Powered By Kitlog Pro v2.0
Pauls Searey
Searey
Corrosion proofing
Work Logs Found:
14
Category Work Time:
17 Hours
Date
Hours
Work Log Summary
Details
04-15-2010
2.00
linseed oil struts & float parts
Details
03-10-2010
2.00
pylon seals
Details
03-02-2009
1.00
linseed oil flaps/ailerons
Details
02-06-2009
2.00
linseed oil wing tubes
Details
07-22-2008
1.00
boom tube painting
Details
07-21-2008
1.00
primed rear of boom tube etc
Details
07-21-2008
1.00
linsed oil elevator & stabilizer
Details
06-22-2008
0.50
More corrosion proofing gear legs
Details
06-11-2008
1.00
gear leg sealing
Details
04-08-2008
1.20
Vertical fin corrosion proofing
Details
01-04-2008
2.00
Linseed oil tubes
Details
12-23-2007
1.00
Corrosion proofing tubes
Details
12-22-2007
0.50
Linseed oil
Details
12-18-2007
0.70
Linseed oil
Details
SITE NAVIGATION
Contact Builder
Searey Home
Category
# Logs
# Hours
All
535
1118
Ailerons
6
13
Avionics
4
4
Boom
9
22
Brakes
4
8
Bulkhead
3
4
Cockpit
1
1
Controls
26
42
Corrosion proofing
14
17
Crate Delivery
2
5
Crate Delivery & tra
2
5
Electrics
26
56
Engine
19
40
Fabric covering
46
100
Flaps
7
11
Floats & struts
2
4
Forward cockpit
3
8
Fuel system
21
32
Fuselage
1
0
Gap seals
6
16
Hinges
2
5
Hull
38
64
Inspection
11
16
Instrument panel
27
52
Instrument panel wir
9
85
Interior trim
22
43
Labels
4
4
Labels & data plates
4
4
Landing gear
34
47
Lighting
6
9
Marine
3
6
Miscellaneous
1
0
Nose Deck
4
10
Paintwork
22
59
Pitot
9
15
Pitot/static system
9
15
Prop
1
3
Root support
7
10
rudder, stabiliser &
5
12
Seat belts
2
2
Side covers
10
23
stabiliser & elevato
5
12
Throttle cables
2
4
Trim
5
10
Turtle Deck
15
36
Tyres & wheels
5
5
Vertical fin
7
11
Vertical fin & stabi
7
11
video camera
1
2
Weight & Balance
1
3
Windshield & sliding
10
34
Wings
45
118
Copyright © 2001-2024 Matronics. All Rights Reserved.