KENNETH T.'S WEB SITE
Work Logs Found: 50
Category Work Time: 228 Hours
 Date
Hours
Work Log Summary

Details

 08-17-2013
3.50
Engine "First Start"!
Details
       

 08-04-2013
6.00
Installed the Whirlwind 200RV prop.
Details
       

 05-29-2013
5.50
Drained preservitive oil and moved quick drain.
Details
       

 05-28-2013
5.50
Finished scat hose install & worked on cowl.
Details
       

 05-27-2013
5.50
Reinstalling engine stuff.
Details
       

 05-26-2013
7.00
Fabricated baffle tension rods.
Details
       

 05-21-2013
5.00
Installed engine parts.
Details
       

 05-20-2013
5.50
Started adding/replacing engine parts remove for p
Details
       

 04-05-2013
4.00
Worked on forward baffles.
Details
       

 03-15-2013
3.00
Molded an engine plenum out of fiberglass.
Details
       

 03-02-2013
5.00
Made the last (I hope) baffle cuts.
Details
       

 02-28-2013
4.00
First cuts on the baffles.
Details
       

 02-27-2013
4.00
More baffling measurements.
Details
       

 01-21-2013
4.00
Air filter bypass door installed on snorkle.
Details
       

 12-06-2012
4.00
Finished attaching the snorkle flanges.
Details
       

 11-24-2012
4.00
Contiuing snorkle madness.
Details
       

 11-19-2012
2.00
Started on snorkle for forward induction.
Details

 10-27-2012
5.00
Installed prop to get spinner/cowling gap.
Details
       

 10-26-2012
5.00
EGT & CHT wires routed & Sniffle valve plumbed.
Details
       

 10-10-2012
4.00
Fabricated the P-Mag ignition wires and routed.
Details
       

 10-04-2012
4.00
Cut the baffle holes for the ignition wire seals.
Details
       

 10-03-2012
4.00
Routed magneto ignition wires.
Details
       

 09-20-2012
8.00
Wired magneto & P-Mag electronic ignition.
Details
       

 09-12-2012
6.00
Wired starter and alternator.
Details
       

 09-07-2012
4.00
More wiring and hose installations.
Details
       

 08-28-2012
4.00
Hose and wire routing iterations.
Details
       

 08-24-2012
4.00
Discovered I had the wrong heat muff.
Details
       

 08-23-2012
6.00
Fabricated a throttle cable bracket.
Details
       

 08-20-2012
4.00
Installed sniffle valve.
Details
       

 08-18-2012
4.00
Started installing parts on the engine.
Details
       

 08-17-2012
4.00
We hung the engine today.
Details
       

 08-15-2012
3.00
Tried fitting oil cooler hoses.
Details
     

 08-11-2012
4.00
Installed #1 baffle & fitted right air ramp.
Details
       

 08-09-2012
6.00
Started #3 cylinder aft and side baffles.
Details
       

 08-08-2012
6.00
Installed #3 Aft baffle with mid engine bracket.
Details
       

 08-06-2012
7.00
Riveted oil cooler baffle/doubler & installed.
Details
       

 08-05-2012
5.00
Added angles to oil cooler fabrication.
Details
       

 08-04-2012
6.00
Cut air hole into the oil cooler baffle/doubler.
Details
       

 07-30-2012
4.00
Started install of baffle kit.
Details
       

 07-27-2012
2.00
Installed Jihostroj govenor.
Details
       

 07-26-2012
2.00
Sorted out baffle kit.
Details
       

 07-23-2012
4.00
Installed bracket onto Jihostroj governor.
Details
       

 07-20-2012
4.00
Removed engine from stand to sawhorses.
Details
       

 07-02-2010
2.00
Second engine preservation and prop arrived.
Details
       

 05-03-2010
2.50
Need an alternate throttle cable FW penetration.
Details

 09-08-2009
6.00
Fabricated adapter for engine stand.
Details
       

 06-10-2009
6.00
Hang engine to verify FW penetration locations.
Details
       

 06-09-2009
6.50
Install engine mount & temporarily hang engine.
Details
       

 03-23-2009
4.00
Mattituck TMX IO-360 arrives.
Details
       

 07-17-2008
5.00
Finished Step drilling and drilled gear socket hol
Details
       