Powered By Kitlog Pro v2.0
Jims Web Site
601XLB
rudder
Work Logs Found:
12
Category Work Time:
23 Hours
Date
Hours
Work Log Summary
Details
08-31-2012
2.10
Installed elevator saddle
Details
08-24-2012
3.90
Installed elevator
Details
10-12-2010
0.80
Touched up paint and shot top with clear coat
Details
10-10-2010
2.10
Shot second color
Details
10-08-2010
3.10
Priming and painting!
Details
10-07-2010
2.00
Cleaned, prepped, and primed top side of elevator
Details
02-04-2010
2.20
Installed port horizontal stabilizer tip
Details
02-01-2010
0.40
Routed elevator trim servo cable
Details
02-01-2010
0.40
Riveted elevator to horizontal stabilizer
Details
02-01-2010
2.10
Installed stbd elevator tip
Details
01-03-2010
2.10
locate and drill horizontal stabilizer attachment
Details
12-23-2009
2.10
Rework elevator attachment to fuselage
Details
SITE NAVIGATION
601XLB Home
Category
# Logs
# Hours
All
823
2512
aircraft kit
26
57
Avionics
26
57
controls
22
44
Electrical
53
155
elevator
12
23
Elevator
22
44
Engine
79
352
Fuel System
53
155
Fuselage
179
542
horizonal stabilisze
13
24
Ignition
86
194
Landing gear
13
24
Miscellaneous
13
23
None
3
192
prop
2
4
Prop
2
3
Purchasing
53
155
rudder
12
23
Tools
1
1
Wings
14
91
Wiring
53
155
Zenith modification
86
194
Copyright © 2001-2024 Matronics. All Rights Reserved.