KitLog pro

Powered By Kitlog Pro v2.0

Pauls Searey
Work Logs Found: 38
Category Work Time: 64 Hours
 Date
Hours
Work Log Summary

Details

 04-13-2010
3.00
hull trim
Details
       

 02-22-2009
2.00
boom tube cover expansion plates
Details
       

 02-21-2009
3.00
Fitting boom tube cover
Details
       

 02-19-2009
1.00
kevlar tape on boom tube cover
Details
     

 02-05-2009
2.00
tow ring
Details
       

 01-28-2009
0.70
transom rubber seal
Details
     

 10-18-2008
1.00
sealing cables through transom
Details
       

 08-24-2008
1.00
gear leg boots
Details
       

 08-15-2008
1.00
sealing boom tube rest & retraction cable hole
Details
       

 08-09-2008
2.00
aft hull mount angles & collar
Details
       

 08-08-2008
0.50
hull to upper bulkhead bolts
Details
       

 08-08-2008
3.00
bolting frame into hull
Details
       

 08-06-2008
0.50
resin coating cutouts
Details
     

 08-05-2008
3.00
main gear cutouts
Details
       

 08-05-2008
2.00
check fitting of aft hull mount angles
Details
       

 07-23-2008
2.00
transom
Details
       

 07-21-2008
2.00
boom/transom attachment angles
Details
       

 07-16-2008
1.50
lower bulkhead doubler
Details
       

 07-15-2008
2.00
painting brackets
Details
       

 07-15-2008
0.50
forward stringer drain holes
Details
       

 07-15-2008
1.00
forward centre stringer mount
Details
       

 07-11-2008
1.00
priming support plates
Details
     

 07-10-2008
4.00
Forward stringer mounting plates
Details
       

 07-09-2008
3.00
rear stringer mounts
Details
       

 07-09-2008
3.00
rear stringer mounts
Details
       

 07-08-2008
1.00
upper bulkhead fitment
Details
       

 07-08-2008
1.00
Transom
Details
       

 07-07-2008
1.00
Transom
Details
       

 07-07-2008
1.00
Stringer strengthening
Details
     

 07-07-2008
1.00
Forward stringer mounting points
Details
       

 07-05-2008
1.50
Hull strengthening
Details
     

 07-04-2008
1.50
hull strengthening
Details
     

 07-02-2008
0.10
more hull fitting photos
Details
       

 07-02-2008
1.25
Hull strengthening
Details
     

 07-01-2008
4.00
Hull fitting
Details
       

 05-17-2008
1.00
Skid plate
Details
     

 05-17-2008
4.00
paint hull interior and fit bungs
Details
       

 04-10-2008
0.00
Painting hull
Details
     










Copyright © 2001-2024 Matronics. All Rights Reserved.