Powered By Kitlog Pro v2.0
Vans RV-8 G-JBTR
RV-8 Build Log
Fuselage
Work Logs Found:
58
Category Work Time:
1120 Hours
Date
Hours
Work Log Summary
Details
03-21-2012
1120.00
Aileron Pushrod Alignment
Details
02-03-2012
0.00
Baggage Door 2
Details
01-30-2012
0.00
Another Milestone - Top Skin Riveted
Details
12-23-2011
0.00
Forward Floor Stiffeners - VERY IMPORTANT TIP
Details
12-22-2011
0.00
Pre-Floor Rivet Inspection
Details
11-04-2011
0.00
Control Bolt Clearance
Details
09-18-2011
0.00
Park Brake 3
Details
08-08-2010
0.00
Fuel and Brake Pipes 3
Details
08-05-2010
0.00
F-863 Fuselage Fuel Tank Bracket
Details
08-04-2010
0.00
Wing Drilling 2
Details
08-04-2010
0.00
Wing Drilling 1
Details
08-03-2010
0.00
Landing Gear 4 - Alignment check
Details
07-28-2010
0.00
Landing Gear 3 - Bolting
Details
04-20-2010
0.00
Rear Throttle/2 Lever Deluxe Throttle Problem 2
Details
04-15-2010
0.00
Rear Throttle/2 Lever Deluxe Throttle Problem 1
Details
04-14-2010
0.00
F-863 Fuselage Fuel Tank Brackets
Details
04-07-2010
0.00
Fuel and Brake Pipes 3
Details
03-30-2010
0.00
Baggage Door 1
Details
03-23-2010
0.00
Fuel Vent Mesh
Details
02-05-2010
0.00
Park Brake 2
Details
02-02-2010
0.50
Lack of AN470AD4-5 rivets
Details
01-29-2010
0.00
Aft Upper Skin - ran out of space
Details
01-24-2010
0.00
WD-814 Roll Bar Problem Part 2
Details
01-24-2010
0.00
WD-814 Roll Bar Problem Part 1
Details
12-30-2009
0.00
Rudder Angle
Details
12-16-2009
0.00
VS Attachment Tips
Details
12-08-2009
0.00
Fuselage - Major Milestone
Details
11-09-2009
0.00
Riveting F-817 Seatback Side Plate
Details
11-06-2009
0.00
Riveting Canopy rails
Details
11-05-2009
0.00
Fuselage Milestone
Details
10-16-2009
0.00
Riveting F-850 Bottom Skin
Details
10-09-2009
0.00
Landing Gear 2 - Drilling and Alignment
Details
10-09-2009
0.00
Landing Gear 1 - Corrosion
Details
09-27-2009
0.00
Seatback - Advice
Details
09-09-2009
0.00
Riveting the fuselage and skins upright
Details
07-08-2009
0.00
Park Brake 1
Details
06-29-2009
0.00
Fuel and Brake Pipes 2
Details
06-24-2009
0.00
Fuel and Brake Pipes 1
Details
06-03-2009
0.00
Preparing the fuselage parts for rivetting
Details
04-27-2009
0.00
Drilling WD-808 Seatback Support 3
Details
04-27-2009
0.00
Drilling WD-808 Seatback Support 2
Details
04-27-2009
0.00
Drilling WD-808 Seatback Support 1
Details
04-10-2009
0.00
Tailcone to Forward Fuselage
Details
04-09-2009
0.00
Tailcone Bulkheads
Details
03-24-2009
0.00
My Mum
Details
03-16-2009
0.00
Rolling F-823 Skin
Details
03-02-2009
0.00
Longeron Bending
Details
02-23-2009
0.00
Seat Rib Assembly
Details
01-28-2009
0.00
Centre Section
Details
01-27-2009
0.00
Rear Rudder Pedal Kit 1
Details
01-22-2009
0.00
F-804G Vertical Bar
Details
01-12-2009
0.00
Forward Fuselage Assembly
Details
11-23-2008
0.00
Forward Fuselage Floor
Details
11-19-2008
0.00
Forward Floor
Details
11-17-2008
0.00
Firewall
Details
11-06-2008
0.00
Centre/Middle Angle Nutplates
Details
10-24-2008
0.00
RV-8 Pre-Punched Fuselage
Details
09-11-2008
0.00
Fuselage Box Arrives
Details
SITE NAVIGATION
Contact Builder
RV-8 Flying Log Home
RV-8 Build Log Home
Category
# Logs
# Hours
All
346
4096
Avionics
12
Electrics
22
300
Empennage
13
400
Engine
2
0
Fibreglass
55
460
Finish
17
Firewall Forward
32
280
Freight
1
Fuselage
58
1120
Inspiration
6
Miscellaneous
2
3
Paint
5
Panel
8
Primer
2
1
Prop
2
Registration
2
1
Research
3
375
Safety
1
27
Smoke System
5
100
Support
2
Test Phase
4
6
The Big Move
3
4
Tips
10
Tools
13
2
Upholstery
2
Wings
49
808
Workshop
8
57
Wrap Up
7
152
Copyright © 2001-2024 Matronics. All Rights Reserved.