Powered By Kitlog Pro v2.0
Marks Rans Courier Project
S7S
Electrical system
Work Logs Found:
25
Category Work Time:
74 Hours
Date
Hours
Work Log Summary
Details
09-29-2009
2.00
test strobe/nav lights, torque seal asst nuts
Details
09-28-2009
2.00
wiring strobe and nav lites
Details
09-24-2009
1.50
wiring strobes/nav lites
Details
02-11-2009
3.00
system power-up and testing
Details
02-10-2009
3.00
Fabricate cables and install battery
Details
01-31-2009
1.00
Strobe power unit mounting and wiring
Details
01-30-2009
4.00
Misc wiring
Details
01-29-2009
2.00
GPS power supply
Details
01-28-2009
4.00
MAC stick grip and trim servo indicator wiring
Details
01-27-2009
3.00
wiring MAC stick
Details
01-26-2009
4.00
Forward stick trim and PTT wiring
Details
01-25-2009
6.00
Headphone jacks, Elevator trim etc
Details
01-24-2009
4.00
Fabircate headset jack mounting plates
Details
01-11-2009
5.00
Wiring etc
Details
01-10-2009
4.00
Panel wiring
01-08-2009
3.00
Panel wiring
01-06-2009
2.00
Panel wiring
11-11-2008
3.00
Install battery cables
Details
11-10-2008
2.00
Swage connectors onto the battery cables
Details
11-10-2008
2.00
More wiring
Details
11-08-2008
6.00
Wiring
Details
11-07-2008
2.00
fabricate copper buss for the primary switches
Details
11-05-2008
2.00
layout battery cables
Details
11-03-2008
1.00
Battery contactor
11-02-2008
2.00
Fabricate and install battery contactor mount plat
Details
SITE NAVIGATION
Contact Builder
S7S Home
Category
# Logs
# Hours
All
317
1046
Avionics
5
15
Cowling
8
19
Doors
10
35
Electrical system
25
74
Engine
30
100
First Flight
1
1
Fuselage
81
256
Instrument Panel
26
88
Mains, wheel/brake
7
18
Miscellaneous
30
122
None
4
15
Paint
3
6
Prop
8
16
Rigging
1
2
Shop Supplies
1
2
Tools
1
5
Torque tube assembly
5
16
Windshield & Skylite
17
57
Wings
54
199
Copyright © 2001-2024 Matronics. All Rights Reserved.