KitLog pro

Powered By Kitlog Pro v2.0

Patto Web Site
Work Logs Found: 92
Category Work Time: 319 Hours
 Date
Hours
Work Log Summary

Details

 10-28-2012
3.00
Installing the steps.
Details
       

 01-08-2012
4.00
Fitting canopy lock.
Details
       

 12-15-2010
5.00
Oil dipstick access cover - top cowl
Details
       

 12-09-2010
1.50
Oil dipstick access cover - start on firewall layo
Details
       

 12-06-2010
1.50
Oil dipstick cover - top cowling
Details
       

 12-05-2010
2.00
Flipping the plane back upright - more sanding and
Details
       

 12-04-2010
2.00
Preparing the underside of the fuselage.
Details
       

 12-03-2010
3.00
Filling and sanding all around.
Details
       

 12-02-2010
2.00
Opera windows & general fuse prep
Details
       

 11-28-2010
3.00
Oil access cover and opera window
Details
       

 11-27-2010
4.50
Fitting the two opera windows
Details
       

 11-23-2010
3.00
Making the baggage shelf
Details
       

 11-22-2010
2.00
Baggage area floor supports
Details
       

 11-20-2010
3.00
Stage one of baggage area shelf
Details
       

 10-08-2010
2.00
Sanding & Filling .....
Details
       

 10-07-2010
1.00
Top cowling camlok receivers
Details
       

 10-05-2010
1.00
Fitting nutplates to main gear wheel pants.
Details
     

 10-04-2010
1.50
Fitting nut plates to wheel pants
Details
     

 10-02-2010
8.00
Main gear fairings and pants.
Details
       

 10-01-2010
2.00
Air intake duct work.
Details
       

 09-30-2010
2.00
Fitting air inlet ducts.
Details
       

 09-27-2010
7.00
Fitting main gear leg fairings.
Details
       

 09-26-2010
2.00
Making a start on the main gear leg fairings.
Details
       

 07-10-2010
8.00
General work and lots more sanding!
Details
       

 07-09-2010
3.00
Cowl fitting and general sanding.
Details
       

 07-05-2010
4.00
Fitting cowl nutplates - general filling and sandi
Details
       

 07-03-2010
6.00
Final fit of the engine cowls.
Details
       

 06-27-2010
3.00
Reinforcing the back edge of t top & bottom cowls
Details
       

 06-26-2010
8.00
General canopy and fuselage sanding.
Details
       

 06-24-2010
3.00
Centre & Fuel consoles
Details
       

 06-20-2010
7.00
Canopy and general work
Details
       

 06-12-2010
7.00
First fit of the engine cowls.
Details
       

 06-11-2010
2.00
Changing the prop flange to the 2" extended flange
Details
       

 06-01-2010
1.00
Lock-wiring main gear assemblies
Details
       

 05-31-2010
4.50
Nose gear prep.
Details
       

 05-28-2010
3.00
Prep for fitting gear.
Details
       

 05-26-2010
4.00
Engine arrives!
Details
       

 05-17-2010
1.00
More sanding and filling underneath ....
Details
       

 05-15-2010
2.00
Fitting the tail tie-down eyebolt - and filling ..
Details
       

 05-02-2010
1.00
Centre console brackets and side seat rails.
Details
       

 05-01-2010
8.00
Fitting centre console & seats.
Details
       

 04-30-2010
2.00
Lowering braces
Details
       

 04-27-2010
4.00
Lowering the spar box rear braces.
Details
       

 05-09-2009
4.40
Rudder pedal assembly, brakes and mounts
Details
       

 05-08-2009
1.00
Making spacers and fitting the last spar box bolt.
Details
       

 05-07-2009
3.00
More spar box work
Details
       

 05-06-2009
2.00
Finishing work on the spar box instal & engine mou
Details
       

 04-20-2009
3.00
More work on the canopy - then canopy removal.
Details
     

 04-10-2009
4.00
Canopy trim work
Details
       

 04-09-2009
5.00
Finishing and fitting of the canopy latch
Details
       

 03-29-2009
2.50
Removal & refit of canopy with panel and edge seal
Details
       

 03-28-2009
7.00
Bonding of the skins to the canopy.
Details
       

 03-27-2009
6.00
Prep for attaching canopy skins
Details
       

 03-14-2009
12.00
Canopy skin trimming & engine mount positioning
Details
       

 03-07-2009
12.00
Making pedal supports and more canopy skin work.
Details
       

 03-01-2009
2.00
Making the upper canopy catch striker plate.
Details
       

 02-28-2009
6.00
Continued canopy skin work
Details
       

 02-27-2009
1.00
Extending canopy skins
Details
       

 02-24-2009
2.50
First fit of canopy skins
Details
       

 02-22-2009
1.00
Finishing the inside canopy to frame joint
Details
       

 02-21-2009
1.00
Fitting canopy part 1
       

 02-20-2009
3.00
Preparing to affix canopy to frame
Details
       

 02-19-2009
5.00
Preparing the frame & canopy
Details
       

 01-22-2009
0.50
First peel of the protective coat from the canopy
Details
       

 01-21-2009
1.00
Finishing the inside canopy to frame joint
       

 12-20-2008
2.00
More canopy frame and fuse finishing
Details
     

 12-19-2008
4.00
Trimmed canopy!
Details
       

 12-17-2008
10.00
Canopy Frame Fitting
Details
       

 12-07-2008
5.00
General filling & cutting through panel for canopy
Details
       

 12-06-2008
4.00
Moving toward canopy mounting
Details
       

 11-29-2008
5.00
Finished and fitted gas strut brackets to top of p
Details
       

 11-28-2008
1.50
Making the brackets to hold the canopy gas struts
Details
       

 11-26-2008
3.50
Trial fitted panel and located side brackets
Details
     

 11-20-2008
1.50
Fitted steps
Details
       

 11-15-2008
10.00
More sanding .. sanding .. sanding
Details
       

 11-06-2008
0.50
Rolling aircraft - first aerobatic manouver!
Details
       

 10-22-2008
1.00
Fitting canopy locating tangs
Details
       

 10-15-2008
2.00
Making up canopy locating tangs
Details
       

 10-05-2008
2.00
Trial fitted the canopy hinge to frame
Details
       

 10-04-2008
2.00
Further work on canopy hinge brackets
Details
       

 09-20-2008
2.00
Peter T & canopy hinges
Details
       

 09-19-2008
6.00
Fitting new design canopy frame brackets
Details
       

 09-18-2008
5.00
Canopy frame fitting day 3
Details
       

 09-17-2008
1.50
Fixing canopy hinge brackets to bulkhead
Details
       

 09-16-2008
2.50
Made up forward canopy hinge brackets
Details
       

 09-07-2008
2.00
Canopy frame fitting day 2
Details
       

 09-06-2008
2.50
Canopy frame fitting day 1
Details
       

 09-03-2008
3.00
Preparing canopy frame
Details
       

 09-01-2008
0.50
Mounted rudder cable guides in spar box
Details
     

 08-30-2008
4.00
Prepare to mount spar boxes
Details
       

 08-23-2008
3.00
Cut opera window openings
Details
       

 08-19-2008
1.00
Sanding fuselage
Details
       










Copyright © 2001-2024 Matronics. All Rights Reserved.