Powered By Kitlog Pro v2.0
Vans RV6
RV6
F. Wings
Work Logs Found:
152
Category Work Time:
347 Hours
Date
Hours
Work Log Summary
Details
12-07-2011
10.00
Wing Last Coat
12-07-2011
5.00
Painted Wing Control Surfaces
12-06-2011
2.00
Wings First Coat
12-05-2011
5.00
Prep Wing For Painting
11-26-2011
5.00
Final Fuel Tank Checks
Details
11-04-2011
5.00
Wing Tip[ Completion
10-23-2011
4.00
Aileron Rigging
10-01-2011
4.00
Wing Wire Termination
09-26-2011
6.00
Right Wing Wiring
09-25-2011
8.00
Wiring Left Wing
Details
09-18-2011
8.00
Installed Wing Lighting
09-11-2011
6.00
Cleaned Wings With Scotchbrite & Soapy Water
09-01-2011
1.00
Wing Fillet Temp Fit
08-08-2010
1.20
Wingtip Lights
03-06-2010
0.50
Wing Jig Taken Down
02-28-2010
1.20
The wing was rotated in the Jig & aileron angles m
02-28-2010
2.80
Flaps
Details
02-28-2010
1.00
Flap Brace Fitted & Pop Riveted
02-27-2010
0.10
Wings Finished Apart From Tips
02-26-2010
0.10
Wing Pictures In Jig
02-26-2010
1.00
Pushrod Hole In Rear Spar
02-26-2010
1.20
Aileron Trim
Details
02-26-2010
0.25
Aileron Pushrod
Details
02-26-2010
1.50
Aileron Brackets Riveted On
02-26-2010
4.00
Aileron Bracket Fitting
Details
02-25-2010
1.50
Fuel Tank Final Assemby & Fit
02-24-2010
4.50
Riveted Bottom Rear Skins On
02-24-2010
1.00
Fitted gusset & inbourd aileron mounting bracket.
02-23-2010
0.40
604 Bulkhead - 5/8 Holes Drilled For Rudder Cable
02-23-2010
2.00
604 Bulkhead
02-23-2010
2.00
604 Bulkhead
02-22-2010
2.50
Pitot Alignemnt & Bottom Skinning
02-20-2010
0.70
Primed Left Wing Skins
02-15-2010
0.80
Fitted Aileron Belcrank
02-09-2010
0.80
Run Pitot Line & Pop Rivited Down. Run guides for
02-09-2010
1.50
Rear Tank Baffle Fitted & Sealed. Nutplates On Spa
Details
02-08-2010
1.30
Capacitave Fuel Senders
02-07-2010
3.00
Fuel Tank Assembly
Details
02-02-2010
2.00
Prosealing end baffle on fuel tank.
01-26-2010
1.20
Organising Fitting Of Pitot
01-23-2010
1.50
Prosealed end rib
Details
01-17-2010
2.50
Prosealing Left Fuel Tank Ribs
01-17-2010
2.10
Left Fuel Tank Pickup
10-28-2009
4.00
Left Fuel Tank
10-27-2009
1.60
Left Fuel Tank - Fuel Trap Door
10-26-2009
5.00
Left Wing Bottom Skins Fitted
10-21-2009
6.00
Left Wing Leading Edge
10-20-2009
5.00
Left wing ribs fitted
Details
10-05-2009
2.00
Left Main Wing Assembley
Details
10-04-2009
1.00
Right Wing - Completed For Inspection
Details
10-03-2009
2.20
Left Fuel Tank Started.
Details
10-01-2009
3.50
Left Rear Spar Constructed.
Details
10-01-2009
6.00
Left Main Spar Constructed.
Details
10-01-2009
1.00
Fluting Not Required
Details
09-30-2009
0.75
Wing Ribs Prepared
Details
09-30-2009
1.00
Wing Ribs Alodined
09-29-2009
1.40
Right Aileron Connected.
09-29-2009
0.60
Flaps Fitted for alignment.
09-29-2009
0.75
Flap Brace
Details
09-28-2009
1.30
Aileron Tidyup & Fitting.
Details
09-28-2009
1.20
Aileron Pushrod Assembly
Details
09-27-2009
4.00
LH Rear Spar Cleaned & Assembled.
09-26-2009
0.50
Ribs Alodined
09-26-2009
0.20
LH Ribs Preparation.
Details
09-22-2009
1.00
Further Assembly - LH Spar
09-22-2009
3.00
Assembled LH Spar
09-21-2009
4.00
Alodined LH Spar Components
09-13-2009
4.00
Bottom Skins Riveted On - RH Wing
09-13-2009
1.20
Ailerons Mounted - Right Wing
09-08-2009
3.00
Final Assembly Flaps
Details
09-08-2009
5.00
Drilled, Deburred & Clecoed Bottom Sikins On.
09-07-2009
1.00
Primed Bottom & Flap Skins
09-07-2009
1.00
Drilled & Clecoed piano hinge to the flap spar.
Details
09-06-2009
4.00
Manufacture - Flap
Details
09-05-2009
3.00
Flap Parts
Details
09-05-2009
4.00
Flap Assembly
Details
08-30-2009
1.00
Flaps
08-23-2009
2.50
Rear Baffle Prosealed & Riveted.
08-22-2009
4.00
Plate Nuts Installed For Fuelk Tank Fitting
08-16-2009
1.50
Wiring Tube Brackets
Details
08-16-2009
2.50
Wing Wiring Brackets
Details
08-16-2009
1.00
Internal Tank Work.
Details
08-16-2009
0.50
Cork Casket Fitted
Details
08-02-2009
1.00
Prosealed anywhere where fuel can get out.
Details
08-02-2009
3.00
Prosealed & Riveted End Ribs
Details
08-02-2009
0.50
Fuel Tank Elbow Prosealed
Details
08-01-2009
3.00
Fuel Pickup
Details
07-26-2009
4.60
Ribs Proselaed & Riveted
Details
07-26-2009
3.00
Fuel Tank Access Plate
Details
07-26-2009
1.00
Fuel Drain Fitted
Details
07-25-2009
5.00
Capacitave Fuel Sensor Plates
Details
07-19-2009
0.90
Fuek Cap
Details
07-19-2009
3.00
Baffles Cut, Fitted & Sealed
Details
07-18-2009
3.50
Skin fitted, drilled & clekoed
Details
07-18-2009
0.80
End Baffles
Details
07-12-2009
1.00
Fluted Ribs & Cut Cell Holes
Details
07-12-2009
3.00
Alignement
Details
07-11-2009
1.50
Prepared Baffles & Spar
Details
07-04-2009
1.00
Fuel Tank Construction
Details
06-16-2009
1.00
Finished Riveting The Leading Edge.
Details
06-06-2009
3.00
Placed Outboard Skin On Ribs
Details
05-25-2009
1.00
Threaded Rod Through Top Ribs
Details
05-25-2009
0.50
Threaded rod aligned to Jig
Details
05-25-2009
2.00
Mounting Leading Edge On Spar.
05-25-2009
2.00
Leading Edge Complete
Details
05-24-2009
0.20
Wing Taking Shape
Details
05-24-2009
0.75
W623 Strap Riveted To Rib
Details
05-24-2009
2.00
Belcrank assembly assembbled.
Details
05-24-2009
0.75
Balcrank Assembly
Details
05-24-2009
2.00
Assembly of leading edge.
Details
05-23-2009
1.50
Wing Ribs Primed & Riveted To Spar
Details
05-23-2009
0.50
Belcrank Frame Assembly Primed
Details
05-23-2009
0.10
Aileron Hole
Details
05-18-2009
0.20
Further parts prepared for priming.
Details
05-03-2009
2.00
Rear Spar Primed & Assembled.
Details
05-03-2009
0.50
Rear spar mounted into jig
Details
05-03-2009
1.00
Rear Spar Assembly
Details
04-28-2009
0.50
Spacers & Tiedown riveted & bolted into place.
Details
04-27-2009
4.00
Main Spar Riveted & Assembled In Jig
Details
04-24-2009
1.20
Gussets pre assembled to Belcrank Assembly.
Details
04-21-2009
0.75
Belcrank assembly started.
Details
04-16-2009
2.00
Top & Bottom Ribs aligned, drilled & deburred.
Details
04-14-2009
3.00
Angle spacers cut, scotchbrite & pre assembly.
Details
04-13-2009
0.50
Spar rechecked again for stations.
Details
04-12-2009
2.00
Set Spar Bolt/Rivet Configuration
Details
04-12-2009
1.00
Prepared Ribs For Priming
Details
04-11-2009
2.00
Rivet Flush Head Rivest Into Spar Root.
04-09-2009
2.50
Main Bulkhead Preparation
Details
04-07-2009
2.00
Prepared Main WIng Spar For Priming.
Details
04-05-2009
1.00
Primed Aileron
Details
03-25-2009
3.00
Aileron Trim Tab
Details
03-22-2009
2.50
Electric Aileron Trim.
Details
03-19-2009
2.00
Cleckod Skeleton To Skin
Details
03-15-2009
2.50
Riveted A-610 Stiffners Inside Right Aileron
Details
03-15-2009
4.00
Alodined Spar & Skins
Details
03-15-2009
3.00
A610 stiffners and aileron skins primed.
Details
03-11-2009
2.50
Lighning Holes Cut Into Aileron Spar
Details
03-07-2009
1.00
Right Aileron Dimpled and Deburred
Details
03-07-2009
4.00
Clean, alumniprep & alodine aileron parts.
Details
02-28-2009
6.00
Aileron Pre Construction
Details
02-18-2009
0.20
Aileron Mounting Brackets Sent To Powdercoat
Details
02-05-2009
2.00
Aileron Skeleton
Details
02-04-2009
1.00
Aileron Counterbalance
Details
02-03-2009
4.00
A408 Aileron Re-enforcement Bracket
Details
12-24-2008
6.00
Right Wing Spar With Zinc Chromate Removed
Details
12-22-2008
0.20
Disaster strikes.
Details
12-13-2008
2.00
Polished various Aileron Parts
Details
12-11-2008
3.00
Removing Zinc Chromate from Spars.
Details
12-04-2008
1.00
Inventory Aileron Parts
Details
11-27-2008
0.50
Spar Strap
Details
11-25-2008
2.20
Removed Plastic From LH Wing Spar
Details
11-16-2008
3.50
Constructing the Wing Jig
Details
SITE NAVIGATION
Contact Builder
RV12 Home
RV6 Home
Category
# Logs
# Hours
All
364
1231
A. Pre Planning
7
16
B. The Shed
4
4
C. Tools
3
1
D. Order & Shipping
2
1
E. Empennage
11
210
F. Wings
152
371
G. Fuselage
111
238
H. Finisheing & FWF
22
118
I. Engine
9
16
K. Wiring & Electric
12
195
L. Fuel System
1
1
LINKS
8
1
M Final Assembly
7
43
Maintenance Inspecti
3
0
Milestones
8
15
Miscellaneous
3
1
Shop Supplies
1
0
Copyright © 2001-2024 Matronics. All Rights Reserved.