom skins
Details

 04-24-2011
2.00
Deepen the tie-down bracket tapped holes
Details

 04-11-2011
1.00
Pitot tube mast
Details

 04-09-2011
5.50
Pitot tube mast
Details

 04-07-2011
2.10
Pitot tube mast
Details

 03-27-2011
5.00
Right wing ready for close; AOA line for left wing
Details

 03-16-2011
0.10
Torq-sealed aileron bell-crank bolts
Details

 03-13-2011
4.00
Finish landing/taxi light wiring
Details
       

 02-27-2011
6.00
Wing wiring/aileron bellcrank bolts
Details
       

 02-26-2011
4.00
Wing wires LNDG/TAXI and Pitot
Details

 12-11-2010
6.40
Homebrew pitot tube mast
Details
       

 01-06-2010
8.00
Wing cradle and a long interregnum
Details

 02-22-2009
3.30
Finished right wing top skins
Details

 02-17-2009
6.50
Right wing top skin and fairings
Details

 02-16-2009
4.50
Rivet right wing top skins
Details

 02-07-2009
0.50
Loctite flap rod-end bearings
Details

 01-10-2009
6.50
Finish right flap; fit right wing fairings
Details

 01-03-2009
6.30
Left flap TE, Start right flap
Details

 01-02-2009
4.00
Rivet left flap top and bottom skins
Details

 01-01-2009
7.00
Rivet flap top skins
Details

 12-31-2008
7.20
Finish L flap repair; rivet top skin to R flap
Details

 12-30-2008
7.00
Assemble flap skeletons
Details

 12-29-2008
5.20
Prime flap parts; prep right wing top skins
Details

 12-29-2008
4.30
Prep flap parts for primer
Details

 12-28-2008
8.80
Flaps: Csk trail edge AEX; debur/polish edges
Details

 12-27-2008
8.70
Csk Flap spars
Details

 09-21-2008
8.10
Deburr/dimple all flap components
Details

 09-06-2008
4.50
Flaps--completed match drilling
Details

 09-05-2008
3.30
Left flap nose skins, TE
Details
     

 09-02-2008
6.50
Flaps
Details
       

 05-29-2008
4.00
Left Wing Gap Fairings
Details
       

 05-26-2008
6.50
Left Wing: wiring conduit; gap fairings
Details

 05-25-2008
5.50
Riveting top wing skins
Details

 05-10-2008
3.00
Riveting top skons to left wing
Details
       

 04-26-2008
3.00
Left wing top skin rivets
Details

 03-02-2008
4.00
Level right wing
Details

 03-01-2008
4.80
Right tank: attached to leading edge
Details

 02-22-2008
1.30
Left tank: Washers for z-bracket oversize bolts
Details
       

 02-22-2008
2.00
Left tank: attached to LE
Details
       

 02-20-2008
3.50
Left tank: install floating nutplates (part II)
Details
       

 02-20-2008
3.50
Left tank: install floating nutplates (Part I)
Details
       

 12-02-2007
6.30
Right landing lens / left tank
Details

 11-24-2007
6.50
Left wing landing light lens
Details

 11-23-2007
8.16
Landing light lenses
Details
       

 11-11-2007
2.00
Landing light brackets
Details
       

 11-11-2007
2.00
"Move" light hole in right wing-II
Details
       

 11-11-2007
2.50
"Move" light hole in right wing-I
Details
       

 11-10-2007
4.30
Right aileron/Lndng-taxi lghts/Ovsz bolts
Details
       

 11-04-2007
4.00
Right aileron TE
Details

 11-03-2007
5.00
Right aileron / Design left tank repair
Details
     

 10-29-2007
3.00
Right aileron
Details

 10-28-2007
7.83
Right tank leak and fit test/right aileron
Details

 10-27-2007
2.75
Right tank
Details

 10-20-2007
0.00
Leak test / flap brackets
Details
       

 10-20-2007
7.00
Final spar csnks, mate left tank to spar
Details

 10-19-2007
3.33
Leak test left tank / finish flap angle fab
Details
       

 10-18-2007
1.50
Flap brackets
Details

 10-17-2007
5.00
Right tank coverplate / start fabbing flap compone
Details

 10-16-2007
5.00
Close right tank
Details

 10-15-2007
5.00
Order new rt aileron parts / aileron bellcranks
Details
     

 10-13-2007
12.50
Right aileron
Details
       

 10-11-2007
7.00
Fix left tank brackets / seal left aileron TE
Details
       

 10-10-2007
3.00
Close left tank...and a horrible discovery
Details
       

 10-09-2007
8.50
Close up left tank
Details
       

 10-08-2007
5.80
Left aileron
Details
       

 10-07-2007
5.75
Left aileron
Details
       

 10-06-2007
10.50
Ailerons
Details
       

 10-05-2007
4.75
Prime aileron components
Details
       

 10-03-2007
3.00
Aileron components edge smoothing
Details

 07-29-2007
4.75
Aileron stiffeners
Details
       

 07-28-2007
5.00
Tanks, Ailerons
Details
       

 07-27-2007
5.50
Aileron/Flap table
Details
     

 07-17-2007
1.80
Ailerons
Details

 07-15-2007
7.00
Tanks
Details
       

 07-15-2007
1.50
Start the ailerons
Details
       

 07-14-2007
2.50
Tanks
Details

 07-14-2007
2.00
Aileron pushrods; flap brackets
Details
       

 07-13-2007
5.75
Tanks
Details

 07-13-2007
2.00
Aileron pushrods
Details

 07-10-2007
2.00
Tanks
Details

 07-08-2007
1.50
Tanks
Details

 07-07-2007
2.50
Aileron pushrods
Details

 07-04-2007
1.50
Aileron pushrods
Details

 07-03-2007
2.50
Tanks
Details
       

 07-03-2007
2.50
Tanks
Details
       

 07-01-2007
5.50
Tanks
Details

 06-30-2007
4.50
Tanks
Details
       

 06-30-2007
2.00
Tanks
Details

 06-30-2007
0.00
More pics from 6/30
       

 06-24-2007
2.80
Rough up more tank parts for Pro-seal; z-bracket n
Details

 06-23-2007
0.00
Still more pics from 6/23
Details
       

 06-23-2007
0.00
More pictures from 6/23
Details
       

 06-23-2007
7.90
Left leading edge; aileron brackets; flap bushings
Details
       

 06-23-2007
0.00
Just pictures from 6/23
Details
       

 06-18-2007
0.50
Rivet shaving on the main spar!
Details
       

 06-16-2007
6.70
Rivet left wing skeleton; start left LE
Details

 06-15-2007
2.40
Right leading edge; left skeleton
Details

 06-10-2007
1.67
Aileron brackets
Details

 06-09-2007
0.00
More photos from 9-Jun-07
       

 06-09-2007
8.30
Aileron brackets/left rib prime; left flap bracket
Details
       

 06-04-2007
9.80
Rivet right LE to main spar; aileron brackets
Details
     

 06-03-2007
4.00
Right wing skeleton, LE riveting
Details

 06-02-2007
10.25
Priming, assemble right wing skeleton
Details
       

 06-01-2007
2.10
More wing rib primer prep
Details

 05-28-2007
8.30
More wing skeleton primer prep
Details

 05-27-2007
7.50
Disassembled wing skeletons, prep for primer
Details

 05-26-2007
2.50
Right top outboard wing skin; smooth skin edges
Details

 05-25-2007
2.30
Right wing top inboard skin
Details

 05-20-2007
2.30
Right bottom wing skins
Details

 05-19-2007
6.50
Right tank/LE. Re-do left W-919
Details

 05-19-2007
0.00
Fuel pickup pictures
Details
       

 05-18-2007
6.50
Still more right tank work
Details

 05-14-2007
2.10
More right tank work
Details

 05-13-2007
7.75
Right tank work
Details

 05-12-2007
6.00
Right tank to spar; drill rt le and tank
Details

 05-08-2007
1.00
Right tank stiffeners
Details

 05-06-2007
7.50
Right leading edge; J-channel; flap brackets
Details
       

 05-05-2007
2.50
Right J channel stiffener; wing skin pics
Details
       

 04-29-2007
8.50
Left and right wing skins
Details

 04-28-2007
7.75
Left wing flap attach brackets; pitot tubing
Details
       

 04-22-2007
2.00
Left wing skins
Details

 04-20-2007
8.00
Fuel pickup tubes; left top wing skins
Details
       

 04-18-2007
1.00
Fuel pick up tubes
Details

 04-16-2007
7.30
Left leading edge; left bottom skins
Details

 04-15-2007
3.50
Left tank, left leading edge
Details
       

 04-13-2007
3.83
Left tank
Details

 04-07-2007
6.00
Left tank
Details

 04-02-2007
2.00
Left tank
Details

 04-01-2007
8.50
Left tank
Details

 03-31-2007
7.75
Left tank
Details

 03-30-2007
1.75
Left tank
Details

 03-25-2007
11.00
Left wind skins and left leading edge
Details

 03-24-2007
1.75
Left wing skins
Details

 03-23-2007
1.00
Left wing skin match drilling
Details

 03-20-2007
2.66
Wing skins
Details

 03-19-2007
2.83
Wing rib prep; assemble wing skeletons on stands
Details

 03-18-2007
3.25
Wing rib prep; aileron align tool
Details
       

 03-17-2007
6.50
Wing rib prep
Details

 03-16-2007
2.00
Wing rib prep
Details

 03-11-2007
12.50
Rear spars; aileron bellcranks assy
Details

 03-10-2007
8.50
Rear spars
Details

 03-05-2007
2.75
Rear spars
Details

 03-04-2007
6.50
Main spar nutplates / wing tie downs
Details

 03-03-2007
8.00
Wing stand/more nutplates
Details

 02-25-2007
8.00
Main spar tank attach nutplates
Details
       

 02-18-2007
8.00
Shop rearrangement / wing stand
Details

 02-17-2007
8.00
Inventory, break down crates
Details

 02-14-2007
3.00
Wing Kit Arrives!
Details

 02-13-2007
2.00
Prep shop for Wing Kit arrival
Details










Copyright © 2001-2024 Matronics. All Rights Reserved.