Powered By Kitlog Pro v2.0
Jims Web Site
601XLB
horizonal stabilisze
Work Logs Found:
13
Category Work Time:
24 Hours
Date
Hours
Work Log Summary
Details
04-24-2010
0.50
Lowered aircraft to floor
Details
04-24-2010
1.10
Installed wheels
Details
04-24-2010
2.00
Installed Axle and Tires on wheels.
Details
04-23-2010
2.50
Installed Main gear
Details
04-02-2010
2.00
Made cutouts in gear for mounting
Details
03-08-2010
0.30
Re-installed main gear attachments removed for mod
Details
01-24-2010
2.50
Installed nose gear on aircraft
Details
01-22-2010
0.70
Primed and painted landing gear leg
Details
01-22-2010
2.50
Attached nose gear leg to wheel fork
Details
01-21-2010
4.00
Fitted nose gear bottom bearing
Details
01-20-2010
3.70
Temporary installation of brakes
Details
01-19-2010
1.70
Initial preparation
Details
01-18-2010
0.20
Initial landing gear prep
Details
SITE NAVIGATION
601XLB Home
Category
# Logs
# Hours
All
823
2512
aircraft kit
26
57
Avionics
26
57
controls
22
44
Electrical
53
155
elevator
12
23
Elevator
22
44
Engine
79
352
Fuel System
53
155
Fuselage
179
542
horizonal stabilisze
13
24
Ignition
86
194
Landing gear
13
24
Miscellaneous
13
23
None
3
192
prop
2
4
Prop
2
3
Purchasing
53
155
rudder
12
23
Tools
1
1
Wings
14
91
Wiring
53
155
Zenith modification
86
194
Copyright © 2001-2024 Matronics. All Rights Reserved.