Powered By Kitlog Pro v2.0
Jeff Mitchell's RV8 project
RV-8
Fuel Tanks
Work Logs Found:
54
Category Work Time:
190 Hours
Date
Hours
Work Log Summary
Details
09-06-2010
1.80
Cut bolt slots in T-405 brackets.
Details
02-21-2009
1.00
Sealed small leak in left hand fuel tank.
Details
01-22-2009
2.00
Pressure tested right hand fuel tank.
Details
01-17-2009
4.50
Finished right hand fuel tank.
Details
01-15-2009
2.80
Final preparations for right tank access plate.
Details
01-08-2009
3.50
Sealed right tank span wise shop heads.
Details
01-05-2009
3.50
Right tank access plate.
Details
01-04-2009
6.90
Installed right tank rear baffle and Z-Brackets.
Details
01-03-2009
4.00
Setup right hand fuel sender.
Details
01-02-2009
5.00
Right tank vent and vapour return line.
Details
01-01-2009
5.50
Right tank end ribs and sealed shop heads.
Details
12-31-2008
5.00
Riveted right fuel tank inner ribs.
Details
12-28-2008
4.50
Fay sealed the right tank inner ribs in place.
Details
12-27-2008
4.80
Riveted and sealed right tank stiffeners.
Details
12-26-2008
2.50
Preparation for right hand tank sealing.
Details
10-05-2008
1.30
Pressure tested the left hand fuel tank.
Details
09-24-2008
4.00
Finished left fuel tank.
Details
09-23-2008
4.90
Riveted left tank rear baffle.
Details
09-22-2008
4.90
Left tank rear baffle and Z-Brackets.
Details
09-21-2008
4.50
Fabricated corner fillers and more prep work.
Details
09-20-2008
5.30
Final preparations for tank baffle installation.
Details
09-18-2008
2.90
Sealed and riveted outer and inner tank ribs.
Details
09-17-2008
5.00
Sealed outer and inner most left hand tank ribs.
Details
09-16-2008
1.60
Left tank vapour return line.
Details
09-15-2008
2.90
Left tank fuel vent line and fittings.
Details
09-12-2008
3.30
Finished left tank Anti-Hang ups.
Details
09-10-2008
2.50
Tank anti hang up and float sender wire.
Details
09-06-2008
3.50
Riveted inner ribs of left hand fuel tank.
Details
09-06-2008
3.60
Finished riveting the left tank inner ribs.
Details
09-04-2008
3.10
Fay sealed left tank inner ribs.
Details
09-03-2008
2.00
Riveted the left fuel cap flange and drain.
Details
09-03-2008
3.30
Back riveted left tank stiffeners.
Details
09-02-2008
1.90
Left tank skin preparations for sealant.
Details
09-01-2008
2.80
Fuel cap flange (again) and vent clip.
Details
08-31-2008
5.70
Deburred and dimpled left tank skins and ribs.
Details
08-30-2008
4.50
Fuel sender doubler, fuel cap and low point drain.
Details
08-29-2008
2.50
Inverted fuel system sender installation.
Details
08-29-2008
5.00
Fuel tank trap door.
Details
08-28-2008
3.10
Worked on Tank Access Plates.
Details
08-27-2008
5.50
Worked on Fuel Tank access plates.
Details
08-26-2008
5.90
Fabricated T-405 and T-410 bracket / plate.
Details
08-25-2008
3.60
T-405 Tank Bracket (Prototype-1).
Details
08-24-2008
4.00
L/H joint plate, baffle and tank screw holes.
Details
08-24-2008
2.50
Fixed the gap between tank and leading edge.
Details
08-22-2008
2.90
Match drilled tank and back drilled 2 Z-Brackets.
Details
08-19-2008
0.70
Fabricated L/H T-405 tank bracket.
Details
08-17-2008
1.00
Cleco left hand tank skin to ribs.
Details
08-15-2008
2.00
Started on T-405 tank attach angle bracket.
Details
08-14-2008
4.00
Cut and deburred T-711 tank stiffeners.
Details
08-13-2008
3.40
Riveted Z-Bracket nut plates.
Details
08-13-2008
2.00
Bolted Z-Brackets to spar and marked stiffeners.
Details
08-12-2008
5.20
Drilled left wing fuel tank Z-Brackets and primed.
Details
08-11-2008
4.50
Drilled left wing fuel tank Z-Brackets.
Details
08-10-2008
1.50
Marked Tank Z-Brackets.
Details
SITE NAVIGATION
Contact Builder
RV-8 Home
Category
# Logs
# Hours
All
1018
4065
Ailerons
25
84
Avionics
64
344
Empennage
118
324
Engine
4
17
Firewall Forward
61
308
Flaps
11
51
Fuel Tanks
54
190
Fuselage
457
1889
Misc Pics
6
4
Miscellaneous
26
215
Pics of me building
6
4
Prop
2
11
Tools
12
10
Training Kits
8
24
Wings
153
557
Workshop Setup
11
33
Copyright © 2001-2024 Matronics. All Rights Reserved.