Date
|
Hours
|
Work Log Summary
|
Details
|
06-19-2013
|
4.00
|
Still waiting for windshield advice.
|
Details
|
|
|
06-18-2013
|
5.50
|
Trying to fit windshield.
|
Details
|
|
|
06-15-2013
|
6.50
|
Finished forward top skin riveting.
|
Details
|
|
|
06-08-2013
|
5.00
|
Started riveting the forward top skin.
|
Details
|
|
|
06-07-2013
|
5.00
|
Prepaired forward top skin for riveting.
|
Details
|
|
|
06-23-2012
|
2.00
|
Worked on nose wheel pant brackets.
|
Details
|
|
|
06-05-2012
|
7.00
|
Removed Airflow pump to add Flaretite seals.
|
Details
|
|
|
06-03-2012
|
4.00
|
Installed main gear legs and wheels.
|
Details
|
|
|
06-01-2012
|
4.00
|
Pulled wires for fuel quantity senders.
|
Details
|
|
|
05-30-2012
|
3.00
|
Tubes and tires installed to main wheels.
|
Details
|
|
|
05-29-2012
|
9.00
|
Main landing gear wheels & brakes.
|
Details
|
|
|
02-17-2012
|
4.00
|
Fabricated tail tie down and installed wing tie do
|
Details
|
|
|
06-11-2011
|
2.50
|
Repaired Forest-of-tabs ground block.
|
Details
|
|
|
06-10-2011
|
4.00
|
Finished riveting and attaching removed parts.
|
Details
|
|
|
06-09-2011
|
6.00
|
Riveted foil to the FW.
|
Details
|
|
|
06-08-2011
|
5.00
|
Continued with SS foil cutting/drilling.
|
Details
|
|
|
06-07-2011
|
6.00
|
Marking and drilling holes in the foil.
|
Details
|
|
|
06-06-2011
|
6.00
|
Begin FW insulation job.
|
Details
|
|
|
06-04-2011
|
4.00
|
Removed FW items in prep to insulate.
|
Details
|
|
|
06-03-2011
|
3.50
|
Installed SafeAir1 FW penetration kit.
|
Details
|
|
|
06-02-2011
|
3.00
|
Fabricated supports for cables.
|
Details
|
|
|
06-01-2011
|
4.50
|
Made FW penetration for cabin heat cable.
|
Details
|
|
|
05-31-2011
|
3.50
|
Continued subpanel angle install.
|
Details
|
|
|
05-30-2011
|
4.00
|
Temporarily installed throttle, prop, mixture, and
|
Details
|
|
|
09-10-2010
|
8.00
|
Drilled holes for connectors and wire passage.
|
Details
|
|
|
10-12-2009
|
3.00
|
Removed plastic protection from canopy.
|
Details
|
|
|
10-01-2009
|
3.00
|
Sanded epoxy to remove bubbles than added another
|
Details
|
|
|
09-30-2009
|
4.00
|
Sanded, primed, and epoxied the rear skirt.
|
Details
|
|
|
09-29-2009
|
3.00
|
Sanded rear skirt and touch-up pinholes with fille
|
Details
|
|
|
09-28-2009
|
6.00
|
Finished riveting side skirts and epoxied rear ski
|
Details
|
|
|
09-27-2009
|
6.50
|
Riveted canopy plexiglass to frame.
|
Details
|
|
|
09-26-2009
|
6.00
|
Painted canopy frame and cover strips.
|
Details
|
|
|
09-25-2009
|
7.00
|
Made tool then sanded and primed rear skirt.
|
Details
|
|
|
09-24-2009
|
6.00
|
Finished the canopy latch and drilled rear skirt.
|
Details
|
|
|
09-23-2009
|
4.00
|
More prep work to cover and forward strips.
|
Details
|
|
|
09-22-2009
|
2.00
|
Prepared canopy for help-opening handle.
|
Details
|
|
|
09-21-2009
|
8.00
|
Sanded and drilled getting ready for riveting.
|
Details
|
|
|
09-20-2009
|
6.00
|
Worked on side skirt and drilled out canopy holes.
|
Details
|
|
|
09-19-2009
|
3.00
|
Sanded and added more primer to skirt.
|
Details
|
|
|
09-18-2009
|
4.00
|
Primed the rear skirt with surface primer.
|
Details
|
|
|
09-16-2009
|
2.00
|
Rear skirt epoxy filler work
|
Details
|
|
|
09-06-2009
|
4.00
|
Six month represervation of IO-360 engine.
|
Details
|
|
|
09-05-2009
|
4.00
|
Sanded and drilled rear skirt.
|
Details
|
|
|
09-03-2009
|
4.00
|
More sanding on aft skirt.
|
Details
|
|
|
09-02-2009
|
4.00
|
Sanded filler and primed surface.
|
Details
|
|
|
09-01-2009
|
4.00
|
Started adding filler to aft skirt.
|
Details
|
|
|
08-31-2009
|
3.00
|
Removed aft skirt to trim off excess fiberglass.
|
Details
|
|
|
08-30-2009
|
2.00
|
Added three more fiberglass plies to aft skirt.
|
Details
|
|
|
08-29-2009
|
2.00
|
Saturated 3 plies of fiberglass to make rear skirt
|
Details
|
|
|
08-28-2009
|
7.00
|
Cut fiberglass cloth and taped off work area.
|
Details
|
|
|
08-26-2009
|
6.00
|
Fine tuned latch, installed roller botls & anchor
|
Details
|
|
|
08-25-2009
|
5.00
|
Tried forming (bending) the side skins for better
|
Details
|
|
|
08-24-2009
|
3.00
|
Trip to Home Depot for tools and stuff.
|
Details
|
|
|
08-21-2009
|
4.00
|
Tapped rear canopy bow to hold plexiglass.
|
Details
|
|
|
08-20-2009
|
3.50
|
Checked windshield fit after drilling and sanding.
|
Details
|
|
|
08-19-2009
|
5.50
|
Countersunk windshield and tapped roll bar.
|
Details
|
|
|
08-18-2009
|
6.00
|
Drilled and sanded the windshield.
|
Details
|
|
|
08-17-2009
|
4.00
|
Windshield prepped and rear skirt pattern made.
|
Details
|
|
|
08-16-2009
|
5.00
|
Installed the rear canopy anchor blocks.
|
Details
|
|
|
08-15-2009
|
3.00
|
Worked on canopy latch.
|
Details
|
|
|
08-13-2009
|
2.00
|
Practiced drilling plexiglass
|
Details
|
|
|
08-04-2009
|
4.00
|
Finished the front edge canopy trim strip.
|
Details
|
|
|
08-03-2009
|
4.00
|
Match drilled to canopy front edge.
|
Details
|
|
|
08-02-2009
|
4.00
|
Cut new canopy top cover and front strip.
|
Details
|
|
|
07-30-2009
|
5.00
|
Match drilled canopy braces to side skirts.
|
Details
|
|
|
07-29-2009
|
6.00
|
Fabricated canopy brace and match drilled.
|
Details
|
|
|
07-28-2009
|
5.00
|
Drilled side skirts to canopy frame.
|
Details
|
|
|
07-27-2009
|
4.00
|
Drilled side skirts.
|
Details
|
|
|
07-26-2009
|
5.00
|
Canopy trim pattern made.
|
Details
|
|
|
07-25-2009
|
4.00
|
Permanently installed roller tracks.
|
Details
|
|
|
07-23-2009
|
4.00
|
Sanded the canopy edges.
|
Details
|
|
|
07-21-2009
|
5.00
|
Checked windshield against canopy.
|
Details
|
|
|
07-20-2009
|
4.00
|
Drilled canopy to canopy frame.
|
Details
|
|
|
07-16-2009
|
4.00
|
Cut windshield to fit forward fuselage skin.
|
Details
|
|
|
07-15-2009
|
2.00
|
Clecoed on the forward fuselage skin.
|
Details
|
|
|
07-13-2009
|
4.00
|
Sanded edges of canopy and windshield.
|
Details
|
|
|
07-12-2009
|
6.00
|
Cut windshield and trimmed canopy.
|
Details
|
|
|
07-11-2009
|
3.00
|
Cut latch hole and clamped frame to bubble.
|
Details
|
|
|
07-09-2009
|
3.00
|
Fitted frame to bubble and marked latch hole.
|
Details
|
|
|
07-08-2009
|
2.00
|
Finally, the canopy frame is welded.
|
Details
|
|
|
07-07-2009
|
2.00
|
Getting canopy frame welded.
|
Details
|
|
|
07-05-2009
|
2.00
|
Rearranged the garage and pulled out the canopy.
|
Details
|
|
|
07-03-2009
|
4.00
|
Adjusted the right side bow before welding the bo
|
Details
|
|
|
07-01-2009
|
5.00
|
More canopy frame "cutting" and bending.
|
Details
|
|
|
06-29-2009
|
4.00
|
Forward cockpit tunnel area tasks.
|
Details
|
|
|
06-28-2009
|
4.00
|
Fabricated doubler for center tunnel cover.
|
Details
|
|
|
06-25-2009
|
6.00
|
More bending methods.
|
Details
|
|
|
06-24-2009
|
6.00
|
More bending the canopy frame.
|
Details
|
|
|
06-23-2009
|
6.00
|
Installed cabin heat box/tried bending canopy fram
|
Details
|
|
|
06-20-2009
|
5.00
|
Installed doubler and swivle eyeball pass throughs
|
Details
|
|
|
06-16-2009
|
3.00
|
Avery Tools order again.
|
Details
|
|
|
06-15-2009
|
5.00
|
Started firewall penetrations.
|
Details
|
|
|
06-13-2009
|
4.00
|
Constructed engine stand.
|
Details
|
|
|
06-08-2009
|
5.00
|
Marked firewall penetrations.
|
Details
|
|
|
06-07-2009
|
3.00
|
Riveted doubler for battery & starter relays,
|
Details
|
|
|
06-05-2009
|
4.00
|
Fabricated doubler for battery & starter relays.
|
Details
|
|
|
06-04-2009
|
4.00
|
Priming, painting, and mounting battery box.
|
Details
|
|
|
06-03-2009
|
3.00
|
More on the battery box.
|
Details
|
|
|
05-31-2009
|
5.00
|
The Odyssey battery box.
|
Details
|
|
|
05-30-2009
|
6.00
|
More canopy bending attempts.
|
Details
|
|
|
05-29-2009
|
4.00
|
Contiuing the canopy fitting.
|
Details
|
|
|
05-28-2009
|
4.00
|
Continue working on the canopy fit.
|
Details
|
|
|
05-26-2009
|
4.00
|
Trying to fit canopy frame.
|
Details
|
|
|
05-20-2009
|
4.00
|
Drilled and riveted canopy slider spacer & rail.
|
Details
|
|
|
05-19-2009
|
8.00
|
Finished riveting aft top skin; started canopy.
|
Details
|
|
|
05-18-2009
|
3.00
|
Continued riveting the forward aft top skin.
|
Details
|
|
|
05-17-2009
|
6.50
|
Started riveting the forward aft top skin.
|
Details
|
|
|
05-16-2009
|
4.00
|
Inventoried FWF Kit
|
Details
|
|
|
05-14-2009
|
6.00
|
Finished riveting panel, subpanel framework.
|
Details
|
|
|
05-08-2009
|
2.00
|
Ordered FWF Kit, Eng Vibration Mounts, & tools.
|
Details
|
|
|
05-06-2009
|
7.00
|
Riveted brackets and drilled roll bar brace.
|
Details
|
|
|
05-05-2009
|
1.00
|
Drilled holes for canopy deck bracket to hold pane
|
Details
|
|
|
05-04-2009
|
7.00
|
Finished installing the roll bar.
|
Details
|
|
|
05-03-2009
|
4.50
|
Finished trimming, prepping, & priming forward top
|
Details
|
|
|
05-02-2009
|
7.50
|
Fitting and match drilling top forward fuselage sk
|
Details
|
|
|
05-01-2009
|
4.00
|
Clecoed new skin to forward top fuselage.
|
Details
|
|
|
04-30-2009
|
6.00
|
Cut and drilled roll bar spacers.
|
Details
|
|
|
04-25-2009
|
6.00
|
Finished static system to panel, accomplished SB.
|
Details
|
|
|
04-21-2009
|
2.00
|
Clecoed top fuselage skin.
|
Details
|
|
|
04-13-2009
|
3.00
|
Drilled and riveted platenuts to fwd fuselage part
|
Details
|
|
|
04-04-2009
|
3.00
|
Electrical system design and planning.
|
Details
|
|
|
03-10-2009
|
3.50
|
Finished parts for fwd upper fuselage.
|
Details
|
|
|
03-09-2009
|
6.00
|
Started fabricating fwd top fuselage parts.
|
Details
|
|
|
02-23-2009
|
3.00
|
Finished aileron trim installation.
|
Details
|
|
|
02-17-2009
|
6.00
|
Started installing Aileron electric trim.
|
Details
|
|
|
02-16-2009
|
6.00
|
Finishing Kit arrived.
|
Details
|
|
|
02-10-2009
|
6.00
|
Installed sticks and drilled elevator horns.
|
Details
|
|
|
02-09-2009
|
4.00
|
Ground down pushrod hole in F-705 bulkhead.
|
Details
|
|
|
02-06-2009
|
5.00
|
Tried to install elevator pushrod.
|
Details
|
|
|
02-04-2009
|
4.00
|
Riveted AP pitch servo bracket to rib.
|
Details
|
|
|
02-02-2009
|
4.00
|
Begin Dynon AP pitch servo installation.
|
Details
|
|
|
02-01-2009
|
6.00
|
Installed brake hoses to master cylinders.
|
Details
|
|
|
01-31-2009
|
6.00
|
Bent fuel line tubes from tanks to fuel selector.
|
Details
|
|
|
01-30-2009
|
4.00
|
Finish parking brake & begin fuel tubes.
|
Details
|
|
|
01-29-2009
|
4.00
|
Complete parking brake install.
|
Details
|
|
|
01-28-2009
|
4.00
|
Parking brake bracket and placement.
|
Details
|
|
|
01-26-2009
|
6.00
|
Finish tube bending for boost pump kit.
|
Details
|
|
|
01-25-2009
|
6.00
|
Tube bending started.
|
Details
|
|
|
01-22-2009
|
4.00
|
Riveted pump cover & drilled holes in floor stiffn
|
Details
|
|
|
01-19-2009
|
4.00
|
Mounted boost pump and filter for trial fitting.
|
Details
|
|
|
01-18-2009
|
3.00
|
Started fabricating for Airflow Boost pump kit.
|
Details
|
|
|
01-03-2009
|
2.00
|
Installed brake reservoir.
|
Details
|
|
|
11-23-2008
|
4.00
|
Installed static ports and tubing.
|
Details
|
|
|
11-10-2008
|
4.00
|
Fabricated fuel vent tubing in fuselage.
|
Details
|
|
|
10-28-2008
|
5.00
|
Fabricated flap pushrods & primed elev. pushrods.
|
Details
|
|
|
10-26-2008
|
5.00
|
Made elevator push rods & installed stick control
|
Details
|
|
|
10-23-2008
|
4.00
|
Installed flap actutating system and AP servo.
|
Details
|
|
|
10-19-2008
|
6.00
|
Finished installing gear mount sockets.
|
Details
|
|
|
10-18-2008
|
5.00
|
Continue install gear mounts.
|
Details
|
|
|
10-17-2008
|
3.00
|
Started installing the gear mount sockets.
|
Details
|
|
|
09-30-2008
|
6.00
|
Painted cockpit and baggage area.
|
Details
|
|
|
09-29-2008
|
4.00
|
Painted cockpit and baggage parts & panels.
|
Details
|
|
|
09-28-2008
|
3.00
|
Match drilled gear sockets to gear legs.
|
Details
|
|
|
09-27-2008
|
5.00
|
Masked off the fuselage to paint cockpit area.
|
Details
|
|
|
09-25-2008
|
5.00
|
Set up paint booth in garage for cockpit painting.
|
Details
|
|
|
09-19-2008
|
2.50
|
Primed a batch of panels and parts.
|
Details
|
|
|
09-18-2008
|
6.50
|
Riveted steps and baggage floors/ side panels.
|
Details
|
|
|
09-17-2008
|
5.00
|
Finished flap actuator and clecoed step kit.
|
Details
|
|
|
09-16-2008
|
6.00
|
Worked on flap actuator and baggage floor.
|
Details
|
|
|
09-14-2008
|
3.00
|
Working on flap actuator parts.
|
Details
|
|
|
09-13-2008
|
3.00
|
Finished cutting out most parts for flap actuator.
|
Details
|
|
|
09-12-2008
|
3.00
|
Put in seat cushions to determine rudder placement
|
Details
|
|
|
09-11-2008
|
2.50
|
Moved wings to garage due to Hurricane Ike.
|
Details
|
|
|
09-09-2008
|
3.50
|
Started installing flap actuator assembly.
|
Details
|
|
|
09-08-2008
|
3.50
|
Match drilled firewall recess with center cover.
|
Details
|
|
|
09-07-2008
|
4.00
|
Match drilled center cabin cover.
|
Details
|
|
|
09-06-2008
|
5.00
|
Center Cabin Covers installment.
|
Details
|
|
|
08-14-2008
|
5.00
|
Riveted rudder assembly brace and firewall recess.
|
Details
|
|
|
08-13-2008
|
4.00
|
Riveted the seat backs and braces.
|
Details
|
|
|
08-12-2008
|
2.50
|
Primed seat parts and forward aft top skin.
|
Details
|
|
|
08-10-2008
|
5.00
|
Removed seat back brace slot angles to fix screw-u
|
Details
|
|
|
08-09-2008
|
6.00
|
Match drilled the seat backs and hinges using the
|
Details
|
|
|
08-08-2008
|
5.00
|
Marked and drilled holes on the seat support angle
|
Details
|
|
|
08-07-2008
|
4.00
|
Riveted forward tunnel cover and cut angles for se
|
Details
|
|
|
08-06-2008
|
1.50
|
Primed forward tunnel cover pieces.
|
Details
|
|
|
08-05-2008
|
5.50
|
Tunnel cover and seat support angles cut.
|
Details
|
|
|
08-04-2008
|
5.00
|
Removed fwd-aft skin for prep & started fabricatin
|
Details
|
|
|
08-03-2008
|
5.00
|
Installed skin stiffener rib and clecoed baggage f
|
Details
|
|
|
08-02-2008
|
5.00
|
Finished elev. bellcrank then clecoed fwd aft top
|
Details
|
|
|
07-25-2008
|
5.00
|
Riveted side rails and prepaired elev. bellcrank.
|
Details
|
|
|
07-24-2008
|
5.00
|
Fit left gear leg socket and modified side rails.
|
Details
|
|
|
07-23-2008
|
5.00
|
Drilled rudder assembly support brace and more.
|
Details
|
|
|
07-22-2008
|
5.00
|
Temporarily installed rudder pedal assembly.
|
Details
|
|
|
07-20-2008
|
5.00
|
Drill Step Kit plastic blocks to baggage rib, etc.
|
Details
|
|
|
07-19-2008
|
5.00
|
Finish preping rudder/brake pedals.
|
Details
|
|
|
07-18-2008
|
5.00
|
Drilled rudder/brake pedal angles and parts.
|
Details
|
|
|
07-16-2008
|
5.00
|
Finished fuel tank attach hardware fabrication.
|
Details
|
|
|
07-15-2008
|
5.00
|
Began fabricating fuel tank attach hardware.
|
Details
|
|
|
07-11-2008
|
5.00
|
Finish drilling right step.
|
Details
|
|
|
07-10-2008
|
6.00
|
Began installing right & left "Step Kits ".
|
Details
|
|
|
07-09-2008
|
4.00
|
Fitted flap end blocks to F-705 assembly.
|
Details
|
|
|
07-08-2008
|
6.00
|
Finish installing seat adjustment supports.
|
Details
|
|
|
07-06-2008
|
5.50
|
Install control sticks and hardware to fuselage.
|
Details
|
|
|
07-05-2008
|
4.00
|
Worked on QB Firewall.
|
Details
|
|
|
07-02-2008
|
1.00
|
Moved Fuselage to garage/Wings to patio deck.
|
Details
|
|