Powered By Kitlog Pro v2.0
Marlins Web Site
RV-7A
Engine
Work Logs Found:
37
Category Work Time:
246 Hours
Date
Hours
Work Log Summary
Details
06-20-2024
3.00
Sniffle Valve Drain Line
Details
06-12-2024
2.00
Battery Hold-Down & Alternator Safety Wire
Details
02-10-2023
3.00
Install Engine Filter Bypass/Alternate Air Cable
Details
02-09-2023
4.00
Install Oil Cooler
Details
02-06-2023
16.00
Install Engine EGT & CHT Sensors (Cont.)
Details
02-01-2023
3.00
Install Engine EGT & CHT Sensors (Cont.)
Details
01-30-2023
18.00
Install Engine EGT & CHT Sensors
Details
01-27-2023
6.00
Install Cabin Heat Muff and Tubing (Cont.)
Details
01-26-2023
6.00
Install Cabin Heat Muff and Tubing
Details
01-25-2023
6.00
Install Air/Water Separator Drain Hoses & Fuel Pum
Details
12-01-2022
6.00
Installing the VA-132 Air Injection Snorkel (Cont.
Details
11-30-2022
3.00
Installing the VA-132 Air Injection Snorkel (Cont.
Details
11-28-2022
3.00
Installing the VA-132 Air Injection Snorkel
Details
04-22-2022
4.00
Installing the Vetterman Crossover Exhaust (Cont.)
Details
04-21-2022
5.00
Installing the Vetterman Crossover Exhaust
Details
04-21-2022
5.00
Fabricating a Throttle Control Mounting Bracket
Details
04-20-2022
3.00
Remove Throttle Control Assembly
Details
11-05-2021
5.00
Installed New Electrical Boots & Engine Ground
Details
10-15-2021
12.00
Fuel Pump Cooling Shroud/Fuel Flow Sensor Install
Details
10-05-2021
9.00
Install Fuel Injection Servo, & Mixture Linkages
Details
09-30-2021
8.00
FabricateThrottle and Mixture Brackets
Details
09-20-2021
7.00
Mounting the Engine
Details
09-15-2021
8.00
Preparation for Hanging the Engine
Details
07-10-2020
2.00
Installed Desiccant Plugs
Details
06-15-2020
26.00
Reconditioned & Painted Intake and Starter
Details
05-20-2020
5.00
Time to uncrate the Engine
Details
12-06-2018
8.00
Manifold Pressure Fitting & Prep Aft Fuselage Skin
Details
12-05-2018
4.00
Firewall Forward Prior to Closing Front Deck (cont
Details
12-04-2018
6.00
Firewall Forward Prior to Closing Front Deck
Details
11-30-2018
8.00
Install Filtered Air Bypass Control Cable
Details
11-29-2018
8.00
Install Engine Control Cables Continued
Details
11-28-2018
8.00
Install Engine Controls
Details
11-27-2018
12.00
Installed Cabin Heat Inlet Valve and Control
Details
03-30-2018
5.00
Installed ACS Ignition Switch Wiring
Details
12-09-2017
4.00
Removed oil and fuel pressure sending units from c
Details
07-26-2017
4.00
Installed the Engine/Nosewheel Landing Gear Mount
Details
08-10-2008
1.00
Recieived XIO-360-M1B Lycoming 180 hp Engine
Details
SITE NAVIGATION
Contact Builder
RV-7A Home
Category
# Logs
# Hours
All
715
6057
Avionics
18
273
Cockpit Upholstery
2
13
Constant Speed Prop
14
92
Controls
26
155
Cowling
58
448
Electrical System
87
1087
Empennage
80
692
Engine
37
246
Engine Air-Baffles
50
344
Firewall Forward
6
60
Fuselage
71
368
Hangar
10
22
Hanger
10
22
Instrument Panel
19
226
IO360-M!B Engine
4
67
Landing Gear
18
228
None
8
59
Ops Manuals
2
77
Pitot-Static System
6
55
Prop
3
2
Quickbuild fuselage
6
2
Shop, Supplies, and
9
50
Sliding Canopy
39
378
Wheel Pants/Fairings
23
312
Wheels
10
67
Wheels & Brakes
10
67
Windshield/Roll Bar
11
112
Wings
69
483
Workshop & Tools
9
50
Copyright © 2001-2025 Matronics. All Rights Reserved.