KitLog pro

Powered By Kitlog Pro v2.0

Ralph Finch RV-9A Build
Work Logs Found: 114
Category Work Time: 324 Hours
 Date
Hours
Work Log Summary

Details

 05-12-2010
4.00
Wing tip stiffener, fuel tank access covers
Details
       

 05-07-2010
2.00
Proseal fuel tank access covers
Details
       

 05-05-2010
2.00
Fuel tank access cover plates
Details
       

 04-25-2010
4.00
Install pitot tube support
Details
       

 02-15-2010
1.00
Fuel float senders
Details

 01-18-2010
2.00
Installed Bob Archer VOR antenna
Details
       

 01-16-2010
4.00
More work on right wing tip.
Details
       

 01-13-2010
1.00
Finished dimpling left bottom wing panel
Details
       

 01-13-2010
2.50
Drilled, deburred, dimpled right bottom wing panel
Details
       

 01-13-2010
0.50
Added remaining nutplates, ground rivet heads
Details
     

 01-12-2010
1.00
Started dimpling bottom wing panel
Details

 01-11-2010
0.80
Finished deburring one bottom wing panel
Details
     

 01-10-2010
3.00
Cleaned garage, moved wing, started deburring
Details

 01-06-2010
1.50
Riveted nutplates to lamp bracket
Details
       

 01-04-2010
1.00
Dimpled skin, attached rivet strip plate
Details
     

 01-03-2010
2.00
Primed some parts, riveted
Details

 01-02-2010
3.50
More work on landing light
Details

 01-01-2010
4.00
More work on Duckworks landing light
Details
     

 12-31-2009
1.00
moved wing, prepared for duckworks cut
Details

 12-29-2009
1.00
Cut openings in wing tip for LED heatsinks
Details

 12-27-2009
0.50
Epoxied remaining nav LEDs to other plexi
Details

 12-26-2009
2.00
Drilled mirrored plexi, started epoxy attachment
Details

 12-24-2009
2.00
Fit mirror plexi and lens cover right wing tip
Details

 12-09-2009
3.00
APRS antenna, more epoxy
Details

 12-05-2009
1.00
Epoxied LED nav light assy
Details

 12-02-2009
1.00
Epoxied one of the LED nav light assemblies

 11-15-2009
4.00
More wingtip/nav light work.
Details

 09-29-2009
1.50
Finished attaching wingtip.
Details

 09-28-2009
1.50
Continued riveting nutplates
Details

 09-19-2009
2.00
Finished countersinking wing tip holes....
Details

 09-18-2009
4.00
Finished left wing tip, returned to right wing tip
Details

 09-16-2009
4.00
Began squeezing rivets to attach nutplates.
Details

 09-15-2009
1.00
Countersink wing tip for rivets
Details

 09-14-2009
1.00
2/2 Drilling for nutplates
       

 09-14-2009
1.00
1/2 Drilling for nut plates
Details
       

 09-13-2009
6.00
Continued with aluminum backing strips
Details
       

 09-12-2009
5.00
Work on wing tips
Details
       

 09-07-2009
5.00
Fixed mistake with wing tip rib
Details
       

 09-06-2009
4.00
@!#%!& wing tip rib W-916
Details

 09-05-2009
5.00
Epoxied other wing tip, riveted wing tip rib.
Details
       

 09-01-2009
1.00
Finished epoxying one wing tip.
Details
     

 08-30-2009
4.00
Started epoxying back together the wing tip ends.
Details

 08-26-2009
5.00
Cut ends of wing tips; continued fitting

 08-25-2009
1.50
Finished fitting/drilling holes for left wing tip

 08-23-2009
3.00
Clecoed and drilled left wing bottom skin

 08-22-2009
4.00
Clecoed and drilled right wing bottom skin

 08-21-2009
3.00
Continue fitting wing tip ribs

 08-19-2009
3.00
Continued with W-916 and W-938 wing tip ribs

 08-17-2009
2.00
Fitted/drilled right wing tip rib W-916.

 08-16-2009
4.00
Continued wing tip rib.
Details
     

 08-15-2009
4.00
Started wing tip rib; cleaned garage, moved wings
Details

 08-14-2009
4.00
Finish fitting right wing tip
Details
     

 08-12-2009
4.00
Begin fitting of right wing fiberglass tip
Details

 08-09-2009
4.00
Fit fiberglass wing tip
Details
       

 07-29-2009
2.00
Continued pitot tube support bracket
Details

 07-26-2009
3.00
Continued pitot tube support bracket
Details
       

 07-24-2009
2.00
Pitot tube support bracket
Details

 07-08-2009
3.00
Riveted right wing aileron gap fairing

 07-04-2009
2.00
Aileron bracket rivets and pitot tube mast.
Details
       

 07-03-2009
2.00
Worked on pitot tube
Details
     

 06-28-2009
3.00
Drilled out bad rivets and re-riveted.
Details

 06-27-2009
2.00
Fitted roll servo mounting kit to aileron bracket
Details
     

 06-25-2009
1.00
Roll autopilot bracket; removed old bracket

 06-21-2009
4.00
Drill out more bad rivets, redo. Prep wing tip rib
Details

 06-20-2009
1.00
Cleaned and primed aileron gap fairings.

 06-17-2009
5.00
Aileron gap fairing, drilled out bad rivets.
Details

 06-14-2009
4.00
Right wing flap gap, fixes
Details

 06-12-2009
2.00
Right wing flap gap: dimpled, removed ailerons

 06-10-2009
4.00
More gap work
Details

 06-07-2009
4.00
Riveted left flap gap fairing to wing.

 06-06-2009
2.00
scotch brited, cleaned, and primed left wing flap

 06-05-2009
1.00
Finished dimpling left wing and flap gap fairing

 06-03-2009
1.00
Deburred, started dimpling left flap gap fairing
     

 05-30-2009
4.00
Started flap gap fairing
       

 04-22-2009
1.00
Cut out holes for left wing strobe light in mirror

 04-18-2009
4.00
Finished left wing landing light, screwed in lens

 04-08-2009
6.00
Finishing up left Duckworks Landing Light
       

 04-05-2009
4.00
Drilled lens holes, ctrsnk, dimpled holes in LE

 03-30-2009
1.00
Smoothed edges of landing light cover

 03-29-2009
6.00
Continue Duckworks LL: ctrsnk and riveted nutplate

 03-28-2009
2.00
Duckworks LL-finished riveting nutplates to ribs

 03-27-2009
2.00
Duckworks LL

 03-26-2009
2.00
Duckworks LL

 03-25-2009
6.00
Duckworks landing light

 03-07-2009
6.00
More nav light work
Details

 03-06-2009
6.00
Cut, sand left wing tip lens, mirror plexi
Details

 02-20-2009
2.00
Finished conduit in right wing
Details

 02-16-2009
4.00
Work on right wing aileron pushrod, conduit
Details

 02-14-2009
2.00
Adjusted aileron
Details

 02-08-2009
3.00
Continued aileron brackets
Details

 02-06-2009
2.00
Work on aileron attach brackets
Details

 02-01-2009
1.00
Finished one of the brackets
Details

 01-31-2009
4.00
Aileron attach brackets
Details

 01-24-2009
2.00
Conduit, aileron hinge brackets
Details

 12-13-2008
4.00
Finished conduit hangars
Details

 12-10-2008
2.00
Began conduit install
Details
       

 11-30-2008
2.00
Conduit;cut hole in rib
Details

 11-23-2008
2.00
Adjusted aileron
Details

 11-14-2008
4.00
Riveted aileron attach brackets to wing
Details

 10-13-2008
6.00
Riveted together pieces for aileron attach bracket
Details

 10-09-2008
2.00
Attached left aileron attach brackets
Details

 10-08-2008
6.00
Finished parts for W-913 and W-914 attach brackets
Details

 10-06-2008
1.50
Cleaned ailerons, flaps

 10-05-2008
3.00
Finished right aileron bellcrank assy

 10-04-2008
6.00
Finished left wing aileron bellcrank assy
Details

 10-02-2008
1.00
Found bellcrank parts, reamed brass bushings
Details

 10-01-2008
2.00
Redid two rivets, taped pushrods
Details

 09-28-2008
2.00
Prepped and Riveted bellcrank to aileron pushrods
Details

 09-24-2008
3.00
Started aileron bellcrank to aileron pushrod
Details

 09-21-2008
6.00
Finished aileron stick-to-bellcrank pushrods
Details

 09-14-2008
4.00
Cut and finished aileron-stick pushrods
Details

 09-10-2008
4.00
Wing on table, primed aileron pushrods
Details
       

 09-03-2008
1.00
Finished cleaning wings and fuse

 09-01-2008
2.00
Finished storing emps and started cleaning wings.
Details










Copyright © 2001-2024 Matronics. All Rights Reserved.