Powered By Kitlog Pro v2.0
Randalls Web Site
RV9A
Paint
Work Logs Found:
58
Category Work Time:
227 Hours
Date
Hours
Work Log Summary
Details
05-06-2009
3.90
Finish painting
Details
05-06-2009
2.40
Elevator paint
Details
05-05-2009
4.70
Upper engine cowl
Details
04-20-2009
4.70
Finished painting upper fuselage
Details
04-19-2009
2.10
Masking fuselage
Details
04-17-2009
1.80
Prepping fuselage.
Details
04-16-2009
4.10
Upper fuselage prep.
Details
04-13-2009
1.80
Repainted instrument panel
Details
04-12-2009
2.00
Painted instrument panel
Details
04-12-2009
2.10
Paint spinner
Details
04-11-2009
2.90
Prepping panel and spinner
Details
04-08-2009
3.10
Interior paint
Details
04-07-2009
4.90
Finish painting the interior.
Details
04-06-2009
3.90
Prepping interior for paint
Details
04-05-2009
0.70
Rolled the fuselage over.
Details
04-04-2009
2.10
Cleaned up the masking tape and paper
Details
04-03-2009
2.60
Prime bottom of fuse and cowlings
Details
04-03-2009
5.40
Finish paint Fuselage Bottom
Details
04-03-2009
0.10
Before, during and after colour change.
04-02-2009
3.20
Masking and prepping
Details
04-02-2009
2.60
Finish prep and wash
Details
04-01-2009
2.70
Repaint prep
Details
03-31-2009
4.80
Stripping of primer.
Details
03-31-2009
3.30
Stripping
Details
03-30-2009
4.50
Started stripping old colour
Details
03-29-2009
5.20
Sealing pinholes
Details
03-23-2009
2.60
Spot Putty
Details
03-22-2009
3.20
Block Sanding
Details
02-23-2009
2.70
Clear-coated wing
Details
02-22-2009
3.40
Repainted basecoat
Details
02-21-2009
3.50
BASE TOUCHUP
Details
02-20-2009
4.00
Colour sanding
Details
02-19-2009
5.80
Wet sanding
Details
02-18-2009
5.60
Repaint
Details
02-17-2009
3.20
Repaint
Details
02-12-2009
3.20
Prepped left wing
Details
02-12-2009
5.40
Painted left wing.
Details
02-11-2009
5.30
Painted left wing bottom
Details
02-10-2009
3.20
Prepped left wing
Details
02-09-2009
6.20
Rt Wing
Details
12-22-2008
3.60
Left wing tip - Painted
Details
11-21-2008
7.50
Left wing top.
Details
11-20-2008
5.70
Under left wing.
Details
11-19-2008
3.80
Masking
Details
10-23-2008
3.20
Aileron & Vert Stab
Details
10-18-2008
5.00
Wing tip & rudder
Details
10-17-2008
4.00
Rudder
Details
10-16-2008
4.80
Painted ailerons
Details
10-14-2008
4.60
Repaint Flaps
Details
10-13-2008
4.00
Elevators
Details
10-11-2008
6.70
Painted elevators
Details
10-10-2008
6.50
Horizontal stabilizer
Details
10-09-2008
6.80
Sand & Paint Vetical Stabilizer.
Details
10-08-2008
3.70
Wet sanding.
Details
10-07-2008
4.50
Sanding
Details
10-06-2008
4.20
Priming
Details
10-05-2008
7.90
Priming
Details
10-04-2008
2.00
Scuffing
Details
SITE NAVIGATION
Contact Builder
RV9A Home
Category
# Logs
# Hours
All
584
2423
Assembly
17
84
Avionics
11
41
Calibration
2
6
Calibration and adju
2
8
Canopy
34
164
Cowling
49
171
Empennage
57
216
Engine
48
175
Finishing for first
30
80
Flight Testing
7
16
Fuselage
46
238
Instrument Panel
29
124
Landing gear
9
30
Miscellaneous
28
210
None
4
0
Paint
58
227
Prop
4
11
Redrive Swap
5
15
Taxi Testing
5
17
Testing
8
31
Tools
1
3
Transporting to hang
6
13
Wheel Fairings
12
52
Wings
54
250
Wiring
58
241
Copyright © 2001-2024 Matronics. All Rights Reserved.