Powered By Kitlog Pro v2.0
RANDY'S WEB SITE
CH-701
Horizontal Tail
Work Logs Found:
10
Category Work Time:
30 Hours
Date
Hours
Work Log Summary
Details
03-30-2009
4.00
Bent stabilizer spar and doublers, repaired brake.
Details
10-26-2008
4.00
Fabricate Horizontal Stabilizer Ribs.
Details
10-24-2008
2.00
Fabricated Horizontal Stabilizer Rib Form Blocks
Details
06-30-2008
3.00
Deburr, prime and install elevator skin.
Details
06-28-2008
3.00
Fabricate elevator skin, drill and cleco
Details
06-27-2008
3.00
Assemble elevator skeleton
Details
06-16-2008
2.00
Fabricate elevator channel and brackets
Details
06-02-2008
4.00
Fabricate elevator nose ribs and elevator spar
Details
05-31-2008
2.00
Fabricate elevator rib form blocks and elevator ri
Details
05-28-2008
3.00
Made elevator tip ribs.
Details
SITE NAVIGATION
Contact Builder
CH-701 Home
Category
# Logs
# Hours
All
19
58
Horizontal Tail
10
30
Rudder
8
27
Tools
1
1
Copyright © 2001-2024 Matronics. All Rights Reserved.