Work Logs Found: 79
Category Work Time: 352 Hours
 Date
Hours
Work Log Summary

Details

 09-22-2014
2.00
swapped oil pressure and temperature sensors
Details
       

 09-02-2014
2.10
start of break in run
Details

 08-18-2014
0.50
re-installed starter
Details
       

 08-06-2014
2.10
Tested and removed starter
Details

 07-28-2014
0.40
Replaced snap ties in engine compartment
Details
       

 07-15-2014
1.50
installed baffle, breather hose
Details
       

 07-12-2014
2.80
Starter, baffles, cyl nuts
Details

 07-08-2014
2.00
various engine updates
Details
       

 06-27-2014
2.00
Finished primter removal, sealed maiform pressure
Details
       

 06-26-2014
1.10
Second engine run
Details
       

 06-25-2014
2.00
Clean up & add maifold pressure lead to CDI
Details
       

 06-24-2014
2.10
Continued engine cleanup
Details

 06-20-2014
2.10
Calibrated tach; first formal engine run
Details
     

 06-16-2014
2.50
Reversed mixture control
Details

 06-14-2014
40.00
Worked engine/ignition problems
Details

 11-12-2013
14.00
Engine problems
Details

 08-24-2013
2.00
Re-installed oil pressure/temperature sensors
Details
       

 05-10-2013
0.30
Verified fuel pressure meter / primer functional
Details

 05-09-2013
5.00
nose high/nose low fuel flow tests
Details
       

 05-08-2013
4.00
Updated fuel flow tests
Details
     

 04-16-2013
0.30
Installed missing engine bolts
Details
     

 04-10-2013
3.00
restored fuel pump system
Details
     

 03-18-2013
10.00
ran fuel flow tests
Details

 12-27-2012
15.00
Worked on CDI
Details

 11-10-2012
2.10
Installed exhaust pipes
Details
       

 06-18-2012
2.50
Mounted & wired fuel pumps
Details
       

 06-12-2012
4.00
Worked on fuel manifold
Details

 05-08-2012
1.90
Installed another cylinder
Details
       

 04-25-2012
1.90
Installed input and output connectors on Lightspee
Details
       

 04-23-2012
2.10
Installed coax from Lightspeed unit to ignition co
Details
       

 04-19-2012
0.90
Installed Throttle linkage
Details
     

 04-19-2012
1.50
Completed Lightspeed Installation on mounting tray
Details
       

 04-16-2012
1.10
Mounted ignition coils on engine mount
Details
     

 04-14-2012
3.50
Installed Lightspeed sensors
Details
       

 04-13-2012
2.10
Lightspeed planning
Details
       

 04-13-2012
2.70
fuel system planning
Details
       

 04-12-2012
8.00
Began fabrication of the Lightspeed mount
Details
       

 04-11-2012
4.00
Located installation position for Lightspeed units
Details

 04-10-2012
8.00
Began installation of magneto replacements
Details
       

 04-09-2012
2.90
Installed Carby fittings & heat control
Details
       

 04-07-2012
0.50
Installed carby air box
Details
     

 04-07-2012
1.20
Installated rings & first cylinder
Details
       

 04-06-2012
0.40
Installed oil filter adapter
Details
     

 04-05-2012
2.10
reworked oil tank & installed
Details
       

 03-29-2012
6.00
Researched and ordered magnetos
Details

 03-17-2012
2.50
Fabricated cover for vacuum pump hole
Details
       

 03-16-2012
5.20
Installed Misc engine parts
Details
       

 03-13-2012
1.50
Replace carby manifold hw, routed mixture control
Details
       

 03-13-2012
2.50
installed tach and hour meter
Details
       

 03-07-2012
2.10
Installed carby assembly
Details
       

 02-24-2012
0.80
Reinstalled 530163 flanges
Details
     

 02-22-2012
2.50
Installed starter and engine ground
Details
       

 02-20-2012
4.10
Installed crankcase
Details

 02-16-2012
3.50
Checked starter for fit, mated crankcase
Details
       

 02-11-2012
6.60
Begin engine re-construction
Details
       

 02-08-2012
2.50
Cleaned engine parts & installed piston rods
Details
       

 02-07-2012
4.40
Cleaned engine hardware & modified starter pinon
Details
     

 02-04-2012
5.30
cleaned & painted rocker box covers
Details
       

 01-31-2012
6.00
cleaned and painted rest of crankcase
Details
       

 01-28-2012
6.50
cleaned and painted half of crankcase
Details
     

 01-25-2012
4.00
Cleaned crankcase in degreaser bath.
Details

 01-23-2012
2.50
Refurbished oil tank
Details
     

 01-21-2012
6.00
Grit blasted parts
Details
     

 01-17-2012
3.60
Removed Oil pump & split care
Details
       

 01-16-2012
5.30
Removed mag and rear case accessories
Details
       

 01-14-2012
3.00
Removed engine from aircraft
Details

 01-13-2012
8.00
Crated and shipped cylinders
Details

 12-29-2011
10.00
Began cleaning engine parts
Details
       

 12-20-2011
2.50
Removed carby manifolds and pistons.
Details
       

 12-15-2011
8.00
Removed cylinders
Details
       

 12-01-2011
1.50
Built and installed intercylinder baffles
Details
     

 11-28-2011
2.00
Added seals to side and rear baffles
Details
       

 11-19-2011
6.00
Installed nut plates on side and rear baffles.
Details
       

 11-05-2011
48.00
Started engine baffles
Details
       

 09-26-2011
0.50
Installed mixture control in cockpit
       

 10-08-2010
0.70
Cleaned and mechanically installed magneto switch.
Details
       

 10-05-2010
2.80
Did initial fit of lower engine cowling
Details
       

 10-05-2010
1.00
Cut plug to sit behind prop flange to position cow
Details
       

 09-21-2010
2.50
Trial mount of engine
Details
       