KitLog pro

Powered By Kitlog Pro v2.0

Marks Rans Courier Project
Work Logs Found: 26
Category Work Time: 88 Hours
 Date
Hours
Work Log Summary

Details

 06-13-2009
1.50
Install Transponder Antenna
Details

 02-25-2009
4.00
Install boot cowl and instrument panel
Details
       

 02-16-2009
3.00
Boot cowl and wiring
Details
       

 02-15-2009
1.50
Install nutserts
Details
       

 02-14-2009
2.00
Cover glare shield with fabric
Details
     

 02-08-2009
3.00
Install static air lines
Details
       

 10-31-2008
4.00
Choke and parking brake control cables
Details
       

 10-21-2008
3.00
Apply labels to sub-panels and install incl breake
Details
       

 10-20-2008
2.00
pre-install and paint sub-panels
Details

 10-18-2008
6.00
Sub-panel (first version)
Details

 10-17-2008
3.00
Began wiring instrument gauges

 10-05-2008
4.00
redesign circuits
Details

 10-04-2008
4.00
Wire engine instruments
Details

 09-28-2008
6.00
Modify glare shield
Details
       

 09-28-2008
3.00
install radio and transponder into panel
       

 09-27-2008
4.00
Install switches and flight instruments into panel
       

 09-26-2008
3.00
Create and apply labels to panel
Details
     

 09-21-2008
5.00
finish cutting holes and pre-fit the panel
Details
       

 09-20-2008
4.00
Cutting gauge and instrument holes
Details
       

 09-19-2008
4.00
cut instrument, gauge and switch holes in panel
Details
     

 09-17-2008
2.00
Final (?) panel layout
Details

 09-14-2008
2.00
Panel layout
Details

 08-25-2008
1.50
Measuring instruments for final panel layout
Details

 08-23-2008
6.00
fabricate panel #1
Details

 08-11-2008
5.00
Panel layout
Details

 06-16-2008
1.00
Cover glare-shield with fabric
Details
       










Copyright © 2001-2024 Matronics. All Rights Reserved.