Powered By Kitlog Pro v2.0
Jims Web Site
601XLB
Purchasing
Work Logs Found:
53
Category Work Time:
155 Hours
Date
Hours
Work Log Summary
Details
01-29-2014
2.50
No fuel pressure
Details
10-01-2013
10.00
Worked fuel pump location
Details
01-25-2013
2.50
Provisions for rear position lamp
Details
01-22-2013
0.80
Starter
Details
01-22-2013
1.00
Compass lighting
Details
12-29-2012
20.00
Replaced battery
Details
10-10-2012
2.10
Replaced master relay
Details
09-29-2012
11.10
Connected lights and pitot tube under port seat.
Details
06-18-2012
2.00
Replaced master relay fuse
Details
05-15-2012
0.75
Finished battery installation
Details
05-14-2012
1.20
Electrical system work
Details
05-14-2012
0.50
Began battery installation
Details
05-08-2012
1.10
Routed tach pickup
Details
05-07-2012
1.10
Prepared leads from CDI for battery connection
Details
05-05-2012
3.10
Installed Lightspeed control in aircraft
Details
05-04-2012
4.00
Updated Light Speed Control panel
Details
04-26-2012
2.50
Fabricated control panel for Lightspeed unit
Details
03-12-2012
1.50
Replaced alternator circuit breaker
Details
03-05-2012
2.10
Installed alternator & tachometer drive assembly
Details
02-07-2012
4.90
Fixed Illuminated switches & Fuel pump switch
Details
09-21-2011
10.00
Debug and run ground test
Details
06-23-2011
6.00
Installed light dimmer
Details
06-01-2011
0.20
Install instrument light strips
Details
10-04-2010
0.50
Drilled mounting holes for wet compass atop panel
Details
09-23-2010
2.00
Updated electrical drawings
Details
09-14-2010
2.70
Moved stobe control to port side of aircraft
Details
09-11-2010
0.90
Installed lighting above instrument panel.
Details
09-09-2010
2.50
Installed more wires behind panel
Details
08-26-2010
2.00
Corrected error in electrical location of ammeter
Details
08-25-2010
3.10
Added power and ground to selected instruments
Details
08-24-2010
3.10
Added terminal board 3 and avionics ground
Details
08-23-2010
0.40
Painted screw head for instrumetns
Details
08-23-2010
2.00
Ordered parts for instrument panel
Details
08-17-2010
2.50
Installed strobe power supply
Details
08-16-2010
6.00
Installed TB1
Details
08-14-2010
6.00
Routed more wires in center console and revised wi
Details
08-13-2010
5.00
Cleaned up wiring in center console area
Details
08-06-2010
0.00
Reinstalled console, and routed wiring
Details
08-05-2010
0.50
Installed protective grommet in console panel
Details
08-05-2010
0.80
Installed ammeter shunt
Details
03-31-2010
0.70
Clecoed wiring bundles to side of fairings
Details
03-29-2010
1.00
Clecoed wiring bundles inside arm rest
Details
03-26-2010
4.10
Added wiring from master relay to front of aircraf
Details
02-22-2010
1.00
Installed flap motor
Details
01-20-2010
0.90
Replaced battery wiring
Details
01-19-2010
0.50
Reworked battery power installation
Details
12-12-2009
1.30
Design/document trim and flap control wiring
Details
12-08-2009
2.30
Installed Master power relay
Details
12-07-2009
2.30
Installed battery box
Details
12-06-2009
2.00
Completed design of battery box installation
Details
12-05-2009
2.00
Documented existing battery box planned for aircra
Details
12-05-2009
2.30
Designed battery box installation, cut initial pie
Details
11-19-2009
4.00
Cleaned up existing battery box
Details
SITE NAVIGATION
601XLB Home
Category
# Logs
# Hours
All
823
2512
aircraft kit
26
57
Avionics
26
57
controls
22
44
Electrical
53
155
elevator
12
23
Elevator
22
44
Engine
79
352
Fuel System
53
155
Fuselage
179
542
horizonal stabilisze
13
24
Ignition
86
194
Landing gear
13
24
Miscellaneous
13
23
None
3
192
prop
2
4
Prop
2
3
Purchasing
53
155
rudder
12
23
Tools
1
1
Wings
14
91
Wiring
53
155
Zenith modification
86
194
Copyright © 2001-2024 Matronics. All Rights Reserved.