Powered By Kitlog Pro v2.0
Carl Bells RV7A N947CB
RV 7A
Cowl and Baffle
Work Logs Found:
38
Category Work Time:
182 Hours
Date
Hours
Work Log Summary
Details
04-12-2010
5.00
Adding heat shielding to the cowl
Details
10-23-2009
3.50
Making the new hinge pin covers
10-16-2009
3.00
New hinge pin cover material
Details
10-12-2009
5.50
Cowl hinge pin covers
Details
04-03-2009
3.00
Cowl Finishing
Details
03-28-2009
4.00
Cowl oil door installation and large pin hole fill
Details
03-27-2009
3.00
Completing fabrication of oil door in cowl
Details
03-23-2009
5.00
Fiberglass work
Details
03-13-2009
5.00
Inlet rubber cowl gasket
Details
01-24-2009
5.00
Oil cooler and oil breather completion
Details
01-07-2009
4.00
Baffles
Details
01-05-2009
6.00
Baffle Mounting and Engine Wiring
Details
12-30-2008
5.00
Spinner area baffle seals
Details
12-19-2008
6.00
Riveting on the baffle seals
Details
12-15-2008
5.00
Cowl Baffle
Details
12-10-2008
4.00
Alternator and Magneto cooling tubes
Details
12-08-2008
5.00
Installing the baffle rubber seals
Details
12-06-2008
2.00
Baffle bottom retaining rods
Details
12-05-2008
4.50
Alternate air and induction mounts
Details
12-01-2008
4.00
Alternate Air
Details
11-25-2008
4.00
Heat inlet and riveting the front baffles
Details
11-18-2008
6.00
Horizontal Injection Induction System
Details
11-14-2008
6.00
More baffle work
Details
11-12-2008
6.00
Mounting the cowl hinges
Details
11-10-2008
5.00
Modifications to air induction
Details
11-03-2008
6.00
Baffles
Details
11-02-2008
4.00
Baffles
Details
10-31-2008
6.00
Baffles
Details
10-29-2008
6.00
Oil cooler installation
Details
10-27-2008
6.00
Baffles
Details
10-26-2008
5.00
Internal hinge pin removal system
Details
10-24-2008
5.00
Oil dip stick door
Details
10-22-2008
5.00
Countersinking cowl and move heater duct
Details
10-20-2008
4.00
Cowl attachment fixtures
Details
10-20-2008
3.00
Assembly of bottom cowl bracket
Details
10-19-2008
4.00
Bottom cowl support
Details
10-17-2008
6.00
Cowl Installation
Details
10-07-2008
7.00
Cowl Installation
Details
SITE NAVIGATION
Contact Builder
RV 7A Home
Category
# Logs
# Hours
All
524
2392
*Project Status*
4
1
Avionics
31
163
Canopy
50
254
Control Systems
42
211
Cowl and Baffle
38
182
Elevator
15
80
Empennage
14
60
Engine
22
76
Engine Wiring
4
19
Fiberglass Finishing
15
77
Firewall forward
21
83
Flight Testing
2
8
Fuel Tanks
1
6
Fuselage
59
291
Hanger
4
0
Horizontal Stab
11
63
Interior & Upolstery
8
30
Landing Gear
7
28
Miscellaneous
14
48
Paint
4
30
Paint Designs
6
10
Panel
28
118
Panel Design
3
4
Panel Wiring
10
40
Plumbing & Wiring
26
114
Propeller
2
4
Propeller
2
3
Rudder
7
38
Upholstery-Interior
1
1
Vertical Stabilizer
4
19
Wheel Fairings
20
100
Wings
49
231
Copyright © 2001-2024 Matronics. All Rights Reserved.