Powered By Kitlog Pro v2.0
KENNETH T.'S WEB SITE
RV-7A
Engine
Work Logs Found:
50
Category Work Time:
228 Hours
Date
Hours
Work Log Summary
Details
08-17-2013
3.50
Engine "First Start"!
Details
08-04-2013
6.00
Installed the Whirlwind 200RV prop.
Details
05-29-2013
5.50
Drained preservitive oil and moved quick drain.
Details
05-28-2013
5.50
Finished scat hose install & worked on cowl.
Details
05-27-2013
5.50
Reinstalling engine stuff.
Details
05-26-2013
7.00
Fabricated baffle tension rods.
Details
05-21-2013
5.00
Installed engine parts.
Details
05-20-2013
5.50
Started adding/replacing engine parts remove for p
Details
04-05-2013
4.00
Worked on forward baffles.
Details
03-15-2013
3.00
Molded an engine plenum out of fiberglass.
Details
03-02-2013
5.00
Made the last (I hope) baffle cuts.
Details
02-28-2013
4.00
First cuts on the baffles.
Details
02-27-2013
4.00
More baffling measurements.
Details
01-21-2013
4.00
Air filter bypass door installed on snorkle.
Details
12-06-2012
4.00
Finished attaching the snorkle flanges.
Details
11-24-2012
4.00
Contiuing snorkle madness.
Details
11-19-2012
2.00
Started on snorkle for forward induction.
Details
10-27-2012
5.00
Installed prop to get spinner/cowling gap.
Details
10-26-2012
5.00
EGT & CHT wires routed & Sniffle valve plumbed.
Details
10-10-2012
4.00
Fabricated the P-Mag ignition wires and routed.
Details
10-04-2012
4.00
Cut the baffle holes for the ignition wire seals.
Details
10-03-2012
4.00
Routed magneto ignition wires.
Details
09-20-2012
8.00
Wired magneto & P-Mag electronic ignition.
Details
09-12-2012
6.00
Wired starter and alternator.
Details
09-07-2012
4.00
More wiring and hose installations.
Details
08-28-2012
4.00
Hose and wire routing iterations.
Details
08-24-2012
4.00
Discovered I had the wrong heat muff.
Details
08-23-2012
6.00
Fabricated a throttle cable bracket.
Details
08-20-2012
4.00
Installed sniffle valve.
Details
08-18-2012
4.00
Started installing parts on the engine.
Details
08-17-2012
4.00
We hung the engine today.
Details
08-15-2012
3.00
Tried fitting oil cooler hoses.
Details
08-11-2012
4.00
Installed #1 baffle & fitted right air ramp.
Details
08-09-2012
6.00
Started #3 cylinder aft and side baffles.
Details
08-08-2012
6.00
Installed #3 Aft baffle with mid engine bracket.
Details
08-06-2012
7.00
Riveted oil cooler baffle/doubler & installed.
Details
08-05-2012
5.00
Added angles to oil cooler fabrication.
Details
08-04-2012
6.00
Cut air hole into the oil cooler baffle/doubler.
Details
07-30-2012
4.00
Started install of baffle kit.
Details
07-27-2012
2.00
Installed Jihostroj govenor.
Details
07-26-2012
2.00
Sorted out baffle kit.
Details
07-23-2012
4.00
Installed bracket onto Jihostroj governor.
Details
07-20-2012
4.00
Removed engine from stand to sawhorses.
Details
07-02-2010
2.00
Second engine preservation and prop arrived.
Details
05-03-2010
2.50
Need an alternate throttle cable FW penetration.
Details
09-08-2009
6.00
Fabricated adapter for engine stand.
Details
06-10-2009
6.00
Hang engine to verify FW penetration locations.
Details
06-09-2009
6.50
Install engine mount & temporarily hang engine.
Details
03-23-2009
4.00
Mattituck TMX IO-360 arrives.
Details
07-17-2008
5.00
Finished Step drilling and drilled gear socket hol
Details
SITE NAVIGATION
Contact Builder
RV-7A Home
Category
# Logs
# Hours
All
720
3309
Avionics
40
188
Cowling
11
54
Electrical System
113
524
Empennage
68
306
Engine
50
228
Fuselage
195
867
Instrument Panel
33
164
Miscellaneous
120
581
Wings
90
397
Copyright © 2001-2024 Matronics. All Rights Reserved.