Powered By Kitlog Pro v2.0
RANDY'S WEB SITE
S-19
Fuselage
Work Logs Found:
43
Category Work Time:
172 Hours
Date
Hours
Work Log Summary
Details
09-25-2010
4.50
Top cowl
Details
09-24-2010
5.00
Top cowl and interior
Details
09-23-2010
8.00
Top cowl and interior
Details
09-22-2010
6.00
Nav,map lights, Windshield
Details
09-21-2010
4.00
Fuel lines
Details
08-26-2010
3.00
NACA vents and ELT
Details
08-25-2010
8.00
Seats
Details
08-24-2010
6.00
Seats
Details
08-23-2010
4.00
Seats
Details
08-21-2010
5.00
Brackets, downspring flap lever and baggage floor
Details
08-13-2010
3.00
Riveted forward lower and right side skins
Details
08-12-2010
8.00
Fwd side skins
Details
08-01-2010
2.00
Control cable support
Details
07-31-2010
2.00
Wires and carb heat
Details
07-29-2010
3.00
Securing wires
Details
07-27-2010
6.00
Wiring
Details
07-25-2010
5.00
Fuel system/vertical staiblizer
Details
07-24-2010
4.50
Brakes
Details
07-05-2010
4.00
Parking brake valve
Details
07-03-2010
5.00
Installed Landing Gear
Details
05-30-2010
4.00
Battery box and cabin heat
Details
05-29-2010
4.00
Interior and fuel system
Details
05-13-2010
5.00
Interior
Details
05-12-2010
5.00
Brake Lines
Details
05-09-2010
4.00
Brakes
Details
05-01-2010
4.00
Gear legs
Details
04-29-2010
4.00
Started back on the fuselage
Details
04-13-2010
1.00
Mounted tires
Details
03-28-2010
4.00
Painted steel parts
Details
03-27-2010
4.00
Primed steel parts
Details
03-26-2010
2.00
Eng mount spacers
Details
03-24-2010
3.00
Installing nose gear
Details
03-24-2010
3.00
Drilling firewall for mount
Details
03-10-2010
0.00
Windshield hold down
Details
10-19-2009
0.00
Canopy,seats and interior shipped today
Details
08-13-2009
3.00
Riveting
Details
08-01-2009
3.00
Prime & paint
Details
07-31-2009
3.00
Roll bar
Details
07-27-2009
3.00
Seat belt brackets
Details
07-11-2009
3.00
Mating tail, center and forward fuselage
Details
07-10-2009
7.00
Joined Forward fuselage
Details
07-09-2009
6.00
Joined Tailcone and Center fuselage
Details
12-24-2008
1.00
Mocked up fwd and center fuselage
Details
SITE NAVIGATION
Contact Builder
S-19 Home
Category
# Logs
# Hours
All
408
1515
Aft fuselage
21
108
Aft Fuselage
2
9
Avionics
34
138
Canopy
16
72
Center Fuselage
32
130
Construction Tips
6
Cowling
5
21
Empennage
1
1
Engine
31
90
Fuel tanks
9
24
Fuselage
32
130
Fuselage
43
172
FWD Fuselage
27
102
HorizontalStabilizer
15
68
Inspections
2
9
Instrument Panel
1
Interior
2
8
Miscellaneous
4
4
Painting
5
6
Phase I flight test
16
22
Rudder
6
18
Vertical Stabilizer
10
28
Wheel Pants
2
23
Wings
85
326
Workshop
1
6
Copyright © 2001-2024 Matronics. All Rights Reserved.