09-22-2014
2.00
swapped oil pressure and temperature sensors
Details
09-02-2014
2.10
start of break in run
Details
08-18-2014
0.50
re-installed starter
Details
08-06-2014
2.10
Tested and removed starter
Details
07-28-2014
0.40
Replaced snap ties in engine compartment
Details
07-15-2014
1.50
installed baffle, breather hose
Details
07-12-2014
2.80
Starter, baffles, cyl nuts
Details
07-08-2014
2.00
various engine updates
Details
06-27-2014
2.00
Finished primter removal, sealed maiform pressure
Details
06-26-2014
1.10
Second engine run
Details
06-25-2014
2.00
Clean up & add maifold pressure lead to CDI
Details
06-24-2014
2.10
Continued engine cleanup
Details
06-20-2014
2.10
Calibrated tach; first formal engine run
Details
06-16-2014
2.50
Reversed mixture control
Details
06-14-2014
40.00
Worked engine/ignition problems
Details
11-12-2013
14.00
Engine problems
Details
08-24-2013
2.00
Re-installed oil pressure/temperature sensors
Details
05-10-2013
0.30
Verified fuel pressure meter / primer functional
Details
05-09-2013
5.00
nose high/nose low fuel flow tests
Details
05-08-2013
4.00
Updated fuel flow tests
Details
04-16-2013
0.30
Installed missing engine bolts
Details
04-10-2013
3.00
restored fuel pump system
Details
03-18-2013
10.00
ran fuel flow tests
Details
12-27-2012
15.00
Worked on CDI
Details
11-10-2012
2.10
Installed exhaust pipes
Details
06-18-2012
2.50
Mounted & wired fuel pumps
Details
06-12-2012
4.00
Worked on fuel manifold
Details
05-08-2012
1.90
Installed another cylinder
Details
04-25-2012
1.90
Installed input and output connectors on Lightspee
Details
04-23-2012
2.10
Installed coax from Lightspeed unit to ignition co
Details
04-19-2012
0.90
Installed Throttle linkage
Details
04-19-2012
1.50
Completed Lightspeed Installation on mounting tray
Details
04-16-2012
1.10
Mounted ignition coils on engine mount
Details
04-14-2012
3.50
Installed Lightspeed sensors
Details
04-13-2012
2.10
Lightspeed planning
Details
04-13-2012
2.70
fuel system planning
Details
04-12-2012
8.00
Began fabrication of the Lightspeed mount
Details
04-11-2012
4.00
Located installation position for Lightspeed units
Details
04-10-2012
8.00
Began installation of magneto replacements
Details
04-09-2012
2.90
Installed Carby fittings & heat control
Details
04-07-2012
0.50
Installed carby air box
Details
04-07-2012
1.20
Installated rings & first cylinder
Details
04-06-2012
0.40
Installed oil filter adapter
Details
04-05-2012
2.10
reworked oil tank & installed
Details
03-29-2012
6.00
Researched and ordered magnetos
Details
03-17-2012
2.50
Fabricated cover for vacuum pump hole
Details
03-16-2012
5.20
Installed Misc engine parts
Details
03-13-2012
1.50
Replace carby manifold hw, routed mixture control
Details
03-13-2012
2.50
installed tach and hour meter
Details
03-07-2012
2.10
Installed carby assembly
Details
02-24-2012
0.80
Reinstalled 530163 flanges
Details
02-22-2012
2.50
Installed starter and engine ground
Details
02-20-2012
4.10
Installed crankcase
Details
02-16-2012
3.50
Checked starter for fit, mated crankcase
Details
02-11-2012
6.60
Begin engine re-construction
Details
02-08-2012
2.50
Cleaned engine parts & installed piston rods
Details
02-07-2012
4.40
Cleaned engine hardware & modified starter pinon
Details
02-04-2012
5.30
cleaned & painted rocker box covers
Details
01-31-2012
6.00
cleaned and painted rest of crankcase
Details
01-28-2012
6.50
cleaned and painted half of crankcase
Details
01-25-2012
4.00
Cleaned crankcase in degreaser bath.
Details
01-23-2012
2.50
Refurbished oil tank
Details
01-21-2012
6.00
Grit blasted parts
Details
01-17-2012
3.60
Removed Oil pump & split care
Details
01-16-2012
5.30
Removed mag and rear case accessories
Details
01-14-2012
3.00
Removed engine from aircraft
Details
01-13-2012
8.00
Crated and shipped cylinders
Details
12-29-2011
10.00
Began cleaning engine parts
Details
12-20-2011
2.50
Removed carby manifolds and pistons.
Details
12-15-2011
8.00
Removed cylinders
Details
12-01-2011
1.50
Built and installed intercylinder baffles
Details
11-28-2011
2.00
Added seals to side and rear baffles
Details
11-19-2011
6.00
Installed nut plates on side and rear baffles.
Details
11-05-2011
48.00
Started engine baffles
Details
09-26-2011
0.50
Installed mixture control in cockpit
10-08-2010
0.70
Cleaned and mechanically installed magneto switch.
Details
10-05-2010
2.80
Did initial fit of lower engine cowling
Details
10-05-2010
1.00
Cut plug to sit behind prop flange to position cow
Details
09-21-2010
2.50
Trial mount of engine
Details
SITE NAVIGATION
601XLB Home
Category
# Logs
# Hours
All
823
2512
aircraft kit
26
57
Avionics
26
57
controls
22
44
Electrical
53
155
elevator
12
23
Elevator
22
44
Engine
79
352
Fuel System
53
155
Fuselage
179
542
horizonal stabilisze
13
24
Ignition
86
194
Landing gear
13
24
Miscellaneous
13
23
None
3
192
prop
2
4
Prop
2
3
Purchasing
53
155
rudder
12
23
Tools
1
1
Wings
14
91
Wiring
53
155
Zenith modification
86
194