KitLog pro

Powered By Kitlog Pro v2.0

KENNETH T.'S WEB SITE
Work Logs Found: 195
Category Work Time: 867 Hours
 Date
Hours
Work Log Summary

Details

 06-19-2013
4.00
Still waiting for windshield advice.
Details
       

 06-18-2013
5.50
Trying to fit windshield.
Details
       

 06-15-2013
6.50
Finished forward top skin riveting.
Details
       

 06-08-2013
5.00
Started riveting the forward top skin.
Details
       

 06-07-2013
5.00
Prepaired forward top skin for riveting.
Details
       

 06-23-2012
2.00
Worked on nose wheel pant brackets.
Details
       

 06-05-2012
7.00
Removed Airflow pump to add Flaretite seals.
Details
       

 06-03-2012
4.00
Installed main gear legs and wheels.
Details
       

 06-01-2012
4.00
Pulled wires for fuel quantity senders.
Details
       

 05-30-2012
3.00
Tubes and tires installed to main wheels.
Details
       

 05-29-2012
9.00
Main landing gear wheels & brakes.
Details
       

 02-17-2012
4.00
Fabricated tail tie down and installed wing tie do
Details
       

 06-11-2011
2.50
Repaired Forest-of-tabs ground block.
Details

 06-10-2011
4.00
Finished riveting and attaching removed parts.
Details
       

 06-09-2011
6.00
Riveted foil to the FW.
Details
       

 06-08-2011
5.00
Continued with SS foil cutting/drilling.
Details
       

 06-07-2011
6.00
Marking and drilling holes in the foil.
Details
       

 06-06-2011
6.00
Begin FW insulation job.
Details

 06-04-2011
4.00
Removed FW items in prep to insulate.
Details
       

 06-03-2011
3.50
Installed SafeAir1 FW penetration kit.
Details

 06-02-2011
3.00
Fabricated supports for cables.
Details

 06-01-2011
4.50
Made FW penetration for cabin heat cable.
Details
       

 05-31-2011
3.50
Continued subpanel angle install.
Details
       

 05-30-2011
4.00
Temporarily installed throttle, prop, mixture, and
Details
       

 09-10-2010
8.00
Drilled holes for connectors and wire passage.
Details
       

 10-12-2009
3.00
Removed plastic protection from canopy.
Details
       

 10-01-2009
3.00
Sanded epoxy to remove bubbles than added another
Details
     

 09-30-2009
4.00
Sanded, primed, and epoxied the rear skirt.
Details
       

 09-29-2009
3.00
Sanded rear skirt and touch-up pinholes with fille
Details
     

 09-28-2009
6.00
Finished riveting side skirts and epoxied rear ski
Details
       

 09-27-2009
6.50
Riveted canopy plexiglass to frame.
Details
       

 09-26-2009
6.00
Painted canopy frame and cover strips.
Details
       

 09-25-2009
7.00
Made tool then sanded and primed rear skirt.
Details
       

 09-24-2009
6.00
Finished the canopy latch and drilled rear skirt.
Details
       

 09-23-2009
4.00
More prep work to cover and forward strips.
Details

 09-22-2009
2.00
Prepared canopy for help-opening handle.
Details

 09-21-2009
8.00
Sanded and drilled getting ready for riveting.
Details
       

 09-20-2009
6.00
Worked on side skirt and drilled out canopy holes.
Details
       

 09-19-2009
3.00
Sanded and added more primer to skirt.
Details
     

 09-18-2009
4.00
Primed the rear skirt with surface primer.
Details
     

 09-16-2009
2.00
Rear skirt epoxy filler work
Details
     

 09-06-2009
4.00
Six month represervation of IO-360 engine.
Details
       

 09-05-2009
4.00
Sanded and drilled rear skirt.
Details
       

 09-03-2009
4.00
More sanding on aft skirt.
Details
       

 09-02-2009
4.00
Sanded filler and primed surface.
Details
       

 09-01-2009
4.00
Started adding filler to aft skirt.
Details
       

 08-31-2009
3.00
Removed aft skirt to trim off excess fiberglass.
Details
       

 08-30-2009
2.00
Added three more fiberglass plies to aft skirt.
Details

 08-29-2009
2.00
Saturated 3 plies of fiberglass to make rear skirt
Details
       

 08-28-2009
7.00
Cut fiberglass cloth and taped off work area.
Details
       

 08-26-2009
6.00
Fine tuned latch, installed roller botls & anchor
Details
       

 08-25-2009
5.00
Tried forming (bending) the side skins for better
Details
     

 08-24-2009
3.00
Trip to Home Depot for tools and stuff.
Details
     

 08-21-2009
4.00
Tapped rear canopy bow to hold plexiglass.
Details
       

 08-20-2009
3.50
Checked windshield fit after drilling and sanding.
Details
     

 08-19-2009
5.50
Countersunk windshield and tapped roll bar.
Details
       

 08-18-2009
6.00
Drilled and sanded the windshield.
Details
       

 08-17-2009
4.00
Windshield prepped and rear skirt pattern made.
Details
     

 08-16-2009
5.00
Installed the rear canopy anchor blocks.
Details
       

 08-15-2009
3.00
Worked on canopy latch.
Details
     

 08-13-2009
2.00
Practiced drilling plexiglass
Details

 08-04-2009
4.00
Finished the front edge canopy trim strip.
Details
       

 08-03-2009
4.00
Match drilled to canopy front edge.
Details

 08-02-2009
4.00
Cut new canopy top cover and front strip.
Details

 07-30-2009
5.00
Match drilled canopy braces to side skirts.
Details
     

 07-29-2009
6.00
Fabricated canopy brace and match drilled.
Details
       

 07-28-2009
5.00
Drilled side skirts to canopy frame.
Details
       

 07-27-2009
4.00
Drilled side skirts.
Details
     

 07-26-2009
5.00
Canopy trim pattern made.
Details
       

 07-25-2009
4.00
Permanently installed roller tracks.
Details
       

 07-23-2009
4.00
Sanded the canopy edges.
Details
       

 07-21-2009
5.00
Checked windshield against canopy.
Details
     

 07-20-2009
4.00
Drilled canopy to canopy frame.
Details
       

 07-16-2009
4.00
Cut windshield to fit forward fuselage skin.
Details
       

 07-15-2009
2.00
Clecoed on the forward fuselage skin.
Details
     

 07-13-2009
4.00
Sanded edges of canopy and windshield.
Details
       

 07-12-2009
6.00
Cut windshield and trimmed canopy.
Details
       

 07-11-2009
3.00
Cut latch hole and clamped frame to bubble.
Details
       

 07-09-2009
3.00
Fitted frame to bubble and marked latch hole.
Details
       

 07-08-2009
2.00
Finally, the canopy frame is welded.
Details
       

 07-07-2009
2.00
Getting canopy frame welded.
Details

 07-05-2009
2.00
Rearranged the garage and pulled out the canopy.
Details
     

 07-03-2009
4.00
Adjusted the right side bow before welding the bo
Details
     

 07-01-2009
5.00
More canopy frame "cutting" and bending.
Details
       

 06-29-2009
4.00
Forward cockpit tunnel area tasks.
Details
       

 06-28-2009
4.00
Fabricated doubler for center tunnel cover.
Details
       

 06-25-2009
6.00
More bending methods.
Details
       

 06-24-2009
6.00
More bending the canopy frame.
Details
       

 06-23-2009
6.00
Installed cabin heat box/tried bending canopy fram
Details
       

 06-20-2009
5.00
Installed doubler and swivle eyeball pass throughs
Details
       

 06-16-2009
3.00
Avery Tools order again.
Details

 06-15-2009
5.00
Started firewall penetrations.
Details
       

 06-13-2009
4.00
Constructed engine stand.
Details
       

 06-08-2009
5.00
Marked firewall penetrations.
Details

 06-07-2009
3.00
Riveted doubler for battery & starter relays,
Details
     

 06-05-2009
4.00
Fabricated doubler for battery & starter relays.
Details
       

 06-04-2009
4.00
Priming, painting, and mounting battery box.
Details
       

 06-03-2009
3.00
More on the battery box.
Details
       

 05-31-2009
5.00
The Odyssey battery box.
Details
       

 05-30-2009
6.00
More canopy bending attempts.
Details
       

 05-29-2009
4.00
Contiuing the canopy fitting.
Details
     

 05-28-2009
4.00
Continue working on the canopy fit.
Details
       

 05-26-2009
4.00
Trying to fit canopy frame.
Details
       

 05-20-2009
4.00
Drilled and riveted canopy slider spacer & rail.
Details
       

 05-19-2009
8.00
Finished riveting aft top skin; started canopy.
Details
       

 05-18-2009
3.00
Continued riveting the forward aft top skin.
Details
       

 05-17-2009
6.50
Started riveting the forward aft top skin.
Details
       

 05-16-2009
4.00
Inventoried FWF Kit
Details

 05-14-2009
6.00
Finished riveting panel, subpanel framework.
Details
       

 05-08-2009
2.00
Ordered FWF Kit, Eng Vibration Mounts, & tools.
Details

 05-06-2009
7.00
Riveted brackets and drilled roll bar brace.
Details
       

 05-05-2009
1.00
Drilled holes for canopy deck bracket to hold pane
Details

 05-04-2009
7.00
Finished installing the roll bar.
Details
       

 05-03-2009
4.50
Finished trimming, prepping, & priming forward top
Details
       

 05-02-2009
7.50
Fitting and match drilling top forward fuselage sk
Details
       

 05-01-2009
4.00
Clecoed new skin to forward top fuselage.
Details
     

 04-30-2009
6.00
Cut and drilled roll bar spacers.
Details
       

 04-25-2009
6.00
Finished static system to panel, accomplished SB.
Details
       

 04-21-2009
2.00
Clecoed top fuselage skin.
Details
     

 04-13-2009
3.00
Drilled and riveted platenuts to fwd fuselage part
Details
       

 04-04-2009
3.00
Electrical system design and planning.
Details
       

 03-10-2009
3.50
Finished parts for fwd upper fuselage.
Details
       

 03-09-2009
6.00
Started fabricating fwd top fuselage parts.
Details
       

 02-23-2009
3.00
Finished aileron trim installation.
Details
       

 02-17-2009
6.00
Started installing Aileron electric trim.
Details
     

 02-16-2009
6.00
Finishing Kit arrived.
Details
       

 02-10-2009
6.00
Installed sticks and drilled elevator horns.
Details
       

 02-09-2009
4.00
Ground down pushrod hole in F-705 bulkhead.
Details
       

 02-06-2009
5.00
Tried to install elevator pushrod.
Details
       

 02-04-2009
4.00
Riveted AP pitch servo bracket to rib.
Details
     

 02-02-2009
4.00
Begin Dynon AP pitch servo installation.
Details
       

 02-01-2009
6.00
Installed brake hoses to master cylinders.
Details
       

 01-31-2009
6.00
Bent fuel line tubes from tanks to fuel selector.
Details
       

 01-30-2009
4.00
Finish parking brake & begin fuel tubes.
Details
       

 01-29-2009
4.00
Complete parking brake install.
Details
       

 01-28-2009
4.00
Parking brake bracket and placement.
Details
       

 01-26-2009
6.00
Finish tube bending for boost pump kit.
Details
       

 01-25-2009
6.00
Tube bending started.
Details
       

 01-22-2009
4.00
Riveted pump cover & drilled holes in floor stiffn
Details
       

 01-19-2009
4.00
Mounted boost pump and filter for trial fitting.
Details
       

 01-18-2009
3.00
Started fabricating for Airflow Boost pump kit.
Details
       

 01-03-2009
2.00
Installed brake reservoir.
Details
       

 11-23-2008
4.00
Installed static ports and tubing.
Details
       

 11-10-2008
4.00
Fabricated fuel vent tubing in fuselage.
Details
       

 10-28-2008
5.00
Fabricated flap pushrods & primed elev. pushrods.
Details
       

 10-26-2008
5.00
Made elevator push rods & installed stick control
Details
       

 10-23-2008
4.00
Installed flap actutating system and AP servo.
Details
       

 10-19-2008
6.00
Finished installing gear mount sockets.
Details
       

 10-18-2008
5.00
Continue install gear mounts.
Details
       

 10-17-2008
3.00
Started installing the gear mount sockets.
Details

 09-30-2008
6.00
Painted cockpit and baggage area.
Details
       

 09-29-2008
4.00
Painted cockpit and baggage parts & panels.
Details
       

 09-28-2008
3.00
Match drilled gear sockets to gear legs.
Details
       

 09-27-2008
5.00
Masked off the fuselage to paint cockpit area.
Details
       

 09-25-2008
5.00
Set up paint booth in garage for cockpit painting.
Details
       

 09-19-2008
2.50
Primed a batch of panels and parts.
Details
       

 09-18-2008
6.50
Riveted steps and baggage floors/ side panels.
Details
       

 09-17-2008
5.00
Finished flap actuator and clecoed step kit.
Details
       

 09-16-2008
6.00
Worked on flap actuator and baggage floor.
Details
       

 09-14-2008
3.00
Working on flap actuator parts.
Details
       

 09-13-2008
3.00
Finished cutting out most parts for flap actuator.
Details
     

 09-12-2008
3.00
Put in seat cushions to determine rudder placement
Details
       

 09-11-2008
2.50
Moved wings to garage due to Hurricane Ike.
Details

 09-09-2008
3.50
Started installing flap actuator assembly.
Details
       

 09-08-2008
3.50
Match drilled firewall recess with center cover.
Details
     

 09-07-2008
4.00
Match drilled center cabin cover.
Details
       

 09-06-2008
5.00
Center Cabin Covers installment.
Details
       

 08-14-2008
5.00
Riveted rudder assembly brace and firewall recess.
Details
       

 08-13-2008
4.00
Riveted the seat backs and braces.
Details
       

 08-12-2008
2.50
Primed seat parts and forward aft top skin.
Details
     

 08-10-2008
5.00
Removed seat back brace slot angles to fix screw-u
Details
     

 08-09-2008
6.00
Match drilled the seat backs and hinges using the
Details
       

 08-08-2008
5.00
Marked and drilled holes on the seat support angle
Details
       

 08-07-2008
4.00
Riveted forward tunnel cover and cut angles for se
Details
       

 08-06-2008
1.50
Primed forward tunnel cover pieces.
Details

 08-05-2008
5.50
Tunnel cover and seat support angles cut.
Details
       

 08-04-2008
5.00
Removed fwd-aft skin for prep & started fabricatin
Details
       

 08-03-2008
5.00
Installed skin stiffener rib and clecoed baggage f
Details
       

 08-02-2008
5.00
Finished elev. bellcrank then clecoed fwd aft top
Details
       

 07-25-2008
5.00
Riveted side rails and prepaired elev. bellcrank.
Details
       

 07-24-2008
5.00
Fit left gear leg socket and modified side rails.
Details
       

 07-23-2008
5.00
Drilled rudder assembly support brace and more.
Details
       

 07-22-2008
5.00
Temporarily installed rudder pedal assembly.
Details
       

 07-20-2008
5.00
Drill Step Kit plastic blocks to baggage rib, etc.
Details
       

 07-19-2008
5.00
Finish preping rudder/brake pedals.
Details
       

 07-18-2008
5.00
Drilled rudder/brake pedal angles and parts.
Details
       

 07-16-2008
5.00
Finished fuel tank attach hardware fabrication.
Details
       

 07-15-2008
5.00
Began fabricating fuel tank attach hardware.
Details
       

 07-11-2008
5.00
Finish drilling right step.
Details
       

 07-10-2008
6.00
Began installing right & left "Step Kits ".
Details
       

 07-09-2008
4.00
Fitted flap end blocks to F-705 assembly.
Details
     

 07-08-2008
6.00
Finish installing seat adjustment supports.
Details
       

 07-06-2008
5.50
Install control sticks and hardware to fuselage.
Details
       

 07-05-2008
4.00
Worked on QB Firewall.
Details
       

 07-02-2008
1.00
Moved Fuselage to garage/Wings to patio deck.
Details










Copyright © 2001-2024 Matronics. All Rights Reserved.