Powered By Kitlog Pro v2.0
Marks Web Site
RV-7A
Instrument Panel
Work Logs Found:
25
Category Work Time:
102 Hours
Date
Hours
Work Log Summary
Details
08-14-2009
6.00
ELT remote control panel wiring
Details
08-11-2009
1.00
Post paint instrument panel repopulation
Details
08-10-2009
1.50
Post paint instrument panel repopulation
Details
08-09-2009
8.00
Instrument panel removal and painting...
Details
08-03-2009
2.50
EFIS harness installation...
Details
06-30-2009
6.50
Autopilot installation
Details
06-05-2009
3.50
Flap position switch installation
Details
05-20-2009
7.25
Glareshield lighting wiring continued...
Details
05-15-2009
1.50
Buss switch reorientation
Details
05-13-2009
6.50
GPS and Transponder installation
Details
05-12-2009
10.75
Communications radio installation
Details
04-01-2009
6.00
Map box, park brake cable and heater control cable
Details
03-31-2009
6.75
Panel switch installation...
Details
03-29-2009
1.00
Panel switch hole drilling
Details
03-28-2009
2.50
Panel switch and indicator light holes drilled
Details
03-27-2009
1.00
Mounted lights dimmer...
Details
02-19-2009
3.25
Fabricated panel extension
Details
01-12-2009
3.00
Radio stack support installation
Details
12-04-2008
1.50
Instrument panel second display hole cut
Details
11-28-2008
5.75
Instrument panel support rib and display install
Details
10-03-2008
3.50
Instrument panel preparation
Details
10-02-2008
4.00
Radio stack installation preparations
Details
03-17-2008
1.75
Panel mounted map box installation
Details
02-08-2008
3.75
Map box installation
Details
02-06-2008
3.00
Map box preparation
Details
SITE NAVIGATION
Contact Builder
RV-7A Home
Category
# Logs
# Hours
All
606
2407
Empennage
59
221
Engine
2
7
Firewall Forward
72
350
Fuselage
260
1134
Instrument Panel
25
102
Miscellaneous
45
158
Shop Supplies
1
2
Wings
142
433
Copyright © 2001-2024 Matronics. All Rights Reserved.