KitLog pro

Powered By Kitlog Pro v2.0

RANDY'S WEB SITE
Work Logs Found: 10
Category Work Time: 30 Hours
 Date
Hours
Work Log Summary

Details

 03-30-2009
4.00
Bent stabilizer spar and doublers, repaired brake.
Details

 10-26-2008
4.00
Fabricate Horizontal Stabilizer Ribs.
Details
     

 10-24-2008
2.00
Fabricated Horizontal Stabilizer Rib Form Blocks
Details
     

 06-30-2008
3.00
Deburr, prime and install elevator skin.
Details
       

 06-28-2008
3.00
Fabricate elevator skin, drill and cleco
Details
       

 06-27-2008
3.00
Assemble elevator skeleton
Details
       

 06-16-2008
2.00
Fabricate elevator channel and brackets
Details

 06-02-2008
4.00
Fabricate elevator nose ribs and elevator spar
Details
     

 05-31-2008
2.00
Fabricate elevator rib form blocks and elevator ri
Details
       

 05-28-2008
3.00
Made elevator tip ribs.
Details
       










Copyright © 2001-2024 Matronics. All Rights Reserved.